37 Critical document templates for Principal Contractors: User Manual Index
Purpose and outcome (what “good” looks like)
This form is used to check and record that a subcontractor is:
- Competent — the people doing the work know how to do it safely and to a good standard.
- Capable — they have the right supervision, labour, plant, time, and paperwork to deliver the job without cutting corners.
Good completion means the form shows clear, job-specific checks were made, any gaps are listed with actions and deadlines, and the decision (approved / approved with conditions / not approved) is justified with short notes and evidence.
Who uses it (simple roles)
| Role | What they do | When |
|---|---|---|
| Buyer / QS / Contracts manager | Runs Stage 1 (procurement) checks; chases evidence; sets conditions in the order/subcontract. | Before appointing / placing the order |
| Site manager / Supervisor | Runs Stage 2 (pre-start) confirmation; checks who is turning up, what plant is coming, and whether RAMS still match the job. | Before first day on site (and if things change) |
| H&S adviser (if you have one) | Supports higher-risk packages; checks RAMS quality; helps decide what’s “proportionate” evidence. | As needed; especially for high risk |
| Subcontractor supervisor | Provides evidence; confirms method, people, plant, certificates; closes actions. | During procurement and again pre-start |
| Project admin / Document controller (or the person who files) | Stores the signed form and evidence in the job file with version control. | After each stage and on updates |
When to use it (two-stage check)
- Stage 1 – Procurement: before placing the order / issuing the subcontract. This is your “should we use them?” check.
- Stage 2 – Pre-start: just before they start on site (often at pre-start meeting or first-day induction). This is your “is it still the same job and same people/plant?” check.
- Use it again if something changes: scope, programme, key people, plant, method, work area, or risk level.
Rule of thumb: the higher the risk (height, lifting, excavations, hot works, live services, public interface), the tighter your checks and the clearer your evidence should be.
Before you start (what to gather)
Have these ready so you’re not guessing or filling it in from memory:
- Scope and programme: what they’re doing, where, start date, duration, and interfaces with other trades.
- Names: their supervisor/foreman, and (if known) the operatives who will attend.
- RAMS: risk assessment and method statement that matches your job (not a generic PDF).
- Training/competence evidence (as relevant): card numbers, certificates, screenshots, or a quick list you can verify (e.g., CSCS, CPCS/NPORS, IPAF, PASMA, first aid).
- Plant and certification (as relevant): LOLER, inspection records, maintenance/PUWER arrangements, PAT approach where appropriate.
- Insurance: policy schedule/certificate and expiry dates (PL/EL; PI if design responsibility).
- Previous performance info: your own notes, defect lists, site observations, or references if you’ve not used them before.
Keep it sensible: you don’t need a mountain of paperwork for low-risk, short-duration tasks, but you do need enough to show you checked properly.
How to complete it (step-by-step)
Step 1: Fill in the project and contractor details
- Enter the correct project name/number and site address (helps filing and audits).
- Record the subcontractor’s main contact and the trade/package.
- Add planned start date and duration (capability depends on dates).
Step 2: Describe the work and interfaces (don’t skip this)
- Write a short scope in plain terms (what they will physically do).
- Note where they will work and who they could affect (other trades, public, neighbours).
- Confirm if they have any design responsibility or if they will use their own sub-subcontractors.
Why it matters: if the scope is unclear, the RAMS will be wrong and your competency checks won’t match the real risk.
Step 3: Complete the competence checks (people)
- Make sure a named supervisor/foreman is identified.
- Check the operatives have the right experience for the tasks (especially the “awkward bits” of the job).
- Where relevant, record card/cert details (numbers and expiry are enough if you’ve seen copies).
- Consider communication: how will briefings be understood on site?
Tip: use the “Evidence/notes” column to record what you actually saw (e.g., “IPAF 3a/3b, exp 06/2027, copy saved in job folder”).
Step 4: Complete the capability checks (can they deliver?)
- Confirm numbers of people available for your dates (and what happens if someone is off).
- Check supervision level matches risk and site size.
- Confirm plant/tools are suitable and available (include any hire arrangements).
- Talk through lead times and sequencing so there’s no pressure to rush or “make do”.
- Ask for similar job examples (one or two is enough if genuine).
Step 5: Health & safety basics (RAMS and site rules)
- Read the RAMS and check it’s specific: correct site, correct task steps, and real controls.
- Check it includes permits and emergency arrangements where needed (e.g., hot works, confined spaces).
- Confirm induction/briefing plan: who briefs, when, and how changes are handled.
- Confirm they know how to report near misses and accidents on your site.
Minimum standard: a method that someone could follow on site, not a generic risk list.
Step 6: Key risk experience (tick what applies and add controls)
- Tick “Yes” only if it genuinely applies to their scope.
- In the notes, write the main controls you expect to see on site (e.g., edge protection, exclusion zones, permits, service scans).
- If they say “Yes” to a high-risk area, make sure the competence and plant sections back it up.
Step 7: Plant, equipment and certification
- Only complete what’s relevant, but don’t miss key items (LOLER for lifting, inspection processes for towers/MEWPs, defect reporting).
- Record certificate references/expiry where you can.
- If plant is hired, confirm who supplies, who inspects, and who is trained to use it.
Step 8: Previous performance
- If you’ve used them before, be honest: quality, housekeeping, attitude to RAMS, reporting.
- If you haven’t used them, note what checks you did (e.g., a reference call, review of past work, recommendation source).
Step 9: Insurance and compliance
- Check the insurance types match the job and are in date.
- If they have design/spec responsibility, consider whether professional indemnity is needed.
- Note any licences/registrations that apply to the package.
Step 10: Make the decision and list actions
- Select Approved, Approved with conditions, or Not approved.
- If there are issues, write actions in plain terms: what needs doing, who will do it, and by when.
- Do not allow work to start if conditions are “must close before start”.
Step 11: Sign-off the two stages
- Stage 1 sign-off: the person appointing (or recommending appointment) signs to confirm checks were done.
- Stage 2 sign-off: the site manager/supervisor confirms nothing has changed and the subcontractor is still suitable.
- Answer the pre-start “anything changed?” question properly (people, plant, RAMS, programme, scope).
Review and approval (what to check before signing)
- Are the checks proportionate? Higher risk packages should have stronger evidence and clearer notes.
- Do RAMS match the scope and site? Watch for copied site names, missing steps, or vague controls.
- Is there a named supervisor? If not, that’s usually a stop point.
- Are plant certs in date where needed? If not, stop and resolve before start.
- Are conditions genuinely closed? Don’t sign Stage 2 based on promises.
Escalate / pause the start if you see red flags like generic RAMS, expired LOLER, unclear lifting/excavation controls, “we’ll sort it on the day”, or poor previous site behaviour.
Recordkeeping (filing, retention, audit-ready)
| Item | What to do |
|---|---|
| Where to store | Keep the signed form in the project file (digital folder or site file), alongside subcontract order and RAMS. |
| What to store with it | Save key evidence you relied on (RAMS, insurance, relevant certs/IDs, plant certificates, reference notes). Keep it tidy and proportionate. |
| Version control | If updated, save as a new version (e.g., “Stage 1”, “Stage 2”, or date-stamped). Don’t overwrite without trace. |
| Retention | Keep with the job records for your normal project retention period. As a practical minimum, retain for the life of the job plus a reasonable period afterwards in case of queries or claims. |
| Audit readiness | Anyone should be able to see: what work they did, what you checked, what evidence you saw, what actions were raised, and who signed. |
How often to review or update
- Always do Stage 2 pre-start confirmation before first attendance on site.
- Re-check (update the form or add an addendum note) if:
- their supervisor/crew changes;
- their plant changes (especially lifting, MEWPs, excavators);
- scope or method changes;
- programme changes create pressure (weekend work, short notice accelerations);
- there is an incident, repeated non-conformance, or poor site behaviour.
Common mistakes (and how to avoid them)
| Pitfall | Avoid it by… |
|---|---|
| Filling it in after they’ve already started | Make it a gate: no order (Stage 1) and no start (Stage 2) until signed. |
| “Tick-box” completion with no notes | Write short evidence notes (what you checked, certificate refs, who you spoke to). |
| Accepting generic RAMS | Send it back and ask for job-specific steps, controls, and permits. Check it matches your site and scope. |
| No named supervisor or unclear control on site | Require a named supervisor/foreman and confirm they will be present when high-risk work is happening. |
| Not checking plant certification until the plant arrives | Ask for certs in advance for lifting/height-related plant, and confirm the inspection process. |
| Conditions raised but never closed out | List actions with owner and date; review at pre-start; don’t allow start until “must close” items are done. |
| Stage 2 skipped because “we used them last month” | Do the quick confirmation anyway—people and plant change all the time. |
| Overkill paperwork for low-risk work | Keep evidence proportionate, but still record the key checks and decision. |
Worked example (realistic scenario)
Job: Small refurb project. Subcontractor appointed for installing steel beam with padstones and making good. Requires temporary propping, lifting the beam, and work at height from a tower.
- Stage 1 (procurement): You record scope and interfaces (other trades below). You ask for RAMS covering delivery, unloading, exclusion zone, propping sequence, lifting method, and tower use.
- Competence: Subcontractor provides a named supervisor and confirms operatives have done similar installs. You note relevant training (e.g., PASMA for tower user; telehandler operator ticket if they’re using one).
- Plant/certs: You request LOLER for lifting accessories (if used) and confirm tower inspection process. You note certificate references and expiry dates.
- Decision: “Approved with conditions” because RAMS are missing a clear exclusion zone plan and do not state who inspects the tower. Action: “Update RAMS with exclusion zone and tower inspection responsibility, by Friday 12:00.”
- Stage 2 (pre-start): On the morning before start, the site manager confirms the same supervisor is attending, the tower is arriving as planned, the updated RAMS are on site, and the team are briefed at induction. Conditions closed, so the job starts.
Quick on-site prompts (useful questions)
- “Who is your supervisor today, and will they be here all shift?”
- “Talk me through the job steps in order—what’s the tricky bit?”
- “What plant are you using, and what’s the back-up if it’s not available?”
- “Show me where the RAMS covers the key risk on this job (height/lifting/excavation/hot works).”
- “What changes since tender/quote—people, plant, method, dates?”
Principal Contractor Support
Running a CDM Project as Principal Contractor?
Get the structure, advice, and documentation support you need to manage the role properly.
When you take on the Principal Contractor role, the responsibility for the Construction Phase Plan, site safety records, RAMS, and CDM compliance usually lands on the desk of a busy director or site manager.
CTC South West provides practical advisory support and structured systems that help you keep your documentation organised, your responsibilities clear, and your projects ready for client checks or audits.
Expert CDM support, site-ready documentation, and organised compliance records — all built around how construction projects actually run.
- Construction Phase Plans structured and ready for client review
- RAMS and project documentation tailored to your actual work
- Ongoing competent person support for Principal Contractors