Risk Assessment and Method Statement Template for Landscaping, Gardening and Arboriculture Works
This document should not be used until it has been thoroughly reviewed by a competent person.
| Company name: | |
| Project title: | |
| Location: | |
| Contract No: | |
| Author: | |
| Reviewed by: | |
| Date: | |
| Signature: |
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
RAMS : Landscaping, Gardening and Arboriculture Works
Site Specific Instructions
Delivery of Materials
- Work Process: Materials will be delivered to the designated area using appropriate vehicles. Personnel will ensure materials are unloaded safely and stored in a secure location.
- Hazards: Manual handling injuries, vehicle movement risks, slips, trips, and falls.
Earth Moving
- Work Process: Utilise mechanical equipment such as mini-excavators to move earth. Operators must be trained and competent.
- Hazards: Equipment overturning, contact with underground services, noise and vibration exposure.
Gardening and Setting of Plants
- Work Process: Manual planting of shrubs and plants using hand tools. Ensure correct spacing and depth as per specifications.
- Hazards: Repetitive strain injuries, cuts from tools, exposure to weather conditions.
Tree Felling or Surgery
- Work Process: Conduct tree felling using chainsaws and other arboricultural equipment. Ensure exclusion zones are established.
- Hazards: Falling branches, chainsaw injuries, working at height.
Bush Cutting Using a Strimmer
- Work Process: Operate strimmer to cut bushes and undergrowth. Ensure guards are in place and PPE is worn.
- Hazards: Flying debris, noise exposure, contact with moving parts.
Application of Weed Killer
- Work Process: Apply weed killer using backpack sprayers or handheld equipment. Follow manufacturer’s instructions for dilution and application.
- Hazards: Chemical exposure, environmental contamination, inhalation risks.
Use of Wood Chipper
- Work Process: Feed branches into wood chipper ensuring safe distance is maintained. Only trained personnel to operate.
- Hazards: Entanglement, noise exposure, flying debris.
Use of Mobile Stump Grinder
- Work Process: Position stump grinder over stump and operate as per manufacturer’s guidelines. Ensure area is clear of bystanders.
- Hazards: Contact with moving parts, noise exposure, flying debris.
Re-positioning of Stump Grinder
- Work Process: Safely manoeuvre stump grinder to new location using appropriate lifting techniques or equipment.
- Hazards: Manual handling injuries, equipment instability.
Pre-planting Spraying of Container Grown Seedlings
- Work Process: Spray seedlings with appropriate solution prior to planting. Use handheld sprayers and follow safety data sheets.
- Hazards: Chemical exposure, inhalation risks, skin irritation.
Application of Pesticides by Hand-held Equipment
- Work Process: Apply pesticides using handheld sprayers ensuring correct PPE is worn. Follow COSHH assessments.
- Hazards: Chemical exposure, environmental contamination, inhalation risks.
Use of Clearing Saw/Strimmer
- Work Process: Operate clearing saw or strimmer to clear vegetation. Ensure equipment is maintained and operators are trained.
- Hazards: Noise exposure, flying debris, contact with moving parts.
Note: All personnel must wear appropriate personal protective equipment (PPE) relevant to each task and adhere to site-specific safety protocols.
Site Specific Hazards
Manual handling : Low (1)
Who might be harmed: Landscaping and gardening workers | Arborists | Delivery personnel
Type of harm: Back / Spinal Injury | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Muscular Injury
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Site workers | Delivery personnel | Visitors to the site | Subcontractors
Type of harm:
Back / Spinal Injury | Broken Bones | Cuts and Abrasions | Death | Head Injury | Multiple / Various Injury | Muscular Injury
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Operatives | Site supervisors | Nearby workers
Type of harm:
Permanent Hearing Damage
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Operatives using vibrating equipment
Type of harm:
HAVS / Vibration White Finger
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Site workers | Visitors to the site | Members of the public | Subcontractors
Type of harm:
Cuts and Abrasions | Eye Damage | Head Injury
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping and gardening workers | Arborists | Site visitors | Nearby residents
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Burns | Dermatitis | Respiratory damage / Asthma / COPD
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Operatives | Site supervisors | Maintenance personnel
Type of harm:
Amputation | Crush / Entrapment | Cuts and Abrasions | Death | Eye Damage | Head Injury
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Site workers | Visitors to the site | Members of the public | Subcontractors
Type of harm:
Broken Bones | Crush / Entrapment | Death | Head Injury | Multiple / Various Injury
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Site operatives | Subcontractors | Maintenance personnel
Type of harm:
Burns | Death | Electrocution
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Site workers | Delivery personnel | Supervisors and managers | Subcontractors
Type of harm:
Cold / Pneumonia | Death | Heat Stroke / Exhaustion | Illness
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Site workers | Visitors to the site | Members of the public | Subcontractors
Type of harm:
Illness | Dermatitis
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Site workers | Delivery drivers | Visitors to the site | Pedestrians in the vicinity
Type of harm:
Amputation | Back / Spinal Injury | Broken Bones | Crush / Entrapment | Death | Head Injury | Multiple / Various Injury
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
All personnel involved in the landscaping, gardening, and arboriculture works must possess the necessary qualifications and experience relevant to their specific tasks. Competence is to be verified through the following procedures: Verification of Qualifications: All operatives must provide evidence of relevant qualifications, such as certificates in horticulture, arboriculture, or related fields. This includes, but is not limited to, NPTC certification for chainsaw operations and PA1/PA6 certification for pesticide application. Experience Assessment: Personnel must demonstrate prior experience in similar projects. This will be assessed through a review of previous work history and references. Task-Specific Training: Operatives must undergo task-specific training sessions, which include: Induction Programme: All personnel are required to attend a site-specific induction programme that covers: Ongoing Competence Monitoring: Supervisors will conduct regular assessments to ensure continued competence. This includes observing work practises and providing feedback or additional training as necessary. Supervision: A competent supervisor with extensive experience in landscaping and arboriculture will oversee all activities to ensure compliance with safety standards and project specifications. By adhering to these procedures, the project ensures that all personnel are adequately prepared and competent to perform their tasks safely and effectively. All personnel involved in the landscaping, gardening, and arboriculture works shall undergo a comprehensive site induction prior to commencing any tasks. This induction will be conducted by the Site Manager and will cover the following key areas: Identification of Hazards: Specific hazards associated with landscaping, gardening, and arboriculture activities, such as the use of sharp tools, handling of chemicals, and operation of machinery like wood chippers and stump grinders, will be highlighted. Safe Work Practises: Detailed instructions on safe work practises for each task, including tree felling, bush cutting, and application of pesticides, will be provided. Emphasis will be placed on maintaining safe distances from operating machinery and proper handling techniques for hazardous substances. Use of Personal Protective Equipment (PPE): The induction will specify the required PPE for each activity, such as helmets, gloves, eye protection, and hearing protection, particularly when operating equipment like strimmers and clearing saws. Emergency Procedures: Procedures for dealing with emergencies specific to the nature of the work, such as injuries from tools or exposure to chemicals, will be explained. The location of first aid kits and emergency contact numbers will be communicated. Training Requirements: Personnel must demonstrate competence in the use of specialised equipment such as mobile stump grinders and wood chippers. Verification of relevant training certificates or qualifications will be required before individuals are permitted to operate such machinery. Environmental Considerations: Instructions on minimising environmental impact during operations, including proper disposal of waste materials and adherence to guidelines for the application of weed killers and pesticides, will be included. Attendance at the induction will be recorded, and all personnel must sign an acknowledgment form confirming their understanding of the procedures and their commitment to adhere to them throughout the project duration. All personnel involved in the landscaping, gardening, and arboriculture works shall utilise designated access routes to and from the work areas. These routes must be clearly marked and maintained free from obstructions at all times to ensure safe passage. Access Points: Egress Routes: Vehicle Movement: Pedestrian Safety: Signage: Monitoring: All personnel engaged in landscaping, gardening, and arboriculture works shall have access to appropriate welfare facilities throughout the duration of the project. Welfare units will be strategically positioned on-site to ensure ease of access for all workers. These units will include: Sanitary conveniences: Clean and well-maintained toilets with handwashing facilities will be provided. Hand sanitiser stations will be available where running water is not feasible. Rest areas: Designated rest areas will be established, offering shelter from adverse weather conditions. These areas will be equipped with seating and tables to facilitate meal breaks. Drinking water: Potable water supplies will be readily accessible to all workers. Water containers will be regularly replenished and clearly marked. Changing facilities: Where necessary, changing rooms will be provided for workers to change into and out of personal protective equipment (PPE). First aid: A fully stocked first aid kit will be available within the welfare unit, and a trained first aider will be present on-site at all times. Regular inspections of welfare facilities will be conducted to ensure compliance with health and safety standards. Any issues identified during inspections will be promptly addressed to maintain a safe and comfortable working environment for all personnel involved in the landscaping, gardening, and arboriculture activities. All personnel involved in the landscaping, gardening, and arboriculture works must ensure compliance with the following procedures regarding special permits: Permit to Work: Prior to commencing any tree felling or surgery, a Permit to Work must be obtained. This ensures that all necessary precautions are in place to manage risks associated with working at height and potential falling debris. Hot Work Permit: If any equipment used during the works, such as a stump grinder or wood chipper, generates heat or sparks, a Hot Work Permit is required. This is crucial to prevent fire hazards, especially in dry conditions or near flammable materials. Chemical Application Permit: For the application of weed killer and pesticides, a Chemical Application Permit must be secured. This ensures that all personnel are aware of the specific chemicals being used, their potential hazards, and the necessary protective measures. Noise Permit: When using equipment such as strimmers, clearing saws, or wood chippers, a Noise Permit may be necessary if operations are conducted in proximity to residential areas or sensitive environments. This permit will outline acceptable noise levels and any required mitigation measures. Environmental Permit: If the project involves work near protected habitats or watercourses, an Environmental Permit must be obtained. This ensures that all activities comply with environmental regulations and do not adversely affect local ecosystems. All permits must be reviewed and authorised by the site manager before work commences. Copies of all permits should be readily available on-site for inspection by relevant authorities. Compliance with these procedures is mandatory to ensure the safety and legality of the operations. All tools and equipment utilised in the landscaping, gardening, and arboriculture works must be inspected prior to use to ensure they are in good working condition. Daily checks are mandatory, with any defects reported immediately and the equipment taken out of service until repaired. Earth moving equipment must be operated by trained personnel only. Operators must ensure that all safety features are functional and that the equipment is used within its operational limits. For tree felling or surgery, chainsaws and other cutting tools must be maintained according to the manufacturer’s specifications. Operators must wear appropriate personal protective equipment (PPE) including chainsaw trousers, helmets with visors, and ear protection. When using a strimmer or clearing saw, ensure that the area is clear of debris and bystanders. Operators must wear eye protection and sturdy footwear. The equipment should be refuelled in a well-ventilated area, away from ignition sources. The wood chipper must be positioned on stable ground, with the discharge chute directed away from people and structures. Only trained personnel should operate the chipper, ensuring that no loose clothing or jewellery is worn. The mobile stump grinder requires careful handling during repositioning. Ensure the area is clear of obstacles and that the grinder is securely fastened during transport. Operators must be vigilant of their surroundings to prevent accidents. For application of weed killer and pesticides, only approved substances should be used, following the manufacturer’s instructions. Applicators must wear appropriate PPE, including gloves and masks, to prevent exposure to chemicals. All hand-held equipment must be used in accordance with the manufacturer’s guidelines. Regular maintenance schedules should be adhered to, ensuring all safety guards are in place and functional. Training and competence are crucial; only personnel who have received adequate training should operate any tools or equipment. Records of training should be maintained and reviewed regularly to ensure compliance with safety standards. All personnel involved in the landscaping, gardening, and arboriculture works must ensure that all underground and overhead services are identified and marked prior to commencing any task. This includes, but is not limited to, water pipes, gas lines, electrical cables, and telecommunication lines. Pre-Work Checks: Isolation Procedures: Working Near Services: Emergency Protocols: Reinstatement: By adhering to these procedures, the risk of service disruption or damage during landscaping, gardening, and arboriculture works can be effectively managed. All personnel involved in the landscaping, gardening, and arboriculture works must adhere to the following procedures when handling hazardous substances: Identification and Assessment: Prior to commencing work, a comprehensive assessment of all hazardous substances, including weed killers, pesticides, and any chemicals used in pre-planting spraying, must be conducted. Material Safety Data Sheets (MSDS) for each substance should be reviewed to understand potential risks and required control measures. Storage: Hazardous substances must be stored in a secure, well-ventilated area away from direct sunlight and sources of ignition. Containers should be clearly labelled and kept sealed when not in use to prevent accidental spillage or contamination. Handling and Application: Spillage Response: In the event of a spillage, immediate action must be taken to contain and clean up the spill using appropriate spill kits. Personnel must follow the emergency procedures outlined in the MSDS, including notifying the site supervisor and ensuring that any contaminated materials are disposed of in accordance with environmental regulations. Disposal: All waste materials, including empty containers and any residual chemicals, must be disposed of in compliance with local environmental legislation. Containers should be triple-rinsed before disposal or recycling. Record Keeping: Accurate records of all hazardous substances used on site must be maintained, including quantities used, dates of application, and personnel involved. This documentation is essential for both regulatory compliance and future reference. By adhering to these procedures, the risk associated with hazardous substances in landscaping, gardening, and arboriculture works can be effectively managed, ensuring the safety of all personnel and the surrounding environment. All deliveries of materials shall be scheduled to minimise disruption and ensure safety on site. Delivery vehicles must be directed to designated unloading areas by a competent banksman. The banksman shall ensure that the vehicle is safely positioned and that no unauthorised personnel are present during unloading. Materials such as soil, plants, and equipment must be handled with care to prevent damage and ensure safety. Mechanical aids, such as forklifts or pallet trucks, should be utilised where possible to reduce manual handling risks. All operatives involved in manual handling must have received appropriate training and adhere to safe lifting techniques. Earth-moving equipment must be operated by trained personnel only. Operators must conduct pre-use checks to ensure equipment is in safe working order. When moving earth, care must be taken to avoid underground services and to maintain stability of the surrounding area. For tree felling or surgery, materials such as branches and logs must be carefully lowered to the ground using ropes or mechanical aids to prevent injury or damage. Operatives must wear appropriate PPE, including helmets and gloves, during these activities. When handling chemicals such as weed killers or pesticides, operatives must follow COSHH assessments and use appropriate PPE. Chemicals should be stored securely and transported in accordance with manufacturer guidelines. All waste materials, including plant debris and packaging, must be segregated and disposed of in accordance with site waste management procedures. Regular inspections will be conducted to ensure compliance with these procedures. All personnel engaged in landscaping, gardening, and arboriculture works must adhere to the following Personal Protective Equipment (PPE) procedures to ensure safety and compliance with health and safety regulations: Head Protection: Eye Protection: Hearing Protection: Hand Protection: Foot Protection: High-Visibility Clothing: Respiratory Protection: Chainsaw Protective Clothing: All PPE must be inspected regularly for damage or wear and replaced as necessary. Compliance with these procedures is mandatory to maintain a safe working environment. In the event of an emergency during landscaping, gardening, and arboriculture works, the following procedures must be adhered to: Immediate Response: Upon identifying an emergency, such as an injury or hazardous situation, all work must cease immediately. Workers must ensure their own safety first before assisting others. Communication: The designated site supervisor must be notified without delay. Use mobile communication devices to alert the supervisor and other team members of the situation. First Aid: Trained first aid personnel should be summoned to the scene promptly. First aid kits are to be located at strategic points on site, including near areas where tree felling and machinery operation occur. Evacuation: If evacuation is necessary, workers must proceed to the predetermined assembly point, ensuring that all personnel are accounted for. The assembly point should be clear of any potential hazards such as falling trees or moving machinery. Emergency Services: In cases of severe injury or life-threatening situations, emergency services must be contacted immediately by dialling 999. Provide clear details of the incident location and nature of the emergency. Containment of Hazards: If safe to do so, isolate any equipment involved in the incident, such as strimmers or stump grinders, to prevent further risk. Ensure that any chemical spills, such as weed killer or pesticides, are contained using spill kits available on site. Reporting: All incidents must be documented in the site incident logbook. The site supervisor is responsible for ensuring that a detailed report is completed and submitted to management for review. Review and Debrief: Following an emergency, a debriefing session should be conducted with all personnel involved to review the incident and discuss any necessary changes to procedures or additional training requirements. Public Safety: Ensure that any members of the public in proximity to the site are kept at a safe distance during an emergency. Use barriers and signage to direct them away from potential hazards. Recommencement of Work: Work may only recommence once the site has been declared safe by the site supervisor and any necessary corrective actions have been implemented. All personnel involved in the landscaping, gardening, and arboriculture works shall adhere to the following procedures to ensure the safety of the public and occupiers: Site Perimeter and Signage: Erect clear and visible barriers around the work area to prevent unauthorised access. Display appropriate warning signs indicating ongoing works, potential hazards, and restricted access zones. Supervision and Monitoring: Assign a competent person to oversee public safety measures throughout the duration of the works. Regularly inspect barriers and signage to ensure they remain effective and intact. Material Storage: Store all materials, including plants, soil, and equipment, in designated areas away from public access. Ensure that these areas are clearly marked and secured to prevent accidental interference. Traffic Management: Implement traffic management plans where necessary, particularly during the delivery of materials and removal of waste. Use banksmen to guide vehicles safely in and out of the site, ensuring minimal disruption to public pathways. Noise and Dust Control: Minimise noise and dust emissions by using appropriate equipment and techniques. Schedule noisy operations, such as tree felling or use of wood chippers, during times that are least disruptive to nearby occupiers. Public Interaction: Instruct all workers to be courteous and informative when approached by members of the public. Provide clear information about the nature and duration of the works if required. Emergency Access: Maintain clear access routes for emergency services at all times. Ensure that all workers are aware of these routes and that they remain unobstructed. Tool and Equipment Management: Secure all tools and equipment when not in use. Ensure that items such as strimmers, stump grinders, and clearing saws are never left unattended in areas accessible to the public. Chemical Application: Conduct any application of weed killers or pesticides with due consideration for wind direction and proximity to public areas. Use signage to inform the public of chemical use and potential risks. By adhering to these procedures, the safety of both the public and occupiers will be prioritised throughout the landscaping, gardening, and arboriculture works. All personnel involved in landscaping, gardening, and arboriculture works must be vigilant for the presence of asbestos-containing materials (ACMs) during the execution of tasks, particularly when working near older structures or in areas where historical construction debris may be present. Pre-Work Assessment: Training and Awareness: Stop Work Procedure: Notification and Testing: Documentation: Waste Management: Communication: Monitoring of the landscaping, gardening, and arboriculture works shall be conducted with diligence to ensure compliance with health and safety standards. Daily inspections will be carried out by the site supervisor to assess the condition and safe operation of all equipment, including strimmers, wood chippers, and stump grinders. Any defects or issues identified must be reported immediately and rectified before further use. Regular checks will be performed on the application of chemicals such as weed killers and pesticides. This includes verifying that all personnel are using the correct personal protective equipment (PPE) and adhering to safe handling procedures. Records of chemical usage and safety data sheets must be maintained and reviewed weekly. Noise levels generated by machinery such as clearing saws and wood chippers will be monitored to ensure they remain within acceptable limits. Noise assessments will be conducted at the start of the project and periodically thereafter, with adjustments made to work practises as necessary to minimise exposure. The site supervisor will conduct random spot checks to ensure that all workers are following the method statement and risk assessments. These checks will focus on safe working practises during tree felling, bush cutting, and earth moving activities. Environmental monitoring will include regular assessments of dust levels, particularly during earth moving operations, to prevent nuisance to nearby properties. Measures such as damping down will be implemented as required. All monitoring activities will be documented, and any non-compliance or incidents will be addressed promptly with corrective actions. The effectiveness of these procedures will be reviewed at regular intervals throughout the project duration. All waste generated from the landscaping, gardening, and arboriculture works shall be managed in accordance with the following procedures: Segregation of Waste: Waste materials shall be segregated at the source into distinct categories: green waste, soil, general construction waste, and hazardous waste. Green waste includes branches, leaves, and grass cuttings, which shall be separated for composting or chipping. Green Waste Management: Green waste shall be processed on-site using a wood chipper where feasible. The resulting wood chips may be used as mulch within the project area or transported to an approved recycling facility. Soil and Earth Waste: Excess soil and earth resulting from earth-moving activities shall be assessed for potential reuse on-site. If reuse is not possible, it shall be transported to a licenced disposal site. Hazardous Waste Handling: Any hazardous waste, such as containers of weed killer or pesticides, shall be stored in designated, clearly marked containers and disposed of in accordance with relevant hazardous waste regulations. Personnel handling these substances must wear appropriate PPE and follow COSHH guidelines. Documentation and Records: All waste transfers shall be documented with appropriate waste transfer notes or consignment notes, ensuring compliance with legal requirements. Records shall be maintained on-site for inspection. Minimisation of Waste: Efforts shall be made to minimise waste generation by accurately estimating material requirements and reusing materials where possible. Regular Inspections: Regular inspections of waste storage areas shall be conducted to ensure compliance with segregation and storage procedures, and to prevent any environmental contamination. Training and Awareness: All personnel involved in the project shall receive training on waste management procedures specific to landscaping, gardening, and arboriculture works to ensure compliance and promote environmental responsibility. By adhering to these procedures, the project aims to manage waste effectively while minimising environmental impact. All personnel involved in the landscaping, gardening, and arboriculture works shall adhere to the following project-specific procedures to ensure environmental protection: Minimisation of Soil Disturbance: During earth moving activities, care must be taken to minimise soil disturbance. This includes avoiding unnecessary compaction and ensuring that topsoil is preserved and reused where possible. Protection of Existing Flora and Fauna: Prior to commencing any tree felling or surgery, a survey shall be conducted to identify any protected species or habitats. Measures must be implemented to protect these, including the installation of protective barriers around trees and plants not designated for removal. Control of Chemical Use: The application of weed killer and pesticides must be conducted with precision to prevent runoff into nearby watercourses. Only approved substances shall be used, and application must follow manufacturer guidelines strictly. Personnel must ensure that chemicals are not applied during adverse weather conditions that could lead to environmental contamination. Waste Management: All green waste generated from bush cutting, tree felling, and other activities shall be collected and processed appropriately. The use of a wood chipper should be optimised to reduce waste volume, and all chippings should be either removed from site or used as mulch in designated areas. Noise and Dust Control: The use of machinery such as stump grinders and strimmers must be managed to minimise noise pollution. Equipment should be maintained in good working order to reduce emissions, and operations should be scheduled to avoid disturbance to local wildlife and residents. Water Management: Measures must be in place to prevent contamination of water bodies from site activities. This includes ensuring that no debris or chemicals enter drainage systems and that any water used in pre-planting spraying is contained and disposed of responsibly. Recycling and Reuse: Where possible, materials such as wood from felled trees should be repurposed or recycled. This not only reduces waste but also supports sustainable practises within the project. By adhering to these procedures, the project will mitigate its environmental impact while promoting sustainable landscaping practises. The landscaping, gardening, and arboriculture works will be conducted with due consideration to the surrounding neighbours to minimise any potential nuisance. Communication with neighbours will be established prior to commencement, informing them of the nature and duration of the works. Noise control measures will be implemented, particularly during tree felling, bush cutting, and the use of machinery such as wood chippers and stump grinders. Operations will be restricted to standard working hours, and equipment will be maintained to ensure it operates efficiently and quietly. Dust suppression techniques will be employed during earth moving and gardening activities. Water sprays or dampening methods will be utilised to prevent dust from becoming airborne, especially in dry conditions. Odour management will be considered during the application of weed killers and pesticides. Only approved substances will be used, and application will be conducted in a manner that minimises drift and odour impact on neighbouring properties. Visual impact will be managed by ensuring that all materials and equipment are stored neatly and that waste is regularly removed from the site. Temporary barriers or screens may be erected to shield unsightly areas from view. Regular site inspections will be conducted to ensure compliance with these procedures, and any complaints from neighbours will be addressed promptly and effectively. All personnel involved in landscaping, gardening, and arboriculture works must adhere to the following occupational health procedures to mitigate risks associated with these activities: Manual Handling: Noise Exposure: Vibration Exposure: Chemical Exposure: Respiratory Protection: Skin Protection: First Aid: Health Surveillance: By adhering to these procedures, the health and well-being of all personnel engaged in landscaping, gardening, and arboriculture works will be safeguarded. All amendments to the method statement for landscaping, gardening, and arboriculture works must be documented and authorised prior to implementation. Any proposed changes to the procedures, whether due to unforeseen site conditions or operational requirements, must be communicated to the project manager immediately. The project manager will review the proposed amendments in consultation with the health and safety advisor to ensure compliance with relevant legislation and best practises. No work shall proceed under the amended procedures until formal approval is granted. Authorisation of amendments will be recorded in writing, with a clear description of the changes and the rationale behind them. The revised method statement will be distributed to all relevant personnel, ensuring that everyone involved in the project is aware of the updated procedures. Toolbox talks will be conducted to brief operatives on any significant changes, particularly those affecting safety protocols during tasks such as tree felling, use of machinery like wood chippers and stump grinders, or application of hazardous substances like pesticides and weed killers. In the event of an emergency requiring immediate procedural changes, verbal authorisation may be given by the project manager, but this must be followed by a written amendment at the earliest opportunity. All personnel must adhere strictly to the revised procedures to maintain safety and compliance throughout the project.
Who might be harmed:
Landscaping and gardening workers | Arborists | Nearby site personnel
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Asphyxia | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping and gardening workers | Arborists
Type of harm:
Asphyxia | Death | Illness
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping and gardening workers | Arborists
Type of harm:
Eye Damage
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping workers | Gardeners | Arborists
Type of harm:
Dermatitis
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping and gardening workers | Arborists | Nearby site personnel
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Asphyxia | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping and gardening workers | Arborists
Type of harm:
Illness | Death
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping workers | Gardeners | Arborists
Type of harm:
Eye Damage
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping workers | Gardeners | Arborists
Type of harm:
Dermatitis
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers operating machinery | Delivery drivers
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Asphyxia | Death | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Workers handling diesel fuel
Type of harm:
Illness | Death
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping and gardening workers | Arborists and tree surgeons | Machinery operators
Type of harm:
Eye Damage
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping and gardening workers | Arborists and tree surgeons | Machinery operators | Maintenance personnel
Type of harm:
Dermatitis
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping and gardening workers | Arborists and tree surgeons | Delivery personnel handling petrol
Type of harm:
Asphyxia | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Workers handling petrol
Type of harm:
Asphyxia | Death | Illness
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping and gardening workers | Arborists and tree surgeons | Maintenance staff for machinery
Type of harm:
Eye Damage
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping and gardening workers | Arborists and tree surgeons | Machinery operators
Type of harm:
Dermatitis
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Workers operating machinery
Type of harm:
Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Workers handling engine oil | Maintenance personnel
Type of harm:
Illness | Death
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping workers | Arborists | Gardeners | Machinery operators
Type of harm:
Eye Damage
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Landscaping and gardening workers | Arborists and tree surgeons | Machinery operators
Type of harm:
Dermatitis
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
Slips, trips, and falls : Low (1)
Noise exposure : Low (1)
Vibration exposure : Low (1)
Flying debris : Low (1)
Chemical exposure : Low (1)
Contact with machinery : Low (1)
Falling objects : Low (1)
Electric shock : Low (1)
Weather conditions : Low (1)
Biological hazards : Low (1)
Traffic and site vehicles : Low (1)
Procedures
Personnel and competence
Site inductions and training
Access and egress arrangements
Welfare
Special permits
Tools and equipment
Services and isolations
Hazardous substances
Deliveries and materials handling
PPE
Hard hats must be worn at all times during tree felling, surgery, and when operating or working near the wood chipper and stump grinder. This is essential to protect against falling branches and debris.
Safety goggles or face shields are mandatory when using strimmers, clearing saws, and during the application of pesticides and weed killers. This will prevent eye injuries from flying particles and chemical splashes.
Ear defenders or earplugs must be used when operating noisy equipment such as wood chippers, stump grinders, and strimmers to prevent hearing damage.
Appropriate gloves must be worn when handling plants, applying chemicals, and operating machinery. Gloves should be resistant to cuts and chemicals, providing protection against thorns, sharp tools, and hazardous substances.
Steel-toed boots with non-slip soles are required to protect against foot injuries from heavy materials, equipment, and uneven terrain. This is particularly important during earth moving and material delivery tasks.
High-visibility vests or jackets must be worn at all times to ensure workers are easily seen by colleagues and machinery operators, especially during material deliveries and when working near moving vehicles.
When applying pesticides or weed killers, suitable respiratory protection must be used to prevent inhalation of harmful vapours. This is crucial during pre-planting spraying of container-grown seedlings and other chemical applications.
For tasks involving tree felling or surgery, chainsaw protective trousers and jackets must be worn to reduce the risk of injury from chainsaw operations.Emergency procedures
Safety of public and occupiers
Asbestos
Prior to commencing any work, a thorough site assessment must be conducted to identify potential ACMs. This includes inspecting areas where earth moving or tree felling may disturb the ground, as well as any structures or debris that may contain asbestos.
All operatives must receive asbestos awareness training to recognise potential ACMs. This training should be refreshed regularly to ensure up-to-date knowledge.
If suspected ACMs are encountered during any phase of the work, all activities in the immediate vicinity must cease immediately. The area should be cordoned off to prevent access, and a competent person must be notified to assess the situation.
Upon discovery of suspected ACMs, a licenced asbestos contractor must be engaged to conduct testing and confirm the presence of asbestos. No work shall resume in the affected area until it is declared safe by the competent authority.
All findings related to asbestos must be documented, including the location, type, and condition of any ACMs identified. This documentation should be maintained on-site and made available to all relevant personnel.
In the event that ACMs are confirmed and require removal, all waste must be handled and disposed of in accordance with current regulations. Only licenced contractors are permitted to remove and dispose of asbestos waste.
Clear communication channels must be established to ensure that all team members are informed of any asbestos-related issues and the procedures in place to manage them. Regular briefings should be conducted to reinforce awareness and compliance.Monitoring
Waste management
Environmental considerations
Near neighbours and nuisance
Occupational health
Amendments and authorisation
Activities
Preparation and Setup
Delivery and Storage of Materials
Earth Moving and Ground Preparation
Gardening and Planting Operations
Tree Felling and Surgery
Bush Cutting and Strimming
Application of Weed Killer
Operation of Wood Chipper
Use and Re-positioning of Mobile Stump Grinder
Pre-planting Spraying of Container Grown Seedlings
Application of Pesticides with Hand-held Equipment
Use of Clearing Saw/Strimmer
Site Cleaning and Finishing Operations
Hazardous Substances
Herbicides
Herbicides are utilised to control and eliminate unwanted vegetation and weeds in landscaping and gardening areas.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Pesticides
Pesticides are intended for the control and elimination of pests that may harm plants and trees during landscaping and gardening activities.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Diesel fuel
Diesel fuel is intended for use in powering machinery and equipment such as mobile stump grinders and wood chippers during landscaping, gardening, and arboriculture works.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Petrol
Petrol is intended for use as a fuel to power machinery and equipment such as strimmers, chainsaws, and stump grinders during landscaping, gardening, and arboriculture works.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Engine oil
Engine oil is utilised to lubricate and protect the moving parts of machinery, ensuring efficient operation and reducing wear and tear.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Induction Record
Company name:
Project title:
Location:
Contract No:
Subject:
Method Statement : Landscaping, Gardening and Arboriculture Works
Tutor:
Date:
Signature:
Name Comments Signature Date