Click here to Print or go to File > Print or CTRL/CMD-P
Try it out.

Risk Assessment Template : Installing floor joists
This document should not be used until it has been thoroughly reviewed by a competent person.
| Company name: | |
| Project title: | |
| Location: | |
| Contract No: |
| Author: | |
| Reviewed by: | |
| Date: | |
| Signature: |
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
Explanation
Installing floor joists involves the process of positioning and securing structural beams, typically made of timber or metal, to support the flooring of a building. This task is essential in providing stability and strength to the structure, ensuring that the floor can safely bear the weight of occupants and furniture. Carried out by trained and competent workers, the installation of floor joists requires careful measurement, cutting, and placement of the beams according to building plans. Joist hangers are often used to securely attach the joists to supporting structures. Working from a safe working platform, workers can effectively carry out this task to create a solid foundation for the building’s flooring system.
| Falls from height | ||
|
Initial Risk
Severity Probability Rating |
Who might be harmed?
Nearby Public Type of harm
Back / Spinal Injury Controls
|
Residual Risk
Severity Probability Rating |
| Manual handling injuries | ||
|
Initial Risk
Severity Probability Rating |
Who might be harmed?
Managers of Workers Type of harm
Back / Spinal Injury Controls
|
Residual Risk
Severity Probability Rating |
| Struck by falling objects | ||
|
Initial Risk
Severity Probability Rating |
Who might be harmed?
Managers of Workers Type of harm
Back / Spinal Injury Controls
|
Residual Risk
Severity Probability Rating |
| Cuts and lacerations | ||
|
Initial Risk
Severity Probability Rating |
Who might be harmed?
Managers of Workers Type of harm Cuts and Abrasions Controls
|
Residual Risk
Severity Probability Rating |
| Trips and slips | ||
|
Initial Risk
Severity Probability Rating |
Who might be harmed?
Managers of Workers Type of harm
Respiratory damage / Asthma / COPD Controls
|
Residual Risk
Severity Probability Rating |
Induction Record
| Company name: | Project title: | ||
| Location: | Contract No: |
| Subject: | Risk Assessment : Installing floor joists | Tutor: | |
| Date: | Signature: |
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
| Name | Comments | Signature | Date |
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|

