RAMS for Floor Laying and Screeding
Risk Assessment and Method Statement Template for Floor Laying and Screeding
This document should not be used until it has been thoroughly reviewed by a competent person.
| Company name: | |
| Project title: | |
| Location: | |
| Contract No: | |
| Author: | |
| Reviewed by: | |
| Date: | |
| Signature: |
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
RAMS : Floor Laying and Screeding
Site Specific Instructions
Work Process and Associated Hazards
Delivery and Storage of Materials
Removal of Existing Vinyl Flooring
Removal of Existing Carpet
Application of Sealer/Damp Proof Membrane
Application of Primer
Floor Preparation and Screeding
Installation of Cove Former and Capping Strip
Installation of Vinyl Flooring and Tiles
Installation of Carpet and Carpet Tiles
Installation of Stair Carpet
Install Engineered Wood Strip Flooring
Install Laminate Wood Strip Flooring
Fit Aluminium Stair Nosings
Floor Sanding
Manual handling : Low (1) Who might be harmed: Construction workers | Delivery personnel | Subcontractors Type of harm: Back / Spinal Injury | Muscular Injury Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Slips, trips, and falls : Low (1) Who might be harmed: Construction workers | Site supervisors | Delivery personnel | Subcontractors Type of harm: Back / Spinal Injury | Broken Bones | Cuts and Abrasions | Death | Head Injury | Multiple / Various Injury | Muscular Injury Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Dust inhalation : Low (1) Who might be harmed: Construction workers | Site supervisors | Nearby tradespeople Type of harm: Asbestosis / Lung Cancer / Mesothelioma | Respiratory damage / Asthma / COPD Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Noise exposure : Low (1) Who might be harmed: Construction workers | Site supervisors | Nearby tradespeople Type of harm: Permanent Hearing Damage Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Chemical exposure : Low (1) Who might be harmed: Construction workers | Site supervisors | Cleaning staff Type of harm: Burns | Dermatitis | Eye Damage | Illness | Respiratory damage / Asthma / COPD Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Cuts and abrasions : Low (1) Who might be harmed: Construction workers | Site supervisors Type of harm: Cuts and Abrasions Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Working at height : Low (1) Who might be harmed: Construction workers | Site supervisors | Subcontractors Type of harm: Broken Bones | Death | Head Injury | Multiple / Various Injury Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Electrical hazards : Low (1) Who might be harmed: Construction workers | Electricians | Site supervisors | Subcontractors Type of harm: Burns | Death | Electrocution Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Fire risk : Low (1) Who might be harmed: Construction workers | Site visitors | Subcontractors Type of harm: Burns | Death | Smoke Inhalation Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Use of power tools : Low (1) Who might be harmed: Construction workers | Site supervisors | Nearby tradespeople Type of harm: Amputation | Cuts and Abrasions | Electrocution | Eye Damage | HAVS / Vibration White Finger | Permanent Hearing Damage Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
All personnel involved in the floor laying and screeding works must possess the necessary qualifications and experience pertinent to their specific tasks. Each operative shall hold a valid Construction Skills Certification Scheme (CSCS) card, demonstrating their competence in construction activities. Prior to commencing work, all operatives must undergo a site-specific induction to familiarise themselves with the unique aspects of the project, including any potential hazards associated with floor laying and screeding. This induction will cover the correct use of tools and equipment, as well as the handling and application of materials such as sealers, primers, and screeds. Operatives responsible for the removal of existing flooring materials, such as vinyl and carpet, must be trained in safe removal techniques to prevent damage to the subfloor and minimise dust generation. Those applying sealers and damp proof membranes must be proficient in ensuring even application to avoid future flooring failures. Personnel tasked with the installation of vinyl flooring, carpet, engineered wood, and laminate must demonstrate proficiency in cutting, fitting, and securing these materials to achieve a high-quality finish. Additionally, those involved in the installation of cove formers, capping strips, and stair nosings must be skilled in precision fitting to ensure safety and durability. Floor sanding operatives must be experienced in using sanding machinery safely and effectively to achieve a smooth finish without compromising the integrity of the flooring material. Regular toolbox talks will be conducted to reinforce safe working practises and address any specific challenges encountered during the project. These sessions will also serve as an opportunity for personnel to raise any concerns or suggestions for improving safety and efficiency. Supervisors will conduct ongoing competency assessments to ensure that all personnel maintain the required standards throughout the duration of the project. Any identified training needs will be addressed promptly to uphold the highest levels of safety and workmanship. All personnel involved in the floor laying and screeding works shall undergo a comprehensive site induction prior to commencing any tasks. This induction will cover the specific risks and safety measures associated with the activities of floor laying and screeding. The induction will include: Identification of Hazards: Detailed explanation of potential hazards such as dust generation during floor sanding, manual handling risks associated with heavy materials, and slip or trip hazards during the removal of existing flooring. Safe Work Practises: Instruction on the correct use of tools and equipment specific to floor laying and screeding, including the safe operation of screeding machines and floor sanders. Material Handling: Procedures for the safe delivery, storage, and handling of materials such as vinyl flooring, carpet tiles, and engineered wood strips to prevent damage and ensure safety. Use of PPE: Emphasis on the mandatory use of appropriate personal protective equipment, including dust masks during sanding, gloves for handling adhesives, and knee pads for tasks requiring prolonged kneeling. Emergency Procedures: Specific actions to be taken in the event of an emergency related to floor laying activities, such as spills of hazardous substances like sealers or primers. Training sessions will be conducted to ensure all operatives are competent in the application of sealers, primers, and screeds. This includes: Demonstrations: Practical demonstrations on the correct techniques for applying damp proof membranes and primers to ensure effective floor preparation. Tool Proficiency: Training on the use of specialised tools such as cove formers and stair nosing fitting tools to ensure precision and safety. Attendance at the site induction and training sessions will be recorded, and only those who have completed these requirements will be permitted to work on the project. Regular refresher sessions will be scheduled to maintain high standards of safety awareness throughout the duration of the project. All personnel involved in the floor laying and screeding works shall utilise designated access routes to the work area. These routes must be clearly marked and free from obstructions to ensure safe passage. Access Points:
Egress Routes:
Material Handling:
Floor Preparation Areas:
Stair Access:
Communication:
The welfare facilities for the floor laying and screeding works shall be established in accordance with the Construction (Design and Management) Regulations 2015. Adequate welfare provisions must be available on-site to ensure the health and well-being of all operatives involved in the project. Sanitary conveniences must be provided, including clean and accessible toilets with handwashing facilities. These facilities should be located in close proximity to the work area to minimise disruption and ensure ease of access during the removal of existing flooring and application of materials. Rest areas must be designated for operatives to take breaks, particularly during intensive tasks such as floor preparation and screeding. These areas should be equipped with seating and protection from adverse weather conditions, ensuring a comfortable environment for rest. Drinking water must be readily available on-site. It is essential that all personnel have access to potable water, especially during tasks that involve physical exertion, such as the installation of vinyl flooring and carpet tiles. Changing facilities should be provided for operatives who may need to change into appropriate work attire, particularly when handling materials that require specific personal protective equipment (PPE). First aid provisions must be in place, with a suitably stocked first aid kit available at all times. A trained first aider should be present on-site to address any incidents that may occur during the handling of materials or operation of equipment. Regular welfare inspections should be conducted to ensure that all facilities remain clean, functional, and compliant with health and safety standards throughout the duration of the floor laying and screeding works. All personnel involved in the floor laying and screeding works must ensure compliance with the special permit requirements prior to commencing any task. Permits to Work are mandatory for specific activities that may pose significant risks, such as: Hot Works: Any activity involving the use of heat-producing equipment, such as floor sanding machines or tools that may generate sparks, requires a Hot Works Permit. This permit must be obtained from the site manager and displayed prominently at the work area. The permit will outline necessary precautions, including fire watch arrangements and the availability of fire extinguishers. Confined Spaces: If any part of the floor preparation or screeding takes place in confined spaces, a Confined Space Permit is required. This permit ensures that appropriate atmospheric testing, ventilation, and rescue procedures are in place. Electrical Isolation: For tasks involving the installation of electrical components, such as underfloor heating systems, an Electrical Isolation Permit is necessary. This ensures that all electrical circuits are safely isolated before work begins. Permit Application Process: Permit Validity and Monitoring: Failure to obtain and adhere to special permits may result in disciplinary action and cessation of work until compliance is achieved. All tools and equipment utilised in the floor laying and screeding works must be inspected prior to use to ensure they are in good working condition. This includes, but is not limited to, trowels, screeding tools, floor sanders, and cutting equipment. Power tools such as sanders and saws must be PAT tested and fitted with appropriate dust extraction systems to minimise dust exposure. Operators must be trained in their use and wear suitable PPE, including dust masks and eye protection. Manual handling equipment, such as trolleys or dollies, should be used for transporting heavy materials like screed bags or rolls of flooring to prevent manual handling injuries. Ensure that all equipment is stored securely when not in use to prevent trip hazards. When using adhesive application tools, ensure that they are cleaned regularly to prevent blockages and maintain efficiency. All tools must be used in accordance with the manufacturer’s instructions to ensure safety and effectiveness. Cutting tools for vinyl and carpet must be sharp and handled with care to prevent accidents. Blades should be replaced regularly to maintain precision and reduce the risk of injury. Finally, ensure that all electrical equipment is connected to a suitable power source with RCD protection to prevent electrical hazards. Regular checks should be conducted throughout the project to ensure compliance with safety standards. All electrical services in the work area must be isolated and locked off prior to the commencement of floor laying and screeding activities. This is to prevent accidental activation of equipment that could pose a risk during the removal of existing flooring and the application of new materials. Water supply lines should be checked and isolated if necessary, particularly when applying a damp proof membrane or primer, to ensure no moisture ingress affects the curing process of screed or adhesives. Prior to the removal of existing flooring, it is essential to identify and mark any underfloor heating systems. These systems must be deactivated and isolated to prevent damage during the removal and installation processes. All gas services in proximity to the work area should be identified and isolated if there is any risk of disturbance during the floor preparation phase. This is crucial to avoid any potential leaks or hazards. Ensure that all communication cables are clearly marked and protected to prevent accidental damage during the installation of flooring materials, particularly when using tools that may penetrate the subfloor. Upon completion of each phase, services should be reinstated only after a thorough inspection confirms that all installations are secure and no damage has occurred. This must be documented and signed off by a competent person. All personnel involved in the floor laying and screeding works must be fully briefed on the safe handling and use of hazardous substances, including sealers, primers, adhesives, and screed compounds. Material Safety Data Sheets (MSDS) for each substance must be reviewed prior to commencement of work to ensure understanding of potential hazards and necessary precautions. Storage: All hazardous substances must be stored in a designated, well-ventilated area, away from direct sunlight and sources of ignition. Containers should be clearly labelled and kept sealed when not in use to prevent accidental spillage or contamination. Handling: Personnel must wear appropriate Personal Protective Equipment (PPE) such as gloves, goggles, and masks when handling hazardous substances. Ensure that all containers are handled with care to avoid spills or leaks. In the event of a spill, follow the spill response procedure outlined in the MSDS. Application: During the application of sealers, primers, and adhesives, ensure adequate ventilation in the work area to prevent the accumulation of fumes. Use mechanical ventilation if necessary. Personnel must avoid inhalation of vapours and ensure that skin contact is minimised. Disposal: Waste materials and empty containers must be disposed of in accordance with local regulations and guidelines. Do not pour any leftover substances down drains or into watercourses. Use designated waste disposal facilities for hazardous materials. Emergency Procedures: In case of accidental exposure or ingestion, follow the first aid measures specified in the MSDS. Ensure that emergency contact numbers are readily available on site and that all personnel are aware of their location. Regular inspections should be conducted to ensure compliance with these procedures and to identify any potential risks associated with the use of hazardous substances during floor laying and screeding activities. All deliveries of materials for floor laying and screeding shall be scheduled to minimise disruption and ensure efficient workflow. Delivery vehicles must be directed to designated unloading areas, ensuring clear access routes are maintained at all times. Upon arrival, materials such as screed, vinyl flooring, carpet, and wood strips must be inspected for damage and verified against delivery notes. Any discrepancies or damages should be reported immediately to the site manager. Manual handling of materials should be minimised. Use mechanical aids such as trolleys or pallet trucks wherever possible. Personnel involved in handling must have received appropriate manual handling training. Materials must be stored in a secure and dry location to prevent deterioration. Screed and other moisture-sensitive materials should be kept off the ground on pallets and covered with waterproof sheeting if necessary. Ensure that hazardous substances, such as primers and sealers, are stored in accordance with COSHH regulations, with appropriate signage and ventilation. Waste materials from packaging should be disposed of promptly in designated waste containers to maintain a tidy work environment and prevent trip hazards. All personnel involved in the floor laying and screeding works must adhere to the following Personal Protective Equipment (PPE) requirements to ensure safety and compliance with health and safety regulations: Safety Footwear: All operatives must wear steel-toe capped boots with slip-resistant soles to prevent injuries from heavy materials and ensure stability on potentially slippery surfaces. Gloves: Appropriate gloves must be worn when handling materials such as screed, adhesives, and sealers to protect against skin irritation and chemical exposure. Eye Protection: Safety goggles or glasses are mandatory during the application of sealers, primers, and adhesives to protect against splashes and airborne particles. Respiratory Protection: When sanding floors or working with materials that may emit dust or fumes, operatives must wear suitable dust masks or respirators to prevent inhalation of harmful substances. Knee Pads: Given the nature of floor laying tasks, knee pads should be worn to provide cushioning and support during prolonged periods of kneeling. High-Visibility Clothing: To ensure visibility in areas where machinery is in operation or where there is vehicular movement, high-visibility vests or jackets must be worn at all times. All PPE must be inspected prior to use to ensure it is in good condition and fit for purpose. Any damaged or defective equipment should be reported immediately and replaced. Compliance with these PPE requirements will be monitored throughout the project to maintain a safe working environment. In the event of an emergency during floor laying and screeding works, the following procedures must be adhered to: Immediate Response: Cease all operations immediately. Ensure all personnel are accounted for and move to a safe location away from the affected area. Emergency Contact: Notify the site manager or designated emergency coordinator without delay. Provide details of the incident, including any injuries sustained and the specific location within the site. First Aid: Administer first aid to any injured personnel, if safe to do so, until professional medical assistance arrives. Ensure that first aid kits are readily accessible and stocked with appropriate supplies for potential injuries related to floor laying and screeding, such as cuts or chemical exposure. Evacuation Routes: Follow pre-determined evacuation routes, ensuring that all exits are clear of obstructions from materials or equipment used in the floor laying and screeding process. Fire Safety: In case of fire, activate the nearest fire alarm and use fire extinguishers only if trained and it is safe to do so. Be aware of potential fire hazards associated with adhesives and sealants used in the process. Chemical Spills: For spills involving sealers, primers, or other hazardous substances, follow spill response procedures. Use appropriate spill kits and personal protective equipment (PPE) to contain and clean up the spill safely. Communication: Maintain clear communication with all team members throughout the emergency. Use radios or mobile phones to relay information as necessary. Re-entry: Do not re-enter the work area until it has been declared safe by the site manager or emergency services. Incident Reporting: Once the situation is under control, complete an incident report detailing the nature of the emergency, actions taken, and any lessons learned to prevent future occurrences. Adherence to these procedures is crucial to ensure the safety of all personnel involved in floor laying and screeding activities. The safety of the public and occupiers during floor laying and screeding works is of paramount importance. The following procedures shall be strictly adhered to: Segregation of Work Areas: All work areas must be clearly demarcated using barriers and signage to prevent unauthorised access. This is particularly crucial in occupied buildings where public and occupiers may be present. Communication: Prior to commencement, clear communication with building occupants is essential. Notices detailing the schedule and nature of works should be displayed prominently, ensuring all parties are informed of potential disruptions. Dust Control: Measures must be implemented to minimise dust generation, such as using dust extraction systems and dampening surfaces during sanding operations. This will protect both workers and building occupants from inhalation hazards. Noise Management: Activities likely to generate significant noise, such as floor sanding, should be scheduled during times that minimise disturbance to occupants. Where possible, noise-reducing equipment should be utilised. Safe Access Routes: Ensure that safe access routes are maintained for the public and occupiers at all times. Temporary walkways or alternative routes should be provided if necessary, with clear signage indicating any changes. Material Storage: All materials must be stored securely and tidily to prevent trip hazards or unauthorised access by the public. Particular attention should be given to the storage of adhesives and other hazardous substances. Emergency Egress: Emergency exits must remain unobstructed throughout the duration of the works. Regular checks should be conducted to ensure compliance, and any temporary obstructions must be promptly addressed. Monitoring and Supervision: Continuous monitoring by a competent supervisor is required to ensure adherence to safety procedures and to address any issues that may arise promptly. By implementing these procedures, the safety of the public and occupiers can be effectively managed during floor laying and screeding activities. All personnel involved in the floor laying and screeding works must be asbestos aware and have received appropriate training. Prior to the commencement of any work, a refurbishment and demolition asbestos survey must be reviewed to identify any asbestos-containing materials (ACMs) within the work area. In the event that ACMs are identified in areas where existing flooring is to be removed, a licenced asbestos removal contractor must be engaged to safely remove and dispose of the materials in accordance with the Control of Asbestos Regulations 2012. No work shall proceed until a clearance certificate has been issued by a competent person. During the removal of existing vinyl flooring, carpet, or other materials, operatives must remain vigilant for any suspect materials that may not have been identified in the survey. If any suspect materials are encountered, work must cease immediately, and the site supervisor must be informed. The area should be isolated, and further investigation conducted by a qualified asbestos consultant. All waste generated from the removal of flooring materials must be handled with care to prevent disturbance of any potential ACMs. Waste should be double-bagged and labelled appropriately if asbestos is suspected. Regular toolbox talks will be conducted to reinforce awareness and ensure compliance with asbestos management procedures throughout the duration of the project. The monitoring of floor laying and screeding works shall be conducted with a focus on ensuring compliance with health and safety standards, as well as maintaining the quality of workmanship. Daily inspections will be carried out by the site supervisor to verify that all safety measures are adhered to, particularly in relation to the handling and application of materials such as sealers, primers, and screeds. Regular checks will be implemented to ensure that Personal Protective Equipment (PPE) is worn correctly by all operatives, especially during tasks involving the removal of existing flooring and the application of potentially hazardous substances. The condition and functionality of tools and equipment used in the process will be assessed routinely to prevent any operational failures or safety hazards. Environmental conditions such as temperature and humidity will be monitored closely, as these factors can significantly impact the curing times and effectiveness of screeds and adhesives. Any deviations from the optimal conditions will be addressed promptly to avoid compromising the quality of the flooring installation. Noise levels will be measured during activities such as floor sanding and the use of power tools, ensuring they remain within acceptable limits to protect workers’ hearing and minimise disturbance to nearby occupants. The site supervisor will maintain a logbook documenting all monitoring activities, including any issues identified and corrective actions taken. This logbook will be reviewed weekly by the project manager to ensure ongoing compliance and to identify any trends that may require further attention. All waste generated from the floor laying and screeding activities shall be managed in accordance with the following procedures: Segregation of Waste: Waste materials shall be segregated at the source into distinct categories, including but not limited to: old vinyl flooring, carpet, screed offcuts, and packaging materials. This ensures efficient recycling and disposal. Collection and Storage: Designated waste collection points shall be established on-site. Waste containers must be clearly labelled for each type of waste. All waste must be stored securely to prevent contamination or spillage. Disposal of Hazardous Materials: Any hazardous waste, such as adhesives or sealants, must be disposed of in accordance with relevant regulations. These materials should be stored in appropriate containers and collected by a licenced waste carrier. Recycling Initiatives: Efforts should be made to recycle materials wherever possible. For instance, old carpet tiles and vinyl flooring should be sent to recycling facilities that accept such materials. Minimisation of Waste: The project team shall aim to minimise waste by accurately measuring materials required for the task, thus reducing excess material usage. Documentation: All waste transfers must be documented with waste transfer notes or consignment notes, as applicable. These records should be maintained on-site for inspection. Regular Inspections: Regular inspections of waste management practises shall be conducted to ensure compliance with the outlined procedures and to identify areas for improvement. Training and Awareness: All personnel involved in floor laying and screeding works shall receive training on the specific waste management procedures to ensure understanding and compliance. By adhering to these procedures, the project will effectively manage waste, reduce environmental impact, and comply with legal obligations. All personnel involved in the floor laying and screeding works shall adhere to the following environmental procedures to minimise impact: Waste Management: All waste materials, including old vinyl flooring, carpet, and packaging from new materials, must be segregated and disposed of in accordance with site waste management protocols. Recycling opportunities should be maximised where possible. Dust Control: During floor sanding and preparation, dust extraction equipment must be utilised to minimise airborne particles. Additionally, dust sheets should be employed to protect adjacent areas. Noise Management: Activities such as floor sanding and the use of power tools should be scheduled during designated working hours to reduce noise disturbance. Equipment must be maintained to ensure it operates efficiently and quietly. Chemical Handling: Sealers, primers, and adhesives must be stored in designated areas to prevent spills. Any spills must be contained and cleaned immediately using appropriate spill kits to prevent contamination of the environment. Energy Efficiency: Ensure that all electrical equipment is switched off when not in use to conserve energy. Use energy-efficient tools where possible. Water Usage: Minimise water usage during cleaning processes by employing efficient cleaning techniques and equipment. Protection of Existing Features: Ensure that existing structures and features are protected from damage during the works. This includes using protective coverings where necessary. By adhering to these procedures, the project aims to mitigate environmental impact while maintaining compliance with relevant legislation. The project team shall implement specific procedures to minimise disruption to near neighbours during floor laying and screeding activities. Noise control is paramount; therefore, all machinery and tools used for screeding and floor preparation shall be fitted with noise-reducing devices where possible. Work involving high noise levels, such as floor sanding, shall be scheduled during agreed hours to avoid disturbance. Dust management is critical. Dust extraction systems shall be employed during sanding and cutting operations. Additionally, all work areas shall be enclosed with dust barriers to prevent the spread of dust to adjacent properties. Communication with neighbours is essential. Prior to commencement, a notice shall be distributed to inform them of the nature and duration of the works. A designated contact person shall be available to address any concerns promptly. Traffic management plans shall be in place to ensure that delivery vehicles do not obstruct access routes or cause congestion. Deliveries shall be scheduled outside peak hours to minimise impact. Finally, vibration monitoring shall be conducted during activities such as floor preparation to ensure compliance with acceptable levels, thereby preventing potential structural impact on neighbouring properties. All personnel involved in floor laying and screeding works must adhere to the following occupational health procedures to mitigate potential health risks: Manual Handling: Employees must utilise proper lifting techniques when handling heavy materials such as screed bags, vinyl rolls, and wood flooring. Mechanical aids should be employed where feasible to reduce the risk of musculoskeletal injuries. Dust Control: During floor preparation and sanding, dust extraction systems must be employed to minimise airborne dust. Workers are required to wear appropriate respiratory protective equipment (RPE) to prevent inhalation of dust particles. Chemical Exposure: When applying sealers, damp proof membranes, and primers, ensure adequate ventilation is maintained. Personnel must wear suitable gloves and eye protection to prevent skin contact and eye irritation from chemical substances. Noise Management: Use of power tools during floor preparation and installation may generate excessive noise. Hearing protection must be worn by all operatives in proximity to such activities to prevent hearing damage. Repetitive Strain Prevention: Tasks involving repetitive movements, such as laying tiles or carpet, should be rotated among workers to prevent strain injuries. Regular breaks should be scheduled to allow for rest and recovery. Temperature Extremes: Ensure that work areas are adequately heated or cooled to maintain a comfortable working environment, particularly when working with temperature-sensitive materials like adhesives and screeds. Hygiene Practises: Workers must wash hands thoroughly after handling materials and before eating or drinking to prevent ingestion of harmful substances. Hand sanitising stations should be readily available on site. These procedures are essential to safeguard the health of all personnel engaged in floor laying and screeding activities. Compliance will be monitored regularly to ensure adherence. All amendments to the method statement for floor laying and screeding works must be authorised by the Site Manager prior to implementation. This ensures that any changes are thoroughly reviewed for compliance with health and safety regulations and project specifications. Proposed amendments should be documented in writing, detailing the nature of the change, the reason for the amendment, and any potential impact on safety or project timelines. This documentation must be submitted to the Site Manager for review. Upon receipt, the Site Manager will: In cases where amendments involve significant changes to procedures, such as alterations in the application of sealer/damp proof membrane or adjustments in floor preparation techniques, a revised risk assessment may be required. This ensures that all new risks are adequately controlled. All authorised amendments must be recorded in the project documentation, with copies distributed to all relevant team members. This ensures that everyone involved in the floor laying and screeding works is operating with the most current and accurate information. Regular site meetings will be held to discuss any potential amendments and their implications, fostering a collaborative approach to maintaining safety and efficiency throughout the project. Adhesives are utilised to securely bond various flooring materials, such as vinyl, carpet, and wood, to the subfloor, ensuring stability and durability. Inhalation : Low (1) Who might be harmed: Construction workers | Site supervisors | Nearby tradespeople Type of harm: Asphyxia | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Eye Contact : Low (1) Who might be harmed: Floor laying and screeding operatives Type of harm: Eye Damage Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Skin Contact : Low (1) Who might be harmed: Floor layers | Screeding operatives | Maintenance personnel Type of harm: Dermatitis Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Sealants are intended to provide a protective barrier against moisture and dampness, ensuring the longevity and integrity of the flooring installation. Inhalation : Low (1) Who might be harmed: Construction workers applying sealants | Nearby site personnel Type of harm: Asbestosis / Lung Cancer / Mesothelioma | Asphyxia | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Eye Contact : Low (1) Who might be harmed: Construction workers handling sealants Type of harm: Eye Damage Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Skin Contact : Low (1) Who might be harmed: Floor layers and screeders | Site labourers Type of harm: Dermatitis Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Primers are applied to the substrate to enhance adhesion and ensure a uniform surface for subsequent layers of screed or flooring materials. Inhalation : Low (1) Who might be harmed: Construction workers applying primers | Nearby site personnel Type of harm: Asbestosis / Lung Cancer / Mesothelioma | Asphyxia | Death | Illness | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Eye Contact : Low (1) Who might be harmed: Floor laying operatives | Site supervisors Type of harm: Eye Damage Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Skin Contact : Low (1) Who might be harmed: Construction workers | Floor layers | Maintenance personnel Type of harm: Dermatitis Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Damp proof membranes are utilised to prevent moisture ingress from the subfloor, ensuring a dry and stable surface for subsequent flooring applications. Inhalation : Low (1) Who might be harmed: Construction workers applying the damp proof membrane | Site supervisors overseeing the floor laying process Type of harm: Asbestosis / Lung Cancer / Mesothelioma | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Eye Contact : Low (1) Who might be harmed: Construction workers applying the damp proof membrane Type of harm: Eye Damage Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Skin Contact : Low (1) Who might be harmed: Construction workers handling the materials Type of harm: Dermatitis Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Screed compounds are utilised to create a smooth, level surface on floors, providing a suitable base for the installation of various floor coverings. Inhalation : Low (1) Who might be harmed: Construction workers | Site supervisors | Nearby tradespeople Type of harm: Asbestosis / Lung Cancer / Mesothelioma | Respiratory damage / Asthma / COPD Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Eye Contact : Low (1) Who might be harmed: Construction workers Type of harm: Eye Damage Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Skin Contact : Low (1) Who might be harmed: Construction workers handling screed compounds Type of harm: Dermatitis Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
Site Specific Hazards
Procedures
Personnel and competence
Site inductions and training
Access and egress arrangements
Welfare
Special permits
Tools and equipment
Services and isolations
Hazardous substances
Deliveries and materials handling
PPE
Emergency procedures
Safety of public and occupiers
Asbestos
Monitoring
Waste management
Environmental considerations
Near neighbours and nuisance
Occupational health
Amendments and authorisation
Activities
Delivery and storage of materials
Removal of existing vinyl flooring
Removal of existing carpet
Application of sealer/damp proof membrane
Application of primer
Floor preparation and screeding
Installation of cove former
Installation of capping strip
Installation of vinyl flooring
Installation of vinyl flooring tiles
Installation of carpet and carpet tiles
Installation of stair carpet
Installation of engineered wood strip flooring
Installation of laminate wood strip flooring
Fitting aluminium stair nosings
Floor sanding
Hazardous Substances
Adhesives
Sealants
Primers
Damp proof membranes
Screed compounds
Induction Record
Company name:
Project title:
Location:
Contract No:
Subject:
Method Statement : Floor Laying and Screeding
Tutor:
Date:
Signature:
Name
Comments
Signature
Date