Method Statement : Cleaning of Windows
Explanation
The task of cleaning windows involves the removal of dirt, grime, and other residues from glass surfaces to ensure clarity and maintain aesthetic standards. This process typically employs a van-mounted water feed system, utilising long-reach poles equipped with brushes to access high or difficult-to-reach windows safely from the ground. The primary aim is to achieve a streak-free, clean finish while ensuring the safety of personnel and minimising disruption to the surrounding environment.
Responsibilities
- Window Cleaner : Ensure all equipment is in good working order and used correctly to prevent accidents.
- Site Supervisor : Conduct risk assessments and ensure compliance with health and safety regulations.
- Health and Safety Officer : Provide training and guidance on safe operating procedures and emergency protocols.
- Maintenance Technician : Regularly inspect and maintain the van-mounted water feed system and associated equipment.
- First Aider : Be available on-site to provide immediate assistance in case of injury or accident.
Equipment
- Van-mounted water feed system
- Long reach poles
- Water-fed brush
- Safety harness and lanyard (if required for height)
- Ladder (if necessary)
- Non-slip footwear
- Protective gloves
- Safety goggles
- High-visibility clothing
- Hard hat (if required for overhead hazards)
Operation
- Conduct a risk assessment to identify potential hazards specific to the site.
- Ensure all personnel are trained and competent in using the van-mounted water feed system and long-reach poles.
- Inspect all equipment, including the van-mounted system, poles, and brushes, for any damage or defects.
- Verify that all cleaning products are suitable for use and have the necessary safety data sheets available.
- Check weather conditions to ensure it is safe to work, avoiding high winds or rain.
- Ensure appropriate personal protective equipment (PPE) is available and worn, such as gloves, safety glasses, and non-slip footwear.
- Establish a safe working area by setting up barriers or signs to prevent unauthorised access.
- Ensure that the van is parked securely, with the handbrake engaged and hazard lights activated if necessary.
- Assemble the long reach poles and attach the brush head securely, ensuring all connections are tight and in good working order.
- Connect the water feed system to the poles, checking for any leaks or damage in the hoses or fittings.
- Adjust the length of the poles to suit the height of the windows being cleaned, ensuring a comfortable and stable working position.
- Begin cleaning from the top of the window, using smooth, controlled movements to apply water and gently scrub the surface with the brush.
- Work systematically across each window pane, ensuring even coverage and thorough cleaning, while maintaining a firm grip on the pole.
- Regularly check for any signs of wear or damage to equipment during use, and cease operations immediately if any issues are identified.
- Rinse the window thoroughly with clean water from the system to remove any remaining dirt or cleaning solution.
- Once cleaning is complete, carefully retract and disassemble the poles, ensuring all equipment is stored safely and securely in the van.
- Conduct a final inspection of the work area to ensure no equipment or debris has been left behind, and that all safety measures have been adhered to throughout the task.
Risk Assessment : Cleaning of Windows
Working at Height : Low (1)
Who might be harmed: Window cleaning operatives | Passers-by or pedestrians
Type of harm: Back / Spinal Injury | Broken Bones | Death | Head Injury | Multiple / Various Injury
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Passers-by Type of harm: Back / Spinal Injury | Broken Bones | Cuts and Abrasions | Death | Head Injury | Multiple / Various Injury | Muscular Injury Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Nearby workers or colleagues Type of harm: Burns | Dermatitis | Eye Damage | Respiratory damage / Asthma / COPD Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Maintenance staff Type of harm: Back / Spinal Injury | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Muscular Injury Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Maintenance personnel Type of harm: Burns | Death | Electrocution Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Maintenance personnel Type of harm: Cuts and Abrasions Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Maintenance staff Type of harm: Illness | Respiratory damage / Asthma / COPD | Dermatitis Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Passers-by or pedestrians Type of harm: Broken Bones | Cuts and Abrasions | Death | Electrocution | Head Injury Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Pedestrians | Cyclists | Motorists Type of harm: Broken Bones | Crush / Entrapment | Death | Head Injury | Multiple / Various Injury Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Passers-by or pedestrians | Vehicle drivers and passengers Type of harm: Cold / Pneumonia | Heat Stroke / Exhaustion | Illness Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Individuals with pre-existing respiratory conditions Type of harm: Asphyxia | Respiratory damage / Asthma / COPD Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives Type of harm: Asphyxia | Illness | Death Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives Type of harm: Eye Damage Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives Type of harm: Dermatitis Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Individuals with respiratory conditions Type of harm: Respiratory damage / Asthma / COPD Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives Type of harm: Eye Damage Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives Type of harm: Dermatitis Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Nearby workers or colleagues Type of harm: Asbestosis / Lung Cancer / Mesothelioma | Asphyxia | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives Type of harm: Eye Damage Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed: Window cleaning operatives | Maintenance staff Type of harm: Burns | Dermatitis Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
The task of cleaning windows involves the removal of dirt, grime, and other residues from glass surfaces to ensure clarity and maintain aesthetic standards. This process typically employs a van-mounted water feed system, utilising long-reach poles equipped with brushes to access high or difficult-to-reach windows safely from the ground. The primary aim is to achieve a streak-free, clean finish while ensuring the safety of personnel and minimising disruption to the surrounding environment. The primary hazards associated with cleaning windows using a van-mounted water feed system with brush and long-reach poles include the risk of falls from height, particularly when working on uneven or unstable surfaces. There is also a potential for slips, trips, and falls due to wet or slippery ground conditions. The use of long-reach poles can lead to musculoskeletal injuries if not handled correctly, and there is a risk of contact with overhead power lines, posing an electrical hazard. Additionally, exposure to hazardous chemicals in cleaning solutions can cause skin irritation or respiratory issues. Manual handling of equipment and materials may result in strains or sprains, and there is a risk of injury from broken glass or sharp window edges. Furthermore, biological hazards such as bird droppings or mould may pose health risks. This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
Slippery Surfaces : Low (1)
Chemical Exposure : Low (1)
Manual Handling : Low (1)
Electrical Hazards : Low (1)
Sharp Edges : Low (1)
Biological Hazards : Low (1)
Equipment Failure : Low (1)
Traffic Hazards : Low (1)
Weather Conditions : Low (1)
COSHH Assessment : Cleaning of Windows
Detergents
Detergents are intended for use in breaking down and removing dirt, grime, and other residues from window surfaces to ensure a clean and clear finish.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Glass cleaners
Glass cleaners are intended for the removal of dirt, grime, and streaks from glass surfaces to ensure clarity and cleanliness.
Inhalation : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Disinfectants
Disinfectants are intended for use in eliminating or reducing harmful microorganisms on window surfaces to ensure a hygienic and safe environment.
Inhalation : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Toolbox Talk : Cleaning of Windows
Introduction
Hazards
Cleaning of Windows : Rules
Cleaning of Windows : Warnings
Induction Record
Company name:
Project title:
Location:
Contract No:
Subject:
Risk Assessment and Method Statement : Cleaning of Windows
Tutor:
Date:
Signature:
Name
Comments
Signature
Date