Risk Assessment and Method Statement Template for Surface Cleaning
This document should not be used until it has been thoroughly reviewed by a competent person.
| Company name: | |
| Project title: | |
| Location: | |
| Contract No: | |
| Author: | |
| Reviewed by: | |
| Date: | |
| Signature: |
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
Method Statement : Surface Cleaning
Explanation
Surface cleaning involves the meticulous removal of dirt, dust, and contaminants from hard surfaces using cleaning chemicals, polish, and cloths. The primary aim of this task is to maintain a clean, hygienic, and safe environment by ensuring that surfaces are free from harmful bacteria and debris. This process requires the careful application of cleaning agents, followed by thorough wiping to achieve a polished finish. It is essential to adhere to proper cleaning techniques and safety protocols to prevent accidents and ensure the effective sanitisation of surfaces.
Responsibilities
- Cleaner : Ensure all surfaces are cleared of items before commencing cleaning and use appropriate cleaning chemicals and cloths to clean surfaces safely.
- Supervisor : Oversee the cleaning process, ensuring compliance with health and safety procedures and that all cleaning tasks are completed to standard.
- Health and Safety Officer : Conduct risk assessments for cleaning tasks and provide training on safe handling and use of cleaning chemicals.
- Maintenance Staff : Ensure all cleaning equipment is in good working order and report any defects or issues promptly.
- Procurement Officer : Source and supply appropriate cleaning chemicals and materials, ensuring they meet safety standards.
Equipment
- Cleaning cloths
- Spray bottle
- Cleaning chemicals/polish
- Gloves
- Safety goggles
- Apron or protective clothing
Operation
- Conduct a risk assessment to identify potential hazards associated with the cleaning task.
- Ensure all cleaning staff have received appropriate training in the use of cleaning chemicals and equipment.
- Review the Safety Data Sheets (SDS) for all cleaning chemicals to understand their hazards and safe handling procedures.
- Inspect the work area for any existing hazards, such as electrical outlets or sharp objects, and address them accordingly.
- Ensure that appropriate personal protective equipment (PPE), such as gloves and eye protection, is available and in good condition.
- Ventilate the area adequately to prevent the accumulation of fumes from cleaning chemicals.
- Remove or secure any items on the surface to be cleaned to prevent damage or obstruction.
- Check that all cleaning equipment, such as spray bottles and cloths, are clean and in proper working order.
- Ensure that emergency contact information and first aid supplies are readily accessible.
- Confirm that all necessary signage, such as wet floor signs, is available for use during the cleaning process.
- Wear personal protective equipment (PPE) such as gloves and eye protection, as appropriate for the cleaning chemicals being used.
- Read and follow the manufacturer’s instructions on the cleaning product label to ensure correct usage and dilution, if necessary.
- Hold the spray bottle at an appropriate distance from the surface, typically 15-20 centimetres, and apply the cleaning chemical evenly across the area to be cleaned.
- Allow the cleaning solution to sit for the recommended contact time as specified by the manufacturer to ensure effective cleaning and disinfection.
- Using a clean, dry cloth, begin wiping the surface in a systematic manner, such as from top to bottom or left to right, to ensure thorough coverage and removal of dirt and residue.
- Apply gentle pressure while wiping to avoid damage to the surface and reduce the risk of musculoskeletal strain.
- Regularly fold or change the cloth to a clean section to prevent spreading dirt or contaminants across the surface.
- If necessary, repeat the spraying and wiping process for heavily soiled areas until the surface is visibly clean.
- Once cleaning is complete, dispose of or launder used cloths according to company policy and hygiene standards.
- Wash hands thoroughly with soap and water after removing PPE and completing the cleaning task.
Risk Assessment : Surface Cleaning
Chemical Exposure : Low (1)
Who might be harmed: Cleaning staff | Maintenance personnel | Vulnerable individuals (e.g., those with allergies or respiratory conditions)
Type of harm: Burns | Dermatitis | Eye Damage | Respiratory damage / Asthma / COPD
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff | Office employees | Visitors
Type of harm:
Back / Spinal Injury | Broken Bones | Cuts and Abrasions | Death | Head Injury | Multiple / Various Injury | Muscular Injury
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff | Contracted cleaning services
Type of harm:
Back / Spinal Injury | Muscular Injury
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff | Maintenance personnel
Type of harm:
Burns | Death | Electrocution
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff | Maintenance personnel
Type of harm:
Cuts and Abrasions
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff | Vulnerable individuals (e.g., those with respiratory conditions)
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Asphyxia | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Burns | Death | Smoke Inhalation
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Eye Damage
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Asphyxia | Respiratory damage / Asthma / COPD
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Eye Damage
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Burns | Dermatitis
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff | Vulnerable individuals with respiratory conditions
Type of harm:
Asphyxia | Respiratory damage / Asthma / COPD
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Asphyxia | Burns | Death | Illness
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Eye Damage
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Burns | Dermatitis
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff | Maintenance personnel
Type of harm:
Asphyxia | Death | Illness | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Asphyxia | Burns | Death | Illness
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Eye Damage
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Burns | Dermatitis
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Respiratory damage / Asthma / COPD
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Eye Damage
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Cleaning staff
Type of harm:
Burns | Dermatitis
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Surface cleaning involves the meticulous removal of dirt, dust, and contaminants from hard surfaces using cleaning chemicals, polish, and cloths. The primary aim of this task is to maintain a clean, hygienic, and safe environment by ensuring that surfaces are free from harmful bacteria and debris. This process requires the careful application of cleaning agents, followed by thorough wiping to achieve a polished finish. It is essential to adhere to proper cleaning techniques and safety protocols to prevent accidents and ensure the effective sanitisation of surfaces. Surface cleaning using cleaning chemicals, polish, and cloth presents several hazards. The primary concern is exposure to hazardous chemicals, which can cause skin irritation, respiratory issues, or allergic reactions. Slips, trips, and falls are also significant risks, particularly if the surface remains wet or if cleaning products spill onto the floor. Additionally, there is a risk of musculoskeletal injuries from repetitive motions or awkward postures while cleaning. Electrical hazards may arise if electrical equipment is used in proximity to wet surfaces. Furthermore, improper use of flammable cleaning agents can lead to fire hazards. It is essential to handle sharp objects or broken glass with care to prevent cuts and puncture wounds. This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
Slips and Falls : Low (1)
Repetitive Strain : Low (1)
Electrical Hazards : Low (1)
Sharp Objects : Low (1)
Inhalation Risks : Low (1)
Fire Hazard : Low (1)
Eye Irritation : Low (1)
COSHH Assessment : Surface Cleaning
Ammonia
Ammonia-based cleaners are intended for use in removing grease and grime from hard surfaces.
Inhalation : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Bleach (Sodium Hypochlorite)
Bleach (Sodium Hypochlorite) is intended for use as a disinfectant to effectively eliminate bacteria, viruses, and fungi on hard surfaces.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Isopropyl Alcohol
Isopropyl Alcohol is intended for use as a disinfectant and cleaning agent to effectively remove dirt, grease, and bacteria from hard surfaces.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Quaternary Ammonium Compounds
Quaternary Ammonium Compounds are intended for use as disinfectants to effectively eliminate bacteria and viruses on hard surfaces.
Inhalation : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Toolbox Talk : Surface Cleaning
Introduction
Hazards
Surface Cleaning : Rules
Surface Cleaning : Warnings
Induction Record
Company name:
Project title:
Location:
Contract No:
Subject:
Risk Assessment and Method Statement : Surface Cleaning
Tutor:
Date:
Signature:
Name Comments Signature Date