Risk Assessment and Method Statement Template for Use of Plant Tools & Equipment
This document should not be used until it has been thoroughly reviewed by a competent person.
| Company name: | |
| Project title: | |
| Location: | |
| Contract No: | |
| Author: | |
| Reviewed by: | |
| Date: | |
| Signature: |
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
RAMS : Use of Plant Tools & Equipment
Site Specific Instructions
Work Process and Associated Hazards Use of Scissor Lift & Cherry Picker Use of Dumper/Dump Truck Use of 360 Excavator for Digging Use of 360 Excavator for Lifting Use of Telehandler Using Forks Use of Telehandler for Suspended Load Use of Fork Lift Truck Use of Hiab/Lorry Loader for Basic Lift Note: All operators must be trained and competent in the use of specific plant tools and equipment. Personal protective equipment (PPE) must be worn as required by site regulations.
Who might be harmed:
Equipment operators | Site workers | Pedestrians
Type of harm:
Back / Spinal Injury | Broken Bones | Crush / Entrapment | Death | Head Injury | Multiple / Various Injury
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Site workers | Pedestrians | Visitors to the site
Type of harm:
Amputation | Back / Spinal Injury | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Death | Head Injury | Multiple / Various Injury
Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Site workers | Visitors to the site
Type of harm:
Broken Bones | Crush / Entrapment | Cuts and Abrasions | Death | Eye Damage | Head Injury | Multiple / Various Injury
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Site workers | Maintenance personnel
Type of harm:
Amputation | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Death | Head Injury | Multiple / Various Injury
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Site workers | Pedestrians | Site visitors
Type of harm:
Amputation | Back / Spinal Injury | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Death | Electrocution | Eye Damage | Head Injury | Multiple / Various Injury | Muscular Injury
Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Site workers | Supervisors
Type of harm:
Amputation | Back / Spinal Injury | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Death | Electrocution | Eye Damage | Head Injury | Multiple / Various Injury | Muscular Injury
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Site workers | Pedestrians
Type of harm:
Broken Bones | Crush / Entrapment | Cuts and Abrasions | Death | Eye Damage | Head Injury | Multiple / Various Injury
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Site workers | Visitors to the site | Delivery personnel
Type of harm:
Back / Spinal Injury | Broken Bones | Cuts and Abrasions | Death | Head Injury | Muscular Injury
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Ground workers | Site supervisors
Type of harm:
Burns | Death | Electrocution
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Site workers | Site visitors | Members of the public
Type of harm:
Amputation | Back / Spinal Injury | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Death | Electrocution | Eye Damage | Head Injury | Multiple / Various Injury
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
All personnel involved in the use of plant tools and equipment must possess the requisite competence and qualifications. Operators are required to hold valid certification for each specific type of equipment they will be operating, such as: Prior to commencing work, all operators must undergo a site-specific induction that includes a detailed briefing on the particular risks associated with the use of plant tools and equipment on this project. This induction will cover: A competency assessment will be conducted by the site supervisor to verify that all operators are familiar with the specific models of equipment they will be using. This assessment will include: Regular toolbox talks will be held to reinforce safe operating practises and address any emerging issues or changes in site conditions. Attendance at these talks is mandatory for all personnel involved in plant operations. The site manager will maintain a register of all certified operators, including copies of their qualifications and records of any additional training undertaken. This register will be reviewed regularly to ensure compliance with current legislation and site requirements. All personnel involved in the use of plant tools and equipment must undergo a comprehensive site induction prior to commencing work. This induction will cover the specific risks and safety procedures associated with the operation of the following equipment: scissor lift, cherry picker, dumper/dump truck, 360 excavator (for both digging and lifting), telehandler (using forks and for suspended loads), forklift truck, and Hiab/lorry loader. Key Procedures: Competency Verification: Each operator must present valid certification or evidence of competency for the specific plant equipment they will be operating. This includes CPCS or NPORS cards, or equivalent qualifications. Equipment-Specific Training: Operators will receive additional training on the specific models of plant equipment used on site. This training will focus on the unique controls, safety features, and operational limits of each machine. Site-Specific Hazards: The induction will highlight any site-specific hazards that may impact the safe operation of plant equipment, such as overhead power lines, underground services, or restricted access areas. Emergency Procedures: Operators will be briefed on emergency procedures relevant to plant operations, including the location of emergency stops, fire extinguishers, and first aid kits. Communication Protocols: Clear communication protocols will be established for plant operators, including the use of hand signals and radio communication to ensure safe coordination with ground personnel. Daily Pre-Start Checks: Operators will be instructed on the requirement to conduct daily pre-start checks on their equipment, ensuring all safety features are functional and any defects are reported immediately. Refresher Training: Regular refresher training sessions will be scheduled to ensure ongoing compliance with safety standards and to address any changes in site conditions or equipment. By adhering to these procedures, the project aims to maintain a high standard of safety and efficiency in the use of plant tools and equipment. All personnel involved in the use of plant tools and equipment must adhere to the following access and egress procedures: Designated Access Routes: Only utilise designated access routes for plant machinery. These routes must be clearly marked and free from obstructions at all times. Entry and Exit Points: Ensure that entry and exit points for plant equipment are clearly identified and maintained. These points should be wide enough to accommodate the safe passage of machinery without risk of collision or damage. Traffic Management: Implement a traffic management plan to control the movement of plant equipment. This includes the use of banksmen where necessary to guide machinery safely, particularly in areas with restricted visibility. Segregation of Pedestrians and Plant: Maintain strict segregation between pedestrian walkways and plant operating areas. Barriers or fencing should be used to prevent unauthorised access to areas where plant tools and equipment are in operation. Signage: Erect clear signage indicating plant operating zones, speed limits, and any other relevant safety information. Signage must be visible and legible to all operators and site personnel. Lighting: Ensure adequate lighting is provided along access routes and operational areas, especially during low-light conditions, to facilitate safe movement of plant equipment. Inspection and Maintenance: Regularly inspect access routes for wear and tear or potential hazards. Any issues identified must be rectified promptly to ensure continued safe access for plant machinery. Emergency Access: Maintain clear emergency access routes at all times. These routes must not be obstructed by plant equipment or materials. Communication: Establish clear communication protocols for operators of plant tools and equipment, ensuring they are aware of any changes to access arrangements or potential hazards on site. All personnel involved in the use of plant tools and equipment shall have access to adequate welfare facilities throughout the duration of the project. Welfare provisions must be strategically located to ensure ease of access for operatives working with scissor lifts, cherry pickers, dumpers, 360 excavators, telehandlers, forklifts, and Hiab/lorry loaders. Rest areas shall be provided to allow operators to take regular breaks, particularly for those engaged in prolonged use of machinery. These areas must be equipped with seating and protection from adverse weather conditions. Sanitary conveniences must be available within a reasonable distance from the work area. Facilities should include clean toilets with handwashing stations, ensuring that operatives can maintain personal hygiene after handling equipment. Drinking water must be readily accessible to all operatives to prevent dehydration, especially during tasks involving physical exertion such as operating heavy machinery. First aid facilities must be on-site and easily accessible. A designated first aider should be present during all operations involving plant tools and equipment to address any potential injuries promptly. Changing facilities should be available for operatives who may need to change into or out of work attire, particularly when transitioning between different types of plant equipment operations. Regular inspections of welfare facilities shall be conducted to ensure they remain in good condition and are adequately stocked. Any deficiencies must be reported immediately and rectified without delay to maintain compliance with health and safety standards. All personnel involved in the use of plant tools and equipment must ensure that special permits are obtained and adhered to prior to commencing any operations. The following procedures are to be strictly followed: Permit to Work (PTW) System: A Permit to Work must be issued for all activities involving the use of plant tools and equipment. This includes, but is not limited to, the operation of scissor lifts, cherry pickers, dumpers, 360 excavators, telehandlers, fork lift trucks, and Hiab/lorry loaders. The PTW must be authorised by a competent person and displayed at the work site. Confined Space Permits: If any plant operation involves entry into confined spaces, a specific Confined Space Permit must be obtained. This ensures that all necessary precautions are in place to manage risks associated with confined space entry. Lifting Operations Permits: For tasks involving lifting, such as using a 360 excavator for lifting or a telehandler for suspended loads, a Lifting Operations Permit is required. This permit must detail the lifting plan, including load weights, lifting points, and equipment specifications. Hot Works Permits: If any hot works are required in conjunction with plant operations, such as welding or cutting near plant equipment, a Hot Works Permit must be secured. This ensures that fire safety measures are implemented. Traffic Management Permits: When plant operations impact site traffic or public roads, a Traffic Management Permit is necessary. This permit outlines the traffic control measures to be implemented to ensure safety. Environmental Permits: If plant operations have potential environmental impacts, such as noise or emissions, an Environmental Permit must be obtained. This ensures compliance with environmental regulations and minimises disruption to the surrounding area. All permits must be reviewed and signed by the relevant parties before work commences. It is imperative that all conditions stipulated in the permits are strictly adhered to throughout the duration of the task. Failure to comply with permit requirements may result in cessation of work and disciplinary action. All plant tools and equipment shall be operated by personnel who are fully trained and competent in their use. Operators must hold valid certification for the specific equipment they are tasked with using, such as IPAF for scissor lifts and cherry pickers, CPCS for dumpers, dump trucks, and 360 excavators, and NPORS or equivalent for telehandlers and forklifts. Prior to commencing work, a thorough inspection of each piece of equipment must be conducted to ensure it is in safe working order. Daily pre-use checks are mandatory and must be documented. Any defects identified must be reported immediately, and the equipment must be taken out of service until repairs are completed. Scissor lifts and cherry pickers must only be used on stable, level ground. Operators must ensure that all safety barriers and guardrails are in place before use. When using a cherry picker, a harness with a lanyard must be worn at all times. For dumpers and dump trucks, operators must adhere to designated routes and speed limits on site. Loads must be evenly distributed and not exceed the manufacturer’s specified capacity. When using a 360 excavator for digging, operators must ensure that the area is clear of personnel and obstructions. A banksman should be present to guide operations when visibility is restricted. For lifting operations with a 360 excavator, a lifting plan must be in place, detailing the load weight, lift radius, and any necessary lifting accessories. Only certified lifting accessories should be used, and they must be inspected prior to use. Telehandlers using forks should only transport loads that are stable and secure. Operators must ensure that the load does not obstruct their view and that the forks are positioned correctly to prevent tipping. When using a telehandler for suspended loads, a dedicated lifting plan is required. The load must be securely attached using appropriate lifting accessories, and a banksman should oversee the operation to ensure safety. Forklift trucks must only be operated on surfaces that can support their weight and the weight of the load. Operators should avoid sudden movements that could destabilise the load or the vehicle. For Hiab/lorry loader operations, operators must ensure that stabilisers are fully deployed before lifting. The load should be assessed for weight and balance, and lifting should only proceed if conditions are deemed safe. All operators must maintain constant communication with their team members during operations, using hand signals or radios as appropriate. Safety zones around operating equipment must be established to prevent unauthorised access. All personnel involved in the use of plant tools and equipment must ensure that all services are identified and isolated prior to commencing work. This includes electrical, gas, water, and any other relevant services that may be present on site. Pre-Operational Checks: Isolation Procedures: Verification: Communication: Reactivation: By adhering to these procedures, the risk of accidental contact with live services during the use of plant tools and equipment is minimised, ensuring a safe working environment for all operatives. All personnel involved in the use of plant tools and equipment must be aware of the potential hazardous substances associated with these activities. Diesel fuel, hydraulic oils, and lubricants are commonly used and must be handled with care to prevent spills and exposure. Storage and Handling: All hazardous substances must be stored in designated areas with appropriate containment measures to prevent leaks or spills. Containers must be clearly labelled and kept sealed when not in use. Spill Response: In the event of a spill, operators must immediately implement spill response procedures. This includes using spill kits available on-site to contain and clean up the spill promptly. All waste material must be disposed of in accordance with environmental regulations. Personal Protective Equipment (PPE): Operators must wear appropriate PPE, including gloves and eye protection, when handling hazardous substances. PPE must be inspected regularly and replaced as necessary to ensure effectiveness. Training: All personnel must receive training on the safe handling and use of hazardous substances, including emergency procedures for dealing with spills or exposure. Ventilation: Ensure adequate ventilation when operating plant equipment indoors or in enclosed spaces to prevent the build-up of fumes from fuels and oils. Monitoring: Regular inspections must be conducted to ensure compliance with hazardous substance procedures, and any incidents must be reported and investigated to prevent recurrence. By adhering to these specific procedures, the risks associated with hazardous substances during the use of plant tools and equipment can be effectively managed. All deliveries of plant tools and equipment shall be scheduled to minimise disruption and ensure safety on site. Delivery times must be coordinated with the site manager to avoid peak hours and ensure that adequate personnel are available for unloading and handling. Upon arrival, delivery vehicles must report to the designated site entrance and await further instructions. A competent person shall be responsible for directing vehicles to the appropriate unloading area, ensuring that traffic management plans are adhered to at all times. Unloading operations must be conducted using appropriate lifting equipment, such as forklifts or telehandlers, operated by trained personnel. The use of a banksman is mandatory during these operations to guide the driver and ensure the safety of all personnel in the vicinity. All plant tools and equipment must be inspected upon delivery for any signs of damage or defects. Any issues identified must be reported immediately to the site manager and recorded in the delivery log. Storage areas for plant tools and equipment must be clearly marked and kept tidy to prevent accidents. Equipment should be stored in a manner that prevents unauthorised access and potential misuse. When handling materials, ensure that manual handling procedures are followed to prevent injury. Mechanical aids should be used wherever possible to reduce manual handling risks. All personnel involved in deliveries and materials handling must wear appropriate personal protective equipment (PPE), including high-visibility clothing, safety boots, and hard hats. Regular toolbox talks shall be conducted to reinforce safe practises and address any concerns related to deliveries and materials handling. All personnel involved in the use of plant tools and equipment must adhere to the following Personal Protective Equipment (PPE) procedures to ensure safety and compliance with health and safety regulations: Hard Hats: Mandatory for all operatives to protect against potential head injuries from overhead hazards or falling objects during the operation of plant equipment such as scissor lifts, cherry pickers, and 360 excavators. High-Visibility Clothing: All workers must wear high-visibility vests or jackets to ensure they are easily seen by operators of moving plant equipment, particularly in areas with limited visibility or during low-light conditions. Safety Footwear: Steel-toe capped boots are required to protect feet from heavy objects and provide stability on uneven surfaces when operating or working around dumpers, dump trucks, and forklifts. Gloves: Appropriate gloves must be worn to protect hands from cuts, abrasions, and vibrations when handling equipment controls or performing maintenance tasks on machinery such as telehandlers and Hiab/lorry loaders. Eye Protection: Safety goggles or glasses are necessary when there is a risk of flying debris or dust, particularly during excavation activities with 360 excavators or when loading materials. Hearing Protection: Ear defenders or earplugs should be used in high-noise environments, especially when operating loud machinery like dump trucks and excavators for extended periods. Respiratory Protection: Dust masks or respirators must be worn if there is a risk of inhaling dust or fumes, particularly during operations that generate airborne particles. All PPE must be inspected prior to use to ensure it is in good condition and fit for purpose. Any damaged or defective PPE should be reported immediately and replaced before commencing work. Compliance with these procedures will be monitored regularly to maintain a safe working environment. In the event of an emergency during the use of plant tools and equipment, the following procedures must be adhered to: Immediate Response: Communication: Evacuation: First Aid: Fire Safety: Spillages: Post-Emergency Actions: Training and Drills: These procedures are critical to ensuring the safety of all personnel involved in the use of plant tools and equipment on-site. All plant operations shall be conducted with the utmost regard for the safety of the public and occupiers. Barriers and signage will be erected to clearly delineate work areas, ensuring that unauthorised personnel are kept at a safe distance from operational zones. Spotters will be employed during the use of mobile plant equipment such as scissor lifts, cherry pickers, and telehandlers to ensure that no members of the public inadvertently enter the work area. These spotters will maintain constant communication with the plant operators to manage any potential risks. Traffic management plans will be implemented to control the movement of dumpers, dump trucks, and 360 excavators, particularly in areas where public access is unavoidable. This includes the use of banksmen to guide vehicles safely and prevent any interaction with pedestrians. For operations involving lifting activities, such as those conducted with 360 excavators or Hiab/lorry loaders, exclusion zones will be established. These zones will be clearly marked and monitored to prevent public access during lifting operations. Noise and dust suppression measures will be in place to minimise disruption to nearby occupiers. This includes the use of water suppression systems and noise barriers where necessary. All plant operators will be required to conduct a pre-start safety briefing each day, focusing on public safety considerations and any changes in site conditions that may affect public safety. In the event of an emergency, clear evacuation routes will be maintained at all times, and all personnel will be briefed on emergency procedures specific to plant operations. All personnel involved in the use of plant tools and equipment must be vigilant for any signs of asbestos-containing materials (ACMs) during operations. Prior to commencement, a thorough asbestos survey must be conducted to identify any potential ACMs within the work area. If ACMs are identified, the following procedures must be adhered to: During operations, operators must remain alert to any changes in site conditions that may indicate the presence of ACMs. Regular toolbox talks should reinforce awareness and response protocols related to asbestos. In case of accidental disturbance, follow emergency procedures, including immediate evacuation of the area and notification of emergency services if necessary. Ensure all personnel are equipped with appropriate PPE, including respiratory protective equipment, when working in proximity to potential ACMs. Monitoring of the use of plant tools and equipment shall be conducted through a structured approach to ensure compliance with health and safety standards. Daily Inspections: Operational Monitoring: Competency Verification: Environmental Conditions: Incident Reporting: Review Meetings: All waste generated from the use of plant tools and equipment shall be managed in accordance with the following procedures: Segregation and Collection: Storage: Disposal: Spill Response: Monitoring and Reporting: Minimisation: By adhering to these procedures, the project aims to manage waste effectively, ensuring compliance with environmental regulations and promoting sustainable practises. All plant tools and equipment shall be operated in a manner that minimises environmental impact. Operators must ensure that all machinery is maintained to prevent leaks and emissions. Regular checks for oil, fuel, and hydraulic fluid leaks are mandatory before and after use. Any identified leaks must be reported immediately and rectified without delay. Noise levels must be controlled by ensuring that all equipment is fitted with appropriate silencers and maintained to manufacturer specifications. Operators should avoid unnecessary idling of engines to reduce noise pollution and emissions. Dust suppression measures must be implemented when using equipment such as the 360 excavator for digging. Water sprays or dust suppression systems should be employed to minimise airborne particles, particularly in dry conditions. Fuel storage for plant equipment must comply with environmental regulations. All fuel containers must be stored in designated areas with secondary containment to prevent spills. Refuelling activities should be conducted with care, using drip trays to catch any spills, and operators must be trained in spill response procedures. Waste generated from maintenance activities, such as used oil or filters, must be disposed of in accordance with waste management protocols. All waste must be segregated and stored in appropriate containers until it can be removed by a licenced waste carrier. Operators must remain vigilant to the presence of wildlife and natural habitats. Work areas should be inspected prior to commencement to ensure no disturbance to protected species or habitats occurs. If any such presence is identified, work must cease immediately, and the site manager should be informed for further assessment. By adhering to these procedures, the project will ensure compliance with environmental legislation and minimise its ecological footprint. The use of plant tools and equipment, including scissor lifts, cherry pickers, dumpers, 360 excavators, telehandlers, forklifts, and Hiab/lorry loaders, necessitates careful consideration of potential disturbances to near neighbours. Communication: Prior to commencement, a detailed schedule of operations will be communicated to all neighbouring properties. This will include the expected duration and timing of activities involving plant equipment. Noise Control: All plant machinery will be fitted with appropriate noise suppression devices. Operators will be instructed to minimise idling time and to switch off engines when not in use. Dust Management: Dust suppression measures, such as water spraying, will be employed during operations that may generate dust, particularly when using excavators for digging. Traffic Management: A traffic management plan will be implemented to control the movement of plant equipment, ensuring minimal disruption to local traffic and pedestrian pathways. Working Hours: Operations involving plant tools and equipment will be restricted to agreed working hours to prevent disturbance during early mornings, evenings, and weekends. Monitoring: Regular monitoring will be conducted to ensure compliance with noise and dust control measures. Any complaints from neighbours will be logged and addressed promptly. Signage: Clear signage will be placed around the site perimeter to inform neighbours of ongoing works and provide contact details for any concerns or queries. By adhering to these procedures, the project aims to mitigate any potential nuisance to near neighbours while maintaining efficient and safe operations. All personnel involved in the use of plant tools and equipment must undergo a pre-employment health assessment to ensure they are fit for the tasks required. Regular health surveillance will be conducted to monitor any potential adverse effects from exposure to noise, vibration, and exhaust emissions associated with plant operations. Operators must be trained in the correct posture and techniques to minimise the risk of musculoskeletal disorders. Manual handling assessments should be conducted for tasks involving the lifting or moving of equipment components. Hearing protection is mandatory when operating or working near plant equipment, as noise levels may exceed safe thresholds. Regular checks of hearing protection equipment must be carried out to ensure effectiveness. To mitigate the risk of hand-arm vibration syndrome (HAVS), operators must adhere to specified usage times for vibrating equipment. Vibration exposure records should be maintained, and equipment must be regularly serviced to minimise vibration levels. Respiratory protection may be required when operating diesel-powered plant equipment in enclosed or poorly ventilated areas to prevent inhalation of harmful exhaust fumes. Monitoring of air quality should be conducted to ensure compliance with occupational exposure limits. Operators must have access to adequate hydration and rest breaks to prevent fatigue, which can compromise safety when operating heavy machinery. A schedule for breaks should be established and adhered to rigorously. In the event of any health concerns or symptoms related to plant operation, personnel must report immediately to their supervisor and seek medical advice. Incident reporting procedures must be followed to ensure prompt investigation and resolution. All amendments to the method statement concerning the use of plant tools and equipment must be authorised by the Site Manager. Any proposed changes should be documented in writing and submitted for review. Operators of plant tools and equipment, such as scissor lifts, cherry pickers, dumpers, 360 excavators, telehandlers, forklifts, and Hiab/lorry loaders, must be informed of any amendments prior to implementation. This ensures that all personnel are aware of the updated procedures and safety measures. In the event of an amendment, a toolbox talk will be conducted to communicate the changes to all relevant personnel. Attendance at this briefing is mandatory, and records of attendance will be maintained. The authorisation process requires that any amendment is reviewed for its impact on safety, efficiency, and compliance with relevant legislation. The Site Manager will consult with the Health and Safety Advisor if necessary to ensure that all risks are adequately controlled. Once authorised, the amended method statement will be distributed electronically to all relevant parties and a hard copy will be available on-site. It is imperative that only the most current version of the method statement is in use. In cases where immediate amendments are necessary due to unforeseen circumstances, verbal authorisation may be granted by the Site Manager, followed by formal documentation as soon as practicable.
Who might be harmed:
Equipment operators | Site workers in proximity | Maintenance personnel
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Asphyxia | Death | Illness | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers
Type of harm:
Illness | Death
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Maintenance personnel
Type of harm:
Eye Damage
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Maintenance personnel | Site labourers
Type of harm:
Dermatitis
Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Maintenance personnel
Type of harm:
Death | Eye Damage | Illness | Multiple / Various Injury
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Maintenance personnel
Type of harm:
Eye Damage
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Maintenance personnel | Site labourers
Type of harm:
Dermatitis
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Maintenance personnel
Type of harm:
Respiratory damage / Asthma / COPD
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Maintenance personnel
Type of harm:
Illness | Death
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Maintenance personnel
Type of harm:
Eye Damage
Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Maintenance personnel
Type of harm:
Dermatitis
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Maintenance personnel
Type of harm:
Death | Illness
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Maintenance personnel
Type of harm:
Eye Damage
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Equipment operators | Maintenance personnel
Type of harm:
Dermatitis
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.Site Specific Hazards
Overturning : Low (1)
Collision with pedestrians or other vehicles : Low (1)
Falling objects : Low (1)
Mechanical failure : Low (1)
Operator error : Low (1)
Inadequate training : Low (1)
Poor visibility : Low (1)
Slips, trips, and falls : Low (1)
Contact with overhead power lines : Low (1)
Unauthorised use : Low (1)
Procedures
Personnel and competence
Site inductions and training
Access and egress arrangements
Welfare
Special permits
Tools and equipment
Services and isolations
Hazardous substances
Deliveries and materials handling
PPE
Emergency procedures
Safety of public and occupiers
Asbestos
Monitoring
Operators are required to perform daily pre-use inspections of all plant tools and equipment, including scissor lifts, cherry pickers, dumpers, 360 excavators, telehandlers, forklifts, and Hiab/lorry loaders. These inspections must be documented and any defects reported immediately to the site supervisor.
Site supervisors shall conduct regular spot checks during operations to verify that equipment is being used in accordance with the method statement and manufacturer’s guidelines. Particular attention should be paid to the correct use of safety features and adherence to load limits.
Regular audits will be carried out to ensure that all personnel operating plant tools and equipment hold the necessary certifications and have received appropriate training. Records of training and competency must be maintained and reviewed periodically.
Monitoring of environmental conditions such as weather, ground stability, and visibility is essential. Operations involving plant tools and equipment must be adjusted or suspended if conditions are deemed unsafe.
All incidents, near misses, or unsafe practises observed during the use of plant tools and equipment must be reported immediately. An investigation will be conducted to identify root causes and implement corrective actions.
Weekly review meetings will be held with the project team to discuss findings from monitoring activities, address any issues, and update procedures as necessary to enhance safety performance.Waste management
Environmental considerations
Near neighbours and nuisance
Occupational health
Amendments and authorisation
Activities
Preparation and Setup
Use of Scissor Lift and Cherry Picker
Operation of Dumper/Dump Truck
Digging with 360 Excavator
Lifting with 360 Excavator
Operation of Telehandler using Forks
Handling Suspended Loads with Telehandler
Operation of Fork Lift Truck
Basic Lifting with Hiab/Lorry Loader
Cleaning Up and Finishing
Hazardous Substances
Diesel fuel
Diesel fuel is intended for use as the primary energy source to power the engines of plant tools and equipment.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Hydraulic oil
Hydraulic oil is utilised to transmit power within the hydraulic systems of plant equipment, ensuring efficient operation and control.
Injection : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Engine oil
Engine oil is intended for lubricating the moving parts of plant machinery to ensure efficient operation and prevent wear.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Antifreeze
Antifreeze is utilised to prevent the engine coolant from freezing in low temperatures and overheating in high temperatures, ensuring optimal performance of plant equipment.
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Induction Record
Company name:
Project title:
Location:
Contract No:
Subject:
Method Statement : Use of Plant Tools & Equipment
Tutor:
Date:
Signature:
Name Comments Signature Date