Risk Assessment and Method Statement Template for Marine and Maritime Operations
This document should not be used until it has been thoroughly reviewed by a competent person.
| Company name: | |
| Project title: | |
| Location: | |
| Contract No: | |
| Author: | |
| Reviewed by: | |
| Date: | |
| Signature: |
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
RAMS : Marine and Maritime Operations
Site Specific Instructions
Work Process and Associated Hazards Launch of Rigid Inflatable Boat (RIB) Recovery of Rigid Inflatable Boat (RIB) Man Overboard Procedure Casualty Recovery Procedure
Who might be harmed:
Crew members | Passengers | Rescue personnel
Type of harm:
Asphyxia | Death | Drowning
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Crew members | Maintenance personnel | Contractors
Type of harm:
Back / Spinal Injury | Broken Bones | Cuts and Abrasions | Death | Head Injury | Muscular Injury
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Crew members | Passengers | Maintenance personnel
Type of harm:
Amputation | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Death | Drowning | Electrocution | Eye Damage | Head Injury
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Crew members | Passengers | Rescue personnel
Type of harm:
Cold / Pneumonia | Drowning | Head Injury | Illness | Multiple / Various Injury
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Crew members | Passengers | Other vessel operators
Type of harm:
Broken Bones | Crush / Entrapment | Cuts and Abrasions | Death | Drowning | Head Injury | Multiple / Various Injury
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Crew members | Passengers | Rescue personnel | Divers
Type of harm:
Cold / Pneumonia | Death | Illness
Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Crew members | Maintenance personnel | Deckhands
Type of harm:
Back / Spinal Injury | Broken Bones | Cuts and Abrasions | Muscular Injury
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Crew members | Rescue personnel | Maintenance staff
Type of harm:
Amputation | Asphyxia | Back / Spinal Injury | Broken Bones | Crush / Entrapment | Death | Head Injury | Multiple / Various Injury
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Crew members | Skippers | Deckhands | Rescue teams
Type of harm:
Back / Spinal Injury | Cuts and Abrasions | Death | Drowning | Head Injury | Illness | Multiple / Various Injury | Muscular Injury
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Crew members | Passengers | Rescue personnel | Other vessel operators
Type of harm:
Broken Bones | Cuts and Abrasions | Death | Drowning | Eye Damage | Head Injury | Multiple / Various Injury
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
All personnel involved in marine and maritime operations must possess the necessary qualifications and experience pertinent to their specific roles. Competency certificates for operating marine vessels, such as the Rigid Inflatable Boat (RIB), must be verified and documented prior to commencement of operations. Training records should confirm that all crew members have undergone recent and relevant training in maritime safety procedures, including man overboard and casualty recovery protocols. It is imperative that personnel are familiar with the specific equipment and emergency procedures associated with the RIB operations. A designated safety officer shall be appointed to oversee the operations, ensuring compliance with safety standards and procedures. This individual must have demonstrable experience in maritime safety management. Regular safety briefings are to be conducted before each operation, highlighting specific risks and emergency procedures. Attendance at these briefings is mandatory for all personnel involved in the task. In addition, a competency assessment should be carried out periodically to ensure ongoing proficiency in handling marine emergencies and operating the RIB under various conditions. This assessment should be documented and reviewed by the project manager to ensure continuous improvement in safety practises. All personnel involved in marine and maritime operations must undergo a comprehensive site induction prior to commencing any tasks. This induction will cover the specific risks and safety measures associated with the launch and recovery of the Rigid Inflatable Boat (RIB), as well as the man overboard and casualty recovery procedures. Key Points: Induction Timing: Inductions will be conducted at the start of each project phase and whenever new personnel join the team. Content: The induction will include detailed briefings on: Training Requirements: Personnel must demonstrate competence in: Verification: Attendance and understanding will be verified through a sign-off sheet, which will be retained for record-keeping purposes. Refresher Sessions: Regular refresher sessions will be scheduled to ensure ongoing competence, particularly focusing on emergency response drills. Emphasis on Safety: It is imperative that all personnel are fully aware of the unique hazards present in marine environments and are trained to respond effectively to any incidents. All personnel involved in marine and maritime operations must utilise designated access points to the dockside, ensuring that these are kept clear of obstructions at all times. Access to the Rigid Inflatable Boat (RIB) is to be conducted via the approved gangway, which must be securely fastened and regularly inspected for stability and safety. Egress from the RIB during both launch and recovery operations shall be executed with caution, adhering to the following procedures: Emergency egress procedures must be clearly communicated to all team members, with emphasis on the location of life-saving appliances and emergency muster points. Regular drills will be conducted to ensure familiarity with these procedures. Restricted areas around the launch and recovery zones must be clearly marked, and access limited to authorised personnel only. This is to prevent unauthorised entry and ensure the safety of all individuals on site. All personnel must wear appropriate Personal Protective Equipment (PPE) when accessing or egressing the RIB, including life jackets, which are mandatory at all times when on or near the water. All personnel involved in marine and maritime operations shall have access to appropriate welfare facilities to ensure their health and well-being during the course of the project. Welfare facilities will be strategically located to ensure ease of access from the operational area, particularly considering the unique challenges posed by the marine environment. Sanitary conveniences will be provided onshore, with facilities maintained in a clean and hygienic condition. Regular inspections will be conducted to ensure compliance with health standards. Handwashing facilities with running water, soap, and drying provisions will be available to all operatives. Rest areas will be designated onshore, equipped with seating and shelter from adverse weather conditions. These areas will provide a space for operatives to take breaks and consume meals. Drinking water will be readily available, ensuring hydration is maintained throughout operations. In the event of adverse weather conditions or prolonged exposure to the elements, temporary shelter will be provided on the vessel or at a nearby location to protect personnel from potential health risks associated with extreme weather. First aid provisions will be readily accessible both onshore and aboard the RIB. A qualified first aider will be present during all operations, and a fully stocked first aid kit will be available to address any minor injuries or medical needs promptly. All personnel will be briefed on the location and use of welfare facilities during the site induction, ensuring familiarity and compliance with welfare procedures. Regular reviews of welfare arrangements will be conducted to ensure they remain adequate and effective throughout the duration of the project. All personnel involved in marine and maritime operations must obtain the necessary special permits prior to commencing any task. These permits are essential to ensure compliance with maritime safety regulations and to mitigate risks associated with the operations. Permit to Launch and Recover RIB: Man Overboard Procedure Permit: Casualty Recovery Procedure Permit: All permits must be documented and retained on site for the duration of the project. Failure to obtain the necessary permits will result in immediate cessation of operations until compliance is achieved. All tools and equipment utilised in marine and maritime operations must be inspected prior to use to ensure they are in optimal working condition. Pre-use checks are mandatory and must be documented, focusing on the integrity of the equipment, particularly for any signs of wear or damage that could compromise safety. RIB Launch and Recovery Equipment: The winch and davit systems used for launching and recovering the Rigid Inflatable Boat (RIB) must be thoroughly checked for operational efficiency. Ensure that all cables, hooks, and securing mechanisms are free from corrosion and function correctly. Regular maintenance schedules must be adhered to, with records kept on-site. Communication Devices: Radios and other communication devices must be tested for clarity and range before operations commence. It is imperative that all personnel are familiar with their operation and that backup devices are available in case of failure. Safety Equipment: Life jackets, harnesses, and other personal flotation devices must be inspected for buoyancy and integrity. Each item should be assigned to a specific individual, ensuring correct fit and functionality. Casualty Recovery Tools: Equipment such as stretchers or rescue slings must be readily accessible and in good condition. Personnel must be trained in their use, with regular drills conducted to ensure proficiency. Man Overboard Retrieval Systems: Ensure that retrieval systems, such as throw lines or rescue nets, are strategically placed and easily deployable. These systems must be checked for readiness at the start of each shift. All equipment must be stored securely when not in use to prevent damage from environmental conditions. Regular audits of tools and equipment should be conducted to ensure compliance with safety standards and operational requirements. All personnel involved in marine and maritime operations must ensure that all electrical and mechanical services related to the launch and recovery of the Rigid Inflatable Boat (RIB) are properly isolated prior to commencing any task. This includes: Verification of Isolation: Confirm that all power sources to winches, cranes, and other lifting equipment are de-energised and locked out. Use lockout/tagout procedures to prevent accidental re-energisation. Communication Protocols: Establish clear communication channels between the vessel crew and shore-based personnel to coordinate the isolation of services. This ensures that all parties are aware of the status of isolations. Hydraulic Systems: For operations involving hydraulic systems, ensure that all hydraulic lines are depressurised and isolated. Regularly inspect hoses and connections for leaks or damage. Fuel Systems: Isolate fuel lines and ensure that all fuel valves are securely closed when not in use. Conduct regular checks for leaks or spills, and have spill kits readily available. Emergency Isolation Procedures: In the event of an emergency, ensure that all personnel are familiar with the location and operation of emergency stop buttons and isolation points for all equipment. Documentation: Maintain a log of all isolation activities, including the date, time, and personnel responsible for each isolation. This documentation should be reviewed regularly to ensure compliance with safety protocols. By adhering to these specific procedures, the risk of accidental energisation or service-related incidents during marine and maritime operations is significantly reduced. All personnel involved in marine and maritime operations must be aware of the potential presence of hazardous substances, particularly those associated with fuel and lubricants used in the operation of the Rigid Inflatable Boat (RIB). Fuel Handling: Lubricants and Oils: Cleaning Agents: Disposal Procedures: Training and Awareness: By adhering to these procedures, the risk associated with hazardous substances during marine and maritime operations can be effectively managed, ensuring safety and environmental protection. All deliveries of equipment and materials for marine and maritime operations shall be coordinated to ensure minimal disruption to the site and surrounding areas. Delivery schedules must be strictly adhered to, with all parties informed of any changes in advance. Upon arrival, delivery vehicles shall be directed to designated unloading areas by a competent banksman. Vehicles must not obstruct access routes or emergency exits at any time. All personnel involved in unloading must wear appropriate PPE, including high-visibility clothing and safety footwear. Manual handling of materials should be minimised. Where possible, mechanical aids such as cranes or forklifts should be utilised to transfer equipment and materials from delivery vehicles to the designated storage or operational areas. All lifting operations must be conducted in accordance with the Lifting Operations and Lifting Equipment Regulations (LOLER) 1998. Materials and equipment must be securely stored on-site to prevent movement due to environmental conditions such as wind or tide. Storage areas should be clearly marked and kept tidy to avoid trip hazards and ensure easy access. For the launch and recovery of the Rigid Inflatable Boat (RIB), all equipment, including winches and slings, must be inspected prior to use. Only trained personnel are permitted to operate such equipment, ensuring compliance with the Provision and Use of Work Equipment Regulations (PUWER) 1998. In the event of adverse weather conditions, deliveries may need to be postponed. The site manager will assess the situation and communicate any necessary changes to the delivery schedule promptly. All personnel involved in marine and maritime operations must adhere to the following Personal Protective Equipment (PPE) procedures to ensure safety and compliance with relevant regulations: Life Jackets: Footwear: Thermal Protection: Helmets: Gloves: Eye Protection: Communication Devices: Inspection and Maintenance: By adhering to these specific PPE procedures, the safety of all personnel engaged in marine and maritime operations will be significantly enhanced. In the event of an emergency during marine and maritime operations, the following procedures shall be strictly adhered to: Immediate Response: Man Overboard Procedure: Casualty Recovery Procedure: Communication Protocols: Emergency Equipment: Training and Drills: Post-Incident Review: The safety of the public and occupiers during marine and maritime operations is of paramount importance. The following procedures shall be strictly adhered to: Exclusion Zones: Clearly marked exclusion zones will be established around the launch and recovery areas of the Rigid Inflatable Boat (RIB). These zones will be enforced to prevent unauthorised access by the public and non-essential personnel. Signage and Barriers: Appropriate signage will be displayed prominently to inform the public of ongoing operations and potential hazards. Physical barriers will be erected where necessary to restrict access to operational areas. Public Awareness: Prior to commencing operations, a public awareness campaign will be conducted. This will include notifications to local marinas, harbour authorities, and relevant stakeholders to inform them of the schedule and nature of the operations. Safety Briefings: All personnel involved in the operations will receive comprehensive safety briefings, which will include instructions on maintaining vigilance for public safety and reporting any breaches of exclusion zones immediately. Monitoring and Surveillance: Continuous monitoring of the operational area will be conducted using designated personnel equipped with communication devices. Surveillance will ensure that no unauthorised individuals enter restricted areas during operations. Emergency Response: In the event of an emergency, such as a man overboard or casualty recovery, procedures will be in place to ensure swift action while maintaining public safety. Emergency services will be notified as required, and operations will be halted if necessary to address the situation safely. Communication Protocols: Effective communication protocols will be established between the operation team and local authorities to ensure rapid dissemination of information regarding any incidents that may impact public safety. By implementing these specific procedures, the safety of the public and occupiers during marine and maritime operations will be effectively managed and maintained. In the context of marine and maritime operations, it is imperative to ensure that all personnel are aware of the potential presence of asbestos, particularly in older vessels or maritime structures. Prior to commencing any operations, a thorough asbestos survey must be conducted by a competent person to identify any asbestos-containing materials (ACMs) within the operational area. Identification and Assessment: Control Measures: Training and PPE: Emergency Procedures: Monitoring and Review: Monitoring of marine and maritime operations will be conducted with a focus on ensuring the safety and efficiency of all activities. Continuous observation of weather conditions is paramount, as adverse weather can significantly impact operations. A designated team member will be responsible for monitoring weather forecasts and real-time updates, ensuring that any changes are communicated promptly to all personnel involved. Regular inspections of the Rigid Inflatable Boat (RIB) and associated equipment will be carried out before and after each launch and recovery operation. This includes checking the integrity of the hull, engine performance, and the functionality of all safety equipment such as life jackets and communication devices. Any defects or issues identified must be reported immediately to the site supervisor and rectified before proceeding with operations. During operations, real-time communication between the vessel crew and the shore-based team will be maintained using VHF radios. This ensures that any incidents or deviations from the planned procedure are addressed swiftly. The man overboard and casualty recovery procedures will be rehearsed regularly to ensure all personnel are familiar with their roles and responsibilities. Environmental monitoring will also be conducted to assess any potential impacts on marine life and water quality. This includes observing for any signs of pollution or disturbance caused by the operations. Any environmental concerns must be documented and reported to the environmental officer for further action. Finally, a post-operation review will be conducted to evaluate the effectiveness of the procedures and identify any areas for improvement. Feedback from all team members will be gathered to enhance future operations and ensure compliance with health and safety standards. All waste generated during marine and maritime operations must be managed in accordance with relevant environmental regulations and best practises. Waste segregation is paramount; all waste materials should be categorised into hazardous and non-hazardous waste streams. Hazardous waste, such as fuel residues, oil, and contaminated materials, must be stored in clearly labelled, secure containers to prevent any leakage or spillage. These containers should be kept on board the vessel until they can be safely transported to an authorised disposal facility. Non-hazardous waste, including general refuse and packaging materials, should be collected in designated bins on the vessel. Regular checks must be conducted to ensure that waste is not inadvertently discharged into the marine environment. Waste transfer records must be meticulously maintained, documenting the type and quantity of waste, as well as the date and method of disposal. This documentation is crucial for compliance and auditing purposes. All personnel involved in waste management must receive appropriate training to ensure they are aware of the procedures and the importance of preventing marine pollution. Regular inspections should be carried out to ensure adherence to these procedures, with any non-compliance promptly addressed. In the event of a spill or accidental discharge, immediate action must be taken to contain and clean up the spill, following the established emergency response procedures. All incidents must be reported to the relevant authorities as required by law. Marine and maritime operations necessitate stringent environmental considerations to mitigate potential impacts on the surrounding ecosystem. The following procedures are to be adhered to: Minimisation of Water Pollution: All personnel must ensure that no fuel, oil, or other hazardous substances are discharged into the water. Refuelling of the RIB should be conducted onshore with spill kits readily available. Any accidental spills must be reported immediately and contained using appropriate spill response equipment. Waste Management: All waste generated during operations, including packaging and consumables, must be collected and disposed of in designated onshore facilities. No waste is to be discarded overboard. Noise Control: Efforts should be made to minimise noise pollution by maintaining equipment in good working order and using noise-dampening measures where feasible. Operations should be scheduled to avoid sensitive times for local wildlife. Wildlife Protection: Personnel must remain vigilant for the presence of marine wildlife. Operations should be temporarily halted if wildlife is observed in close proximity to prevent disturbance or harm. Sediment Disturbance: Care should be taken to avoid unnecessary disturbance of the seabed during launch and recovery of the RIB. The use of designated launch areas is encouraged to minimise impact. Monitoring and Reporting: Continuous monitoring of environmental conditions is required throughout the operation. Any deviations from expected conditions or incidents impacting the environment must be documented and reported to the site manager immediately. By adhering to these procedures, the project aims to uphold its commitment to environmental stewardship while conducting marine and maritime operations. Marine and maritime operations, particularly those involving the launch and recovery of Rigid Inflatable Boats (RIBs), can potentially cause disturbances to near neighbours. To mitigate such nuisances, the following project-specific procedures shall be implemented: Communication: Prior to commencing operations, a detailed briefing will be conducted with all personnel to ensure awareness of the proximity of residential or commercial properties. A communication plan will be established to inform neighbours of the schedule and nature of operations, including any potential noise or disruption. Noise Control: Operations will be scheduled during agreed-upon hours to minimise disturbance. The use of equipment with noise-reducing features will be prioritised. Engines will be maintained in optimal condition to reduce noise emissions, and idling will be minimised. Lighting: If operations extend into low-light conditions, lighting will be directed away from neighbouring properties to prevent light pollution. The use of shielded fixtures will be employed to focus light only where necessary. Traffic Management: The movement of vehicles and equipment to and from the site will be carefully managed to avoid congestion and minimise disruption to local traffic patterns. Designated routes will be established and communicated to all personnel. Waste Management: All waste generated from operations will be promptly collected and disposed of in accordance with environmental regulations. Measures will be taken to prevent debris from entering the waterway or surrounding areas. Environmental Considerations: Operations will be conducted with due regard for local wildlife and habitats. Any potential impacts on marine life will be assessed, and appropriate mitigation measures will be implemented. Feedback Mechanism: A point of contact will be provided for neighbours to raise concerns or provide feedback regarding the operations. Any issues raised will be addressed promptly, and adjustments to procedures will be made as necessary to minimise further disturbances. By adhering to these procedures, the project aims to maintain a harmonious relationship with near neighbours while ensuring the safe and efficient execution of marine and maritime operations. All personnel involved in marine and maritime operations must undergo a comprehensive health assessment prior to commencing work. This assessment will ensure that individuals are fit for the physical demands of the tasks, particularly those involving the launch and recovery of Rigid Inflatable Boats (RIBs) and emergency procedures such as man overboard and casualty recovery. Hydration and Nutrition: Fatigue Management: Motion Sickness: Exposure to Elements: Noise and Vibration: Manual Handling: Psychological Well-being: By adhering to these specific procedures, the occupational health of all personnel engaged in marine and maritime operations will be safeguarded, ensuring a safe and efficient working environment. All amendments to the method statement for marine and maritime operations must be documented and authorised prior to implementation. Any changes to procedures, personnel, or equipment must be reviewed by the project manager and the health and safety advisor. Authorisation is required from the project manager, who will ensure that all amendments comply with relevant maritime safety regulations and standards. The health and safety advisor will assess the potential impact of any changes on the safety of operations, particularly focusing on the launch and recovery of the Rigid Inflatable Boat (RIB), as well as man overboard and casualty recovery procedures. Communication of amendments is crucial. All personnel involved in marine operations must be briefed on any changes before they are enacted. This briefing will be conducted by the site supervisor, who will ensure that all team members understand the revised procedures and any new risks introduced. Documentation of amendments will be maintained in a centralised log, accessible to all relevant parties. This log will include details of the amendment, the rationale behind it, and the date of authorisation. It is imperative that this log is kept up-to-date to ensure compliance and facilitate audits. In the event of an emergency or unforeseen circumstance requiring immediate procedural changes, temporary amendments may be authorised by the site supervisor. These must be documented and reviewed by the project manager and health and safety advisor at the earliest opportunity to ensure ongoing compliance and safety.
Who might be harmed:
Boat operators | Crew members | Maintenance personnel
Type of harm:
Asphyxia | Respiratory damage / Asthma / COPD | Illness | Death
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Boat operators | Maintenance personnel
Type of harm:
Illness | Death
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Boat operators | Maintenance personnel | Deckhands
Type of harm:
Eye Damage
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Boat operators | Maintenance personnel | Refuelling staff
Type of harm:
Dermatitis
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Boat operators | Maintenance personnel
Type of harm:
Respiratory damage / Asthma / COPD
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Boat operators | Maintenance personnel
Type of harm:
Illness | Death
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Boat operators | Maintenance personnel
Type of harm:
Eye Damage
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Boat operators | Maintenance personnel | Deckhands | Marine engineers
Type of harm:
Dermatitis
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Inhalation of hydraulic fluid is unlikely to harm any groups.
Type of harm:
Asphyxia | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Boat operators | Maintenance personnel
Type of harm:
Illness | Death
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Maintenance personnel
Type of harm:
Severe tissue damage | Infection | Necrosis
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Boat operators | Maintenance personnel | Deckhands
Type of harm:
Eye Damage
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Boat operators | Maintenance personnel | Deckhands
Type of harm:
Dermatitis
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Marine operations personnel | Maintenance workers | Boat crew members
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Asphyxia | Death | Illness | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Boat operators | Maintenance personnel | Cleaning staff
Type of harm:
Eye Damage
Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Marine operations personnel | Maintenance workers | Boat crew members | Cleaning staff
Type of harm:
Dermatitis
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.Site Specific Hazards
Drowning : Low (1)
Slips, trips, and falls : Low (1)
Equipment failure : Low (1)
Adverse weather conditions : Low (1)
Collision with other vessels : Low (1)
Hypothermia : Low (1)
Manual handling injuries : Low (1)
Entrapment : Low (1)
Fatigue : Low (1)
Poor visibility : Low (1)
Procedures
Personnel and competence
Site inductions and training
Access and egress arrangements
Welfare
Special permits
A specific permit is required for the launch and recovery of the Rigid Inflatable Boat (RIB). This permit ensures that all safety checks are completed, including verification of weather conditions, tide levels, and the operational status of launching equipment. The permit must be signed off by the designated Marine Safety Officer.
A permit is mandatory for conducting man overboard drills or procedures. This ensures that all personnel are briefed on the emergency protocol, communication systems are tested, and rescue equipment is readily available and functional. The permit must be authorised by the Safety Coordinator.
Prior to executing a casualty recovery procedure, a permit must be obtained. This includes a detailed risk assessment of the recovery area, confirmation of the availability of medical support, and verification that all recovery equipment is in optimal condition. The permit must be approved by the Health and Safety Manager.Tools and equipment
Services and isolations
Hazardous substances
Deliveries and materials handling
PPE
All operatives must wear approved life jackets at all times when on or near water. Life jackets must be checked for buoyancy and integrity before each use. It is imperative that they are fastened securely and fit correctly to the individual.
Non-slip, waterproof footwear is mandatory to prevent slips and falls on wet surfaces. Footwear should provide adequate ancle support and be resistant to saltwater corrosion.
In cold weather conditions, thermal protective clothing must be worn to prevent hypothermia. This includes insulated, waterproof outer layers and thermal undergarments.
Hard hats with chin straps are required during operations where there is a risk of falling objects or head injury, particularly during the launch and recovery of the RIB.
Waterproof gloves with good grip are essential for handling ropes and equipment, reducing the risk of rope burns and improving manual dexterity in wet conditions.
Safety goggles or glasses should be worn to protect against spray, debris, and UV exposure, especially during high-speed operations on the RIB.
Personnel must carry waterproof communication devices to maintain contact with the team and emergency services. These devices should be securely attached to the life jacket or clothing.
All PPE must be inspected prior to each operation for signs of wear or damage. Any defective equipment must be replaced immediately. Regular maintenance checks should be documented to ensure ongoing compliance and safety.Emergency procedures
Upon identification of an emergency, such as a man overboard or a casualty situation, the designated emergency signal shall be activated immediately. This signal will alert all personnel on site to the emergency situation.
All personnel must be equipped with waterproof communication devices to ensure constant contact with both onshore and offshore teams. Regular radio checks should be conducted to confirm operational status.
Ensure that all emergency equipment, including lifebuoys, first aid kits, and communication devices, are readily accessible and in good working condition prior to commencing operations.
Regular emergency drills must be conducted to ensure all personnel are familiar with procedures and can respond effectively in an actual emergency. Attendance at these drills is mandatory for all team members involved in marine operations.
Following any emergency incident, a debriefing session shall be conducted to review the response and identify any areas for improvement. This review will contribute to ongoing safety enhancements for future operations.Safety of public and occupiers
Asbestos
All identified ACMs should be clearly marked and recorded in an asbestos register, which must be readily accessible to all personnel involved in the operations. The risk assessment should evaluate the condition of the ACMs and determine the likelihood of disturbance during the marine activities.
If ACMs are present and may be disturbed during operations, appropriate control measures must be implemented. This includes encapsulation or sealing of the materials to prevent fibre release. Personnel must be briefed on the location and condition of ACMs and instructed to avoid any activities that could disturb these materials.
All personnel involved in the operations must receive asbestos awareness training. This training should cover the identification of ACMs, potential health risks, and emergency procedures in case of accidental disturbance. Appropriate personal protective equipment (PPE), such as disposable overalls and respiratory protective equipment (RPE), must be provided and worn when working in proximity to ACMs.
In the event of accidental disturbance of ACMs, operations must cease immediately, and the area should be evacuated. The incident must be reported to the site supervisor, and a licenced asbestos removal contractor should be engaged to assess and remediate the situation. Personnel should follow decontamination procedures to prevent asbestos fibre spread.
Regular monitoring of ACMs should be conducted to ensure their condition remains stable and does not pose a risk during operations. The asbestos management plan should be reviewed periodically and updated as necessary to reflect any changes in the operational environment or condition of ACMs.Monitoring
Waste management
Environmental considerations
Near neighbours and nuisance
Occupational health
Personnel must maintain adequate hydration levels, especially during prolonged operations at sea. Access to potable water must be ensured on all vessels. Additionally, appropriate nutritional provisions should be available to sustain energy levels throughout the operations.
Given the potential for extended hours and physically demanding tasks, a structured rota system must be implemented to manage work hours effectively. Adequate rest periods must be scheduled to prevent fatigue, which could compromise safety and performance.
Personnel susceptible to motion sickness should be identified during the health assessment. Preventative measures, such as anti-motion sickness medication, should be made available, and individuals should be encouraged to report symptoms promptly.
Protective measures against exposure to harsh weather conditions, including UV radiation, wind, and cold temperatures, must be enforced. Personnel should be equipped with appropriate clothing and sun protection. Regular breaks in sheltered areas should be scheduled to mitigate exposure risks.
Operations involving RIBs may expose personnel to significant noise and vibration levels. Hearing protection must be provided and worn as necessary. Equipment maintenance schedules should include checks to minimise excessive vibration.
Tasks involving the launch and recovery of RIBs require careful attention to manual handling techniques. Personnel must receive training in safe lifting practises, and mechanical aids should be utilised where possible to reduce the risk of musculoskeletal injuries.
The nature of marine operations can be stressful, particularly during emergency procedures. Support mechanisms, such as access to counselling services or mental health first aiders, should be in place to support personnel’s psychological well-being.Amendments and authorisation
Activities
Preparation and Setup
Equipment Inspection and Maintenance
Launch of Rigid Inflatable Boat (RIB)
Navigation and Operation of RIB
Man Overboard Procedure
Casualty Recovery Procedure
Recovery of Rigid Inflatable Boat (RIB)
Post-Operation Equipment Check
Cleaning and Maintenance of Equipment
Site Clean-Up and Demobilisation
Hazardous Substances
Fuel (Petrol/Diesel)
Fuel (petrol or diesel) is utilised to power the engine of the Rigid Inflatable Boat (RIB) during marine and maritime operations.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Engine oil
Engine oil is utilised to lubricate the moving parts of the Rigid Inflatable Boat's engine, ensuring efficient operation and preventing wear and tear.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Hydraulic fluid
Hydraulic fluid is utilised to operate and control the hydraulic systems of the Rigid Inflatable Boat (RIB), ensuring efficient and responsive manoeuvrability.
Inhalation : Low (1)
Ingestion : Low (1)
Injection : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Cleaning solvents
Cleaning solvents are intended for the removal of grease, oil, and other contaminants from the surfaces of marine equipment and vessels to ensure proper maintenance and functionality.
Inhalation : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Induction Record
Company name:
Project title:
Location:
Contract No:
Subject:
Method Statement : Marine and Maritime Operations
Tutor:
Date:
Signature:
Name Comments Signature Date