Risk Assessment and Method Statement Template for Removal of Audio Visual Cabling
This document should not be used until it has been thoroughly reviewed by a competent person.
| Company name: | |
| Project title: | |
| Location: | |
| Contract No: | |
| Author: | |
| Reviewed by: | |
| Date: | |
| Signature: |
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
RAMS : Removal of Audio Visual Cabling
Site Specific Instructions
Initial Survey
Conduct a thorough survey of the site to identify the location of all audio visual cabling. Ensure that all relevant drawings and schematics are reviewed. Hazard: Incomplete survey may lead to missed cabling, resulting in potential damage or safety risks.Decommissioning
Safely decommission the cabling by disconnecting it from all power sources and equipment. Verify that all systems are powered down and isolated. Hazard: Risk of electric shock if cabling is not properly de-energised.Accessing Work Areas
Use appropriate access equipment such as step ladders or tower scaffolds to reach ceiling voids, walls, and service ducts. Ensure that all equipment is inspected and fit for use. Hazard: Falls from height due to improper use or faulty equipment.Removal of Cabling
Carefully remove the cabling from its installed locations, ensuring minimal disturbance to surrounding structures. Use appropriate tools and techniques to avoid damage. Hazard: Manual handling injuries from awkward postures or excessive force.Disposal of Cabling
Collect and dispose of removed cabling in accordance with relevant waste management regulations. Ensure that all waste is segregated and transported to designated disposal facilities. Hazard: Environmental harm if waste is not disposed of correctly.Site Clean-Up
Conduct a final inspection to ensure all cabling has been removed and the site is left in a tidy condition. Address any remaining hazards or debris. Hazard: Slips, trips, and falls due to leftover materials or debris.Documentation and Reporting
Complete all necessary documentation, including risk assessments and method statements, and report any incidents or near misses. Hazard: Non-compliance with legal requirements if documentation is incomplete or inaccurate.
Site Specific Hazards
Working at height : Low (1)
Who might be harmed: Installation technicians | Site supervisors | Other contractors on site
Type of harm: Broken Bones | Death | Head Injury | Multiple / Various Injury
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Installation technicians | Maintenance staff | Contractors
Type of harm:
Back / Spinal Injury | Broken Bones | Cuts and Abrasions | Muscular Injury
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | Electricians | Maintenance staff
Type of harm:
Burns | Death | Electrocution
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | School staff | Office employees | Maintenance personnel
Type of harm:
Back / Spinal Injury | Broken Bones | Cuts and Abrasions | Death | Head Injury | Muscular Injury
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Installation technicians | Maintenance personnel | Subcontractors
Type of harm:
Asphyxia | Crush / Entrapment | Death | Drowning | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | School staff | Office employees | Students | Cleaning personnel
Type of harm:
Cuts and Abrasions | Eye Damage | Respiratory damage / Asthma / COPD
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Installation technicians | Maintenance personnel | Cleaning staff
Type of harm:
Cuts and Abrasions | Eye Damage
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | School staff | Office employees
Type of harm:
Permanent Hearing Damage
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
All personnel involved in the removal of audio visual cabling must possess the requisite skills and experience pertinent to the task. Competence is to be verified through the following procedures: Qualifications and Experience: All operatives must hold relevant qualifications in electrical or data cabling work. Experience in working within educational and office environments is essential, with a minimum of two years’ experience in similar projects. Training: Personnel must have completed training in safe working at height, including the use of step ladders and tower scaffolds. Additionally, training in manual handling specific to cabling tasks is required. Induction: A site-specific induction will be conducted for all personnel, highlighting the unique risks associated with working in ceiling voids, walls, and service ducts. This induction will also cover emergency procedures and site-specific safety protocols. Verification: Competence will be verified by the project supervisor prior to commencement of work. This includes checking certification and conducting a brief assessment of understanding regarding the task-specific risks and controls. Supervision: A competent supervisor with experience in audio visual cabling removal will oversee all activities to ensure adherence to safety procedures and quality standards. Continuous Assessment: Ongoing assessment of competence will be conducted throughout the project duration, with any identified gaps addressed through additional training or supervision as necessary. By adhering to these procedures, the project ensures that all personnel are adequately prepared and competent to safely execute the removal of audio visual cabling. All personnel involved in the removal of audio visual cabling must undergo a comprehensive site induction prior to commencing work. This induction will cover the specific risks associated with working in educational and office environments, including the presence of students, staff, and sensitive equipment. Key Points: Identification of Hazards: The induction will highlight potential hazards such as working at height, confined spaces within ceiling voids, and the presence of existing electrical services. Work at Height Training: Personnel required to work on step ladders or tower scaffolds must have completed appropriate work at height training. Verification of training certificates will be conducted during the induction process. Safe Handling of Cabling: Training will include safe techniques for decommissioning and removing cabling from ceiling voids, walls, and service ducts to prevent damage to existing infrastructure. Emergency Procedures: Specific emergency procedures relevant to the site, including evacuation routes and assembly points, will be communicated. Emphasis will be placed on maintaining clear access for emergency services. Communication Protocols: Clear communication protocols must be established, particularly when working in occupied areas, to minimise disruption and ensure safety. Waste Disposal Training: Personnel will be instructed on the correct procedures for disposing of removed cabling in accordance with environmental regulations and site-specific waste management plans. Attendance at the induction is mandatory, and records of attendance will be maintained. Refresher training sessions will be scheduled as necessary to address any changes in site conditions or procedures. Access to the work areas will be controlled to ensure safety and efficiency during the removal of audio visual cabling. Entry and exit points will be clearly marked and kept unobstructed at all times. Personnel will use designated routes to minimise disruption and maintain safety. Step ladders and tower scaffolds will be employed for work at height, ensuring they are positioned on stable ground and inspected prior to use. Only trained and authorised personnel will operate these access equipment. When using tower scaffolds, the wheels must be locked during use, and the scaffold must not be moved while occupied. Ceiling voids, walls, and service ducts will be accessed with caution. Before entry, a thorough inspection will be conducted to identify any potential hazards such as loose fittings or obstructions. Access panels will be securely replaced after work is completed to maintain the integrity of the structure. In areas where cabling runs through confined spaces, appropriate measures will be taken to ensure safe access, including the use of suitable lighting and ventilation. Personnel will adhere to confined space entry procedures, including the use of a buddy system where necessary. Emergency egress routes will be identified and communicated to all personnel during site inductions. These routes must remain clear at all times to ensure swift evacuation if required. Regular checks will be conducted to ensure compliance with these arrangements. All personnel must sign in and out of the site daily to maintain an accurate record of those present, facilitating effective management of access and egress throughout the project duration. All personnel involved in the removal of audio visual cabling shall have access to adequate welfare facilities throughout the duration of the project. Welfare provisions must be established prior to commencement of work and maintained to a high standard. Rest areas shall be provided, ensuring they are clean, dry, and equipped with seating and tables. These areas must be located away from the work zones to prevent exposure to dust and noise generated during cabling removal activities. Sanitary conveniences must be readily accessible, with facilities for washing hands, including hot and cold running water, soap, and towels or hand dryers. These facilities should be checked regularly to ensure cleanliness and availability of supplies. Drinking water must be available on site, clearly marked, and easily accessible to all workers. It is imperative that workers remain hydrated, especially when working in ceiling voids or confined spaces where temperatures may rise. Changing facilities should be provided if workers are required to change into specific work attire or PPE. These facilities must offer privacy and security for personal belongings. First aid provisions must be in place, with a suitably stocked first aid kit and a trained first aider present on site at all times. The location of first aid facilities should be clearly communicated to all personnel during site inductions. Regular welfare inspections shall be conducted to ensure compliance with health and safety standards, addressing any issues promptly to maintain a safe and comfortable working environment for all operatives involved in the cabling removal process. Prior to commencing the removal of audio visual cabling, it is imperative that all necessary special permits are obtained and adhered to. The following procedures must be strictly followed: Permit to Work: A Permit to Work must be secured for any activities involving work at height, particularly when using step ladders or tower scaffolds. This permit ensures that all safety measures are in place and that the personnel involved are competent and trained for such tasks. Electrical Isolation Permit: Before decommissioning and removing cabling, an Electrical Isolation Permit must be obtained. This ensures that all electrical systems are safely isolated to prevent accidental energisation during the removal process. Access Permit for Ceiling Voids and Service Ducts: When accessing ceiling voids, walls, and service ducts, an Access Permit is required. This permit confirms that the areas have been assessed for safety hazards, such as asbestos or other hazardous materials, and that appropriate control measures are in place. Hot Works Permit: If any cutting or soldering is required during the removal process, a Hot Works Permit must be obtained. This permit ensures that fire safety precautions are implemented, including the availability of fire extinguishers and fire watch personnel. Confined Space Permit: In instances where cabling is located in confined spaces, a Confined Space Permit is mandatory. This permit ensures that all necessary precautions are taken to safeguard against risks such as limited oxygen levels or the presence of toxic gases. All permits must be reviewed and authorised by the site manager or designated health and safety officer before work commences. Compliance with these permits is essential to ensure the safety of all personnel involved in the project. All tools and equipment utilised for the removal of audio visual cabling must be fit for purpose and maintained in accordance with the manufacturer’s instructions. Prior to commencement of work, a thorough inspection of all tools and equipment shall be conducted to ensure they are in good working order. Step ladders and tower scaffolds will be employed for accessing ceiling voids and elevated areas. These must be inspected before use each day, ensuring stability and suitability for the task. Only trained personnel shall erect and dismantle tower scaffolds, adhering strictly to the manufacturer’s guidelines. Cable pulling tools, such as fish tapes or rods, shall be used to navigate cabling through walls and service ducts. These tools must be checked for integrity to prevent breakage or snagging during operation. Decommissioning tools, including wire cutters and screwdrivers, must be insulated where necessary to prevent electrical hazards. All decommissioning activities shall be performed with the power supply isolated, verified by a competent person. Personal protective equipment (PPE), including gloves and safety glasses, must be worn when handling tools to protect against cuts and debris. All personnel must be trained in the correct use of tools and equipment specific to audio visual cabling removal, with records of training maintained on site. Any defective tools or equipment must be reported immediately and removed from service until repaired or replaced. Prior to commencing the removal of audio visual cabling, a comprehensive survey of the existing cabling infrastructure must be conducted. This survey will identify all active and inactive cables, ensuring that only the appropriate cabling is targeted for decommissioning and removal. Decommissioning Process: Isolation of Power Supply: All power supplies to the audio visual equipment and associated cabling must be isolated. This includes disconnecting power at the source and ensuring that any backup power systems are also disabled. Verification of isolation should be confirmed using appropriate testing equipment. Tagging and Labelling: Clearly label all isolated circuits and equipment with appropriate signage to prevent accidental re-energisation during the removal process. Tags should indicate the date of isolation and the personnel responsible. Communication with Stakeholders: Inform all relevant stakeholders, including school or office management, of the planned isolation and decommissioning activities. Ensure that any potential disruptions to services are communicated in advance. Verification of Isolation: Prior to commencing physical removal, conduct a secondary verification to ensure all services are properly isolated. This should be performed by a competent person using suitable testing devices. Removal Process: Post-Removal Checks: Documentation: All personnel involved in the removal of audio visual cabling must be aware of the potential presence of hazardous substances, particularly asbestos and lead-based paints, which may be encountered in older buildings such as schools and offices. Asbestos: Prior to commencing work, a thorough asbestos survey must be conducted to identify any asbestos-containing materials (ACMs) within ceiling voids, walls, and service ducts. If ACMs are identified, work must cease immediately, and a licenced asbestos removal contractor must be engaged to manage and remove the material in accordance with the Control of Asbestos Regulations 2012. Personnel must not disturb any suspected ACMs. Lead-based Paints: In buildings where lead-based paints may be present, appropriate measures must be taken to prevent inhalation or ingestion of lead dust. This includes using wet methods to minimise dust generation and ensuring that all personnel wear suitable respiratory protective equipment (RPE) and personal protective equipment (PPE) as necessary. Cable Insulation: Some older cabling may contain hazardous materials such as polychlorinated biphenyls (PCBs) or other harmful substances. Personnel must handle all cabling with care, using gloves and other appropriate PPE to prevent skin contact. Any suspect materials should be tested and disposed of in accordance with hazardous waste regulations. All hazardous substances identified during the project must be documented, and appropriate disposal procedures must be followed. Waste transfer notes should be retained for all hazardous waste removed from the site. All deliveries of equipment and materials required for the removal of audio visual cabling shall be scheduled to minimise disruption to school and office operations. Delivery vehicles must adhere to designated routes and park in pre-approved areas to ensure safety and accessibility. Upon arrival, all materials shall be inspected for damage and verified against delivery notes. Any discrepancies must be reported immediately to the project manager. Materials shall be stored in a secure, designated area, ensuring they do not obstruct walkways or emergency exits. Manual handling of cabling and associated equipment must be conducted in accordance with manual handling regulations. Wherever possible, mechanical aids should be utilised to reduce the risk of injury. Personnel involved in handling tasks must have received appropriate training. During the removal process, care must be taken to avoid damage to existing infrastructure. Cabling must be carefully extracted from ceiling voids, walls, and service ducts using appropriate tools to prevent unnecessary strain or damage. All removed cabling and materials shall be transported to the waste disposal area using suitable containers or trolleys. Waste must be segregated and disposed of in accordance with environmental regulations, ensuring that recyclable materials are processed appropriately. All personnel involved in the removal of audio visual cabling must adhere to the following Personal Protective Equipment (PPE) requirements to ensure safety and compliance with health and safety regulations: Hard Hats: Must be worn at all times to protect against potential head injuries from overhead work, particularly when accessing ceiling voids and service ducts. Safety Glasses: Required to shield eyes from dust and debris during the decommissioning and removal process, especially when working in confined spaces such as ceiling voids and walls. Gloves: Cut-resistant gloves must be worn to protect hands from sharp edges and potential electrical hazards when handling cabling and tools. High-Visibility Clothing: Essential for ensuring visibility of workers, particularly in areas where there is vehicular or pedestrian traffic, such as school corridors or office environments. Safety Footwear: Steel-toe boots are mandatory to protect feet from falling objects and provide stability when working on step ladders or tower scaffolds. Hearing Protection: To be used if noise levels exceed safe limits during the use of power tools or equipment for decommissioning tasks. Respiratory Protection: Dust masks or respirators must be worn when working in dusty environments, such as ceiling voids, to prevent inhalation of harmful particles. All PPE must be inspected prior to use to ensure it is in good condition and fit for purpose. Any damaged or defective PPE must be replaced immediately. Compliance with these procedures is mandatory, and any deviations must be reported to the site supervisor. In the event of an emergency during the removal of audio visual cabling, all personnel must adhere to the following procedures: Immediate Response: Upon identifying an emergency, such as a fire, injury, or structural hazard, the individual must immediately cease all work activities and alert nearby colleagues. Raising the Alarm: Activate the nearest fire alarm call point if a fire is detected. For other emergencies, promptly notify the site manager or designated safety officer using the site communication system. Evacuation: Personnel working at height on step ladders or tower scaffolds must safely descend and proceed to the designated assembly point. Ensure that all tools and equipment are left in a secure state to prevent hazards during evacuation. Ceiling Voids and Service Ducts: Workers within ceiling voids or service ducts must exit these confined spaces immediately, ensuring that no cabling or equipment obstructs egress routes. First Aid: In case of injury, administer first aid only if it is safe to do so. First aid kits are located at strategic points on site, and trained first aiders should be contacted immediately. Communication: Maintain clear communication with the site manager and emergency services, providing details of the incident, location, and any individuals involved. Re-entry Protocol: Re-entry to the site is strictly prohibited until clearance is given by the site manager or emergency services, ensuring that all hazards have been addressed and it is safe to resume work. Documentation: Following an emergency, a detailed report must be completed by the site manager, documenting the incident, response actions taken, and any lessons learned to prevent future occurrences. All personnel must be familiar with these procedures and participate in regular emergency drills to ensure preparedness. The safety of the public and occupiers during the removal of audio visual cabling is of paramount importance. Access to work areas will be strictly controlled to prevent unauthorised entry. Clear and visible signage will be placed at all entry points to inform and warn individuals of the ongoing works. Barriers and physical segregation will be employed to delineate work zones, particularly in areas where cabling is being removed from ceiling voids, walls, and service ducts. This will ensure that the public and occupiers are kept at a safe distance from potential hazards. Work at height, such as on step ladders or tower scaffolds, will be conducted with utmost care. These activities will be scheduled during times of low occupancy, such as after school hours or during office closures, to minimise interaction with the public and building occupants. Prior to commencing work, a thorough survey will be conducted to identify any potential risks to the public and occupiers. This includes ensuring that all cabling decommissioning is completed safely, with no live wires exposed. Communication with building management will be maintained throughout the project to coordinate activities and address any concerns regarding public safety. In the event of an emergency, clear evacuation routes will be established and communicated to all relevant parties. All personnel involved in the project will be briefed on the specific procedures for maintaining the safety of the public and occupiers, ensuring that these measures are adhered to at all times. All personnel involved in the removal of audio visual cabling must be asbestos aware and have received appropriate training. Prior to commencing work, a refurbishment and demolition asbestos survey must be conducted to identify any asbestos-containing materials (ACMs) within the ceiling voids, walls, and service ducts where cabling is present. In the event that ACMs are identified, work must cease immediately, and a licenced asbestos removal contractor should be engaged to manage the safe removal or encapsulation of the asbestos. The area must be clearly marked and access restricted until the ACMs have been appropriately managed. During the survey and decommissioning phases, operatives must exercise caution and avoid disturbing any materials that may potentially contain asbestos. Visual inspections should be conducted regularly to ensure no inadvertent disturbance of ACMs occurs. If any suspect materials are encountered during the removal process, work must stop, and the site supervisor should be notified at once. The suspect material should be left undisturbed, and a qualified asbestos consultant should be contacted to assess the situation. All waste generated from the removal of audio visual cabling must be handled in accordance with asbestos waste management regulations, ensuring that any contaminated materials are disposed of at a licenced facility. Documentation of waste disposal must be maintained for compliance purposes. Regular monitoring and audits should be conducted throughout the project to ensure adherence to all asbestos-related procedures and to safeguard the health and safety of all personnel involved. The monitoring of the removal of audio visual cabling shall be conducted with a focus on ensuring compliance with health and safety standards and the effective execution of the task. Daily inspections will be carried out by the site supervisor to verify that all personnel adhere to the method statement and risk assessments. Particular attention shall be given to the use of step ladders and tower scaffolds, ensuring they are correctly assembled and used safely. Regular checks will be made to confirm that all electrical systems have been properly decommissioned before any removal work begins. This includes verifying that all power sources are isolated and locked off, with appropriate signage displayed. Monitoring of work at height will involve ensuring that operatives are using the correct personal protective equipment (PPE) and that fall protection measures are in place. The condition of access equipment, such as step ladders and tower scaffolds, will be assessed before use each day. The site supervisor will also conduct spot checks to ensure that cabling is being removed in accordance with the planned sequence, particularly in ceiling voids, walls, and service ducts, to prevent any structural damage or disruption to existing services. Waste management practises will be monitored to ensure that all removed cabling is disposed of in accordance with environmental regulations and site-specific waste management plans. This includes verifying that waste is segregated and stored in designated areas before removal from site. All findings from monitoring activities will be documented in a daily log, with any non-compliance or issues promptly addressed through corrective actions. Regular toolbox talks will be conducted to reinforce safe working practises and address any emerging risks identified during monitoring activities. All waste generated from the removal of audio visual cabling shall be managed in accordance with the Waste Management Plan. Cabling waste, including any associated materials such as connectors and brackets, shall be segregated at the point of removal to facilitate recycling and proper disposal. Decommissioned cabling must be carefully coiled and placed into designated containers to prevent tangling and ensure ease of handling. Containers shall be clearly labelled to distinguish between recyclable materials and general waste. Recyclable materials, such as copper and aluminium from cabling, shall be separated and stored in appropriate recycling bins. These materials will be collected by a licenced waste carrier for recycling at an authorised facility. Non-recyclable waste, including any damaged or obsolete components, shall be disposed of in accordance with local authority regulations. This waste will be transported to a licenced waste disposal site. All personnel involved in the removal process must be briefed on the waste management procedures during the site induction. Regular audits will be conducted to ensure compliance with the waste management protocols and to identify opportunities for improvement. Documentation of all waste transfers, including waste transfer notes and consignment notes, shall be maintained on site for inspection and record-keeping purposes. The removal of audio visual cabling in schools, offices, and similar environments necessitates careful consideration of environmental impacts. All waste materials, including cabling and associated components, must be segregated and disposed of responsibly. This includes ensuring that any cabling containing hazardous substances is identified and handled in accordance with relevant waste regulations. Noise and dust generation should be minimised during the removal process. Use of hand tools over power tools is preferred where feasible to reduce noise pollution. Dust sheets or similar protective measures should be employed to prevent the spread of dust, particularly when accessing ceiling voids or service ducts. Energy efficiency should be considered during decommissioning. Any equipment that can be repurposed or reused should be identified and set aside for potential future use, reducing waste and conserving resources. Transport of waste materials should be planned to minimise vehicle movements, thereby reducing carbon emissions. Where possible, use local recycling facilities to further decrease the environmental footprint. Finally, ensure that all personnel are aware of the environmental procedures and their responsibilities in maintaining compliance with environmental standards throughout the project. The removal of audio visual cabling in schools, offices, and similar environments necessitates careful consideration of the impact on near neighbours and the potential for nuisance. Communication with adjacent occupants is paramount. Prior to commencement, a detailed schedule of works shall be disseminated to all relevant parties, outlining the expected duration and nature of activities. Noise control measures must be implemented to minimise disruption. This includes the use of hand tools where feasible and ensuring that any power tools are equipped with noise-reducing features. Work should be scheduled during times that are least disruptive to the building’s occupants, avoiding peak hours such as school start and end times or office rush hours. Dust and debris management is critical. All ceiling voids, walls, and service ducts should be accessed with care to prevent unnecessary disturbance. Dust sheets and barriers must be employed to contain any debris, and regular cleaning should be conducted to maintain a tidy work environment. Access routes for personnel and equipment must be clearly defined and communicated to avoid interference with the daily operations of the premises. This includes ensuring that all pathways are kept clear and that any temporary obstructions are promptly removed. In the event of any unforeseen issues that may cause disturbance, such as unexpected noise or access requirements, immediate notification to the affected parties is required, along with a proposed resolution plan. By adhering to these procedures, the project aims to minimise any potential nuisance to near neighbours while ensuring a smooth and efficient removal process. The removal of audio visual cabling in schools, offices, and similar environments necessitates specific attention to occupational health to ensure the well-being of all personnel involved. Manual Handling: Personnel must be trained in proper manual handling techniques to prevent musculoskeletal injuries when lifting, carrying, or pulling cabling. This includes assessing the weight and length of cables before handling and using appropriate lifting aids where necessary. Work at Height: When working from step ladders or tower scaffolds, operatives must adhere to safe working practises to prevent falls. This includes ensuring equipment is stable and correctly positioned, maintaining three points of contact on ladders, and using guardrails on scaffolds. Dust and Fibre Exposure: During the removal of cabling from ceiling voids, walls, and service ducts, there is a potential for exposure to dust and fibres. Personnel must wear appropriate respiratory protective equipment (RPE) and ensure that work areas are adequately ventilated. Noise Levels: The use of tools for decommissioning may generate noise. Personnel should be provided with hearing protection if noise levels exceed safe thresholds, and noise assessments should be conducted as part of the initial survey. Electrical Safety: Prior to decommissioning, all cabling must be isolated from the power supply to prevent electrical hazards. Verification of isolation should be conducted using appropriate testing equipment. Repetitive Strain Injuries (RSI): Tasks involving repetitive movements, such as pulling or coiling cables, should be rotated among team members to minimise the risk of RSI. Regular breaks should be scheduled to allow for rest and recovery. Mental Well-being: Working in confined spaces such as ceiling voids and service ducts can be stressful. It is important to monitor the mental well-being of personnel and provide support where necessary. Encourage open communication and provide access to mental health resources. By adhering to these procedures, the project aims to safeguard the occupational health of all personnel involved in the removal of audio visual cabling. All amendments to the method statement for the removal of audio visual cabling must be authorised by the Project Manager prior to implementation. Any proposed changes should be documented in writing and submitted for review. The Project Manager will assess the impact of the amendments on health and safety, ensuring compliance with relevant legislation and standards. Communication of Amendments: Once authorised, all amendments must be communicated to the site team during a toolbox talk. This ensures that all personnel involved in the task are fully aware of any changes to procedures or safety measures. Documentation: A record of all amendments, including the date, nature of the change, and authorisation details, must be maintained on site. This documentation should be readily accessible for inspection by health and safety officers or other relevant parties. Review Process: The Project Manager will conduct a review of the amended procedures to ensure they are effectively implemented and do not compromise safety. This review will include feedback from operatives working at height or in confined spaces such as ceiling voids and service ducts. Emergency Procedures: Any amendments affecting emergency procedures, particularly those involving work at height or in restricted areas, must be clearly highlighted and communicated to all personnel. This includes ensuring that all operatives are aware of updated evacuation routes or emergency contacts. Final Authorisation: The final authorisation of any amendments rests with the Health and Safety Advisor, who will ensure that all changes align with the overarching safety strategy for the project.
Who might be harmed:
Construction workers | Maintenance staff
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Respiratory damage / Asthma / COPD
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | Maintenance staff
Type of harm:
Eye Damage
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | Maintenance staff
Type of harm:
Dermatitis
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers removing cabling | Maintenance staff
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Respiratory damage / Asthma / COPD
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Workers removing the cabling | Other tradespeople working in the vicinity
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Workers removing the cabling | Maintenance staff
Type of harm:
Illness | Death
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Workers removing audio visual cabling
Type of harm:
Eye Damage
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Workers removing audio visual cabling
Type of harm:
Dermatitis
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
Manual handling : Low (1)
Electrical hazards : Low (1)
Slips, trips, and falls : Low (1)
Confined spaces : Low (1)
Dust and debris : Low (1)
Sharp objects : Low (1)
Noise : Low (1)
Procedures
Personnel and competence
Site inductions and training
Access and egress arrangements
Welfare
Special permits
Tools and equipment
Services and isolations
Hazardous substances
Deliveries and materials handling
PPE
Emergency procedures
Safety of public and occupiers
Asbestos
Monitoring
Waste management
Environmental considerations
Near neighbours and nuisance
Occupational health
Amendments and authorisation
Activities
Conduct a site survey and risk assessment.
Decommission audio visual equipment.
Isolate electrical supply to cabling.
Access ceiling voids, walls, and service ducts.
Remove cabling from ceiling voids.
Remove cabling from walls.
Remove cabling from service ducts.
Dispose of removed cabling in accordance with waste regulations.
Conduct a final inspection to ensure all cabling has been removed.
Restore work areas to a safe condition.
Hazardous Substances
Dust from ceiling voids
Dust from ceiling voids is not intended for use; it is a byproduct of construction activities and poses inhalation risks during the removal of audio visual cabling.
Inhalation : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Asbestos (if present)
Asbestos, if present, may have been used for fireproofing, insulation, or soundproofing within ceiling voids, walls, or service ducts.
Inhalation : Low (1)
Lead paint (if present)
Lead paint, if present, may have been used historically for its durability and corrosion resistance on walls, ceilings, or structural elements.
Inhalation : Low (1)
Ingestion : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Induction Record
Company name:
Project title:
Location:
Contract No:
Subject:
Method Statement : Removal of Audio Visual Cabling
Tutor:
Date:
Signature:
Name Comments Signature Date