Risk Assessment and Method Statement Template for Gas Heating Installation
This document should not be used until it has been thoroughly reviewed by a competent person.
| Company name: | |
| Project title: | |
| Location: | |
| Contract No: | |
| Author: | |
| Reviewed by: | |
| Date: | |
| Signature: |
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
RAMS : Gas and Heating Works
Site Specific Instructions
Work Process and Associated Hazards for Gas and Heating Works
Gas Purging
Mechanical Bending of Copper Pipework
Mechanical Bending of Pipework or Conduit
Bending of Pipework or Conduit Using Hand Held Model
Installation of Containment Tray
Installation of Pipework
Gas Connection or Break into Existing Gas Main
Domestic Gas Boiler and System Upgrades and Replacement
Installation of Press Fit Pipework and Fittings
Installation of Heating System
Installation of Associated Fixtures and Fittings
Electrical Heating Controls
Power Flushing of Central Heating System
Test and Commission
Note: All tasks must be performed by qualified personnel with appropriate personal protective equipment (PPE) and adherence to relevant safety regulations. Gas leaks : Low (1) Who might be harmed: Construction workers | Site visitors | Occupants of adjacent properties Type of harm: Asphyxia | Burns | Death | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Fire and explosion : Low (1) Who might be harmed: Construction workers | Site visitors | Occupants of adjacent properties Type of harm: Burns | Death | Eye Damage | Multiple / Various Injury | Smoke Inhalation Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Asphyxiation : Low (1) Who might be harmed: Construction workers | Site visitors | Occupants of adjacent properties | Maintenance personnel Type of harm: Asphyxia | Death | Illness | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Exposure to hazardous substances : Low (1) Who might be harmed: Construction workers | Site supervisors | Subcontractors | Occupants of the building | Maintenance personnel Type of harm: Asbestosis / Lung Cancer / Mesothelioma | Dermatitis | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Manual handling injuries : Low (1) Who might be harmed: Construction workers | Gas engineers | Plumbers | Electricians | Apprentices Type of harm: Back / Spinal Injury | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Muscular Injury Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Slips, trips, and falls : Low (1) Who might be harmed: Construction workers | Site supervisors | Subcontractors Type of harm: Back / Spinal Injury | Broken Bones | Cuts and Abrasions | Death | Head Injury | Muscular Injury | Multiple / Various Injury Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Electric shock : Low (1) Who might be harmed: Construction workers | Electricians | Plumbers | Maintenance personnel Type of harm: Burns | Death | Electrocution Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Burns and scalds : Low (1) Who might be harmed: Construction workers | Gas engineers | Plumbers | Electricians | Apprentices and trainees Type of harm: Burns | Death | Eye Damage | Multiple / Various Injury Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Noise exposure : Low (1) Who might be harmed: Construction workers | Site supervisors | Subcontractors Type of harm: Permanent Hearing Damage Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Confined spaces : Low (1) Who might be harmed: Construction workers | Gas engineers | Heating technicians | Maintenance personnel Type of harm: Asphyxia | Crush / Entrapment | Death | Drowning | Electrocution | Heat Stroke / Exhaustion | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Working at height : Low (1) Who might be harmed: Construction workers | Site supervisors | Subcontractors | Maintenance personnel Type of harm: Broken Bones | Death | Head Injury | Multiple / Various Injury Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
All personnel involved in the gas and heating works must possess the necessary qualifications and competencies to ensure safe and effective execution of tasks. Gas Safe registration is mandatory for all operatives undertaking gas-related activities, including gas purging, connection, and break-ins to existing gas mains. Prior to commencing work, each operative must provide evidence of their Gas Safe registration and relevant experience in similar projects. This documentation will be verified by the site manager. Additionally, operatives must have completed training in mechanical bending of copper pipework and installation of press fit pipework and fittings to ensure proficiency in these specific tasks. For tasks involving domestic gas boiler and system upgrades and replacement, operatives must demonstrate competence in handling both traditional and modern heating systems. This includes familiarity with electrical heating controls and the ability to conduct power flushing of central heating systems. Supervisors are responsible for ensuring that all personnel are briefed on the specific requirements of the project, including any updates to procedures or safety protocols. Regular toolbox talks will be conducted to address any emerging issues and reinforce best practises. In the event of personnel changes, the site manager must be notified immediately to verify the competence of any new operatives before they commence work. This ensures that all personnel maintain the highest standards of safety and quality throughout the duration of the project. All personnel involved in the gas and heating works must undergo a comprehensive site induction prior to commencing any tasks. This induction will cover the specific risks associated with gas purging, mechanical bending of copper pipework, and other related activities. Key Points:
Gas Safety Awareness: Emphasis will be placed on understanding the hazards associated with gas works, including the potential for leaks and the importance of proper ventilation. Personnel will be trained on emergency procedures in the event of a gas leak. Use of Equipment: Training will include the correct use of tools and equipment specific to gas and heating works, such as pipe bending machines and press-fit tools. Personnel must demonstrate competence in handling these tools safely. Permit to Work System: The induction will cover the permit to work system, ensuring that all operatives understand the necessity of obtaining permits before engaging in tasks such as gas connection or breaking into existing gas mains. Electrical Safety: As electrical heating controls are part of the scope, training will include safe working practises around electrical installations, highlighting the risks of electrocution and the importance of isolating electrical supplies. Competency Verification: Only personnel with verified qualifications and experience in gas and heating systems will be permitted to undertake tasks such as domestic gas boiler upgrades and system replacements. Ongoing Training: Refresher training sessions will be scheduled regularly to ensure that all personnel remain up-to-date with the latest safety practises and legislative requirements related to gas and heating works. All training records will be maintained on-site for inspection, ensuring compliance with health and safety regulations. All personnel involved in the gas and heating works shall utilise designated access routes to the work area, ensuring minimal disruption to existing site operations. Access points must be clearly marked and kept free from obstructions at all times to facilitate the safe movement of workers and materials. Egress routes shall be established and maintained to ensure a swift and safe exit in case of an emergency. These routes must be clearly signposted and illuminated, particularly in areas where natural light is insufficient. Prior to commencing work, a thorough inspection of all access and egress points will be conducted to identify any potential hazards specific to gas and heating works, such as the presence of flammable materials or confined spaces. Any identified risks must be mitigated before work begins. During the installation of gas pipework and heating systems, temporary barriers or signage shall be employed to prevent unauthorised access to hazardous areas. This is crucial during tasks such as gas purging and connection to existing gas mains, where the risk of gas leaks is heightened. All workers must be briefed on the specific access and egress arrangements during the site induction, with particular emphasis on the location of emergency exits and assembly points. Regular drills shall be conducted to ensure familiarity with these procedures. In the event of any changes to the site layout or work schedule that may affect access or egress, all personnel must be promptly informed, and the method statement updated accordingly. All personnel involved in the gas and heating works shall have access to adequate welfare facilities throughout the duration of the project. Sanitary conveniences must be provided, including clean and well-maintained toilets with handwashing facilities equipped with hot and cold running water, soap, and drying provisions. Rest areas shall be available for workers to take breaks, ensuring they are shielded from adverse weather conditions. These areas must be kept clean and free from any hazardous materials associated with gas and heating works. Drinking water must be readily accessible to all workers on site, ensuring hydration is maintained during the execution of tasks such as gas purging and installation of heating systems. Given the nature of gas and heating works, first aid facilities must be prominently located and easily accessible. A qualified first aider should be present on site at all times to address any incidents that may arise from handling gas or heating equipment. Changing facilities should be provided for operatives who may need to change out of contaminated clothing, particularly when engaging in tasks such as power flushing of central heating systems or handling hazardous substances. All welfare provisions must comply with the relevant health and safety regulations, ensuring that the specific needs of those engaged in gas and heating works are adequately met. Regular inspections shall be conducted to ensure that these facilities remain in good condition and are fit for purpose throughout the project. All personnel involved in gas and heating works must obtain the necessary Gas Safe Register certification prior to commencing any tasks. This certification ensures that individuals are competent and authorised to work with gas systems. Before any gas purging or connection to existing gas mains, a Permit to Work must be obtained. This permit will be issued by the site manager or designated safety officer and will include: For tasks involving mechanical bending of copper pipework and installation of press fit pipework, a Hot Work Permit is required if any heat-producing equipment is used. This permit will ensure: When conducting power flushing of central heating systems, a Permit for Water Discharge may be necessary if waste water is to be disposed of on-site. This permit will outline: All permits must be reviewed and revalidated daily, or as specified by the site safety protocols, to ensure ongoing compliance with safety standards. All tools and equipment utilised for gas and heating works must be suitable for the task and maintained in good working order. Prior to commencement, a thorough inspection of all tools and equipment shall be conducted to ensure they are free from defects. Any defective items must be immediately removed from service and reported to the site supervisor. For tasks involving gas purging and gas connection or break into existing gas main, only tools specifically designed for gas applications, such as intrinsically safe tools, shall be employed to prevent any risk of ignition. When performing mechanical bending of copper pipework and installation of press fit pipework and fittings, appropriate bending machines and press tools must be used. Operators must be trained and competent in the use of these machines to ensure precision and safety. The use of hand-held models for bending pipework or conduit requires particular attention to manual handling techniques to prevent strain injuries. Operators must ensure that the equipment is used within its specified capacity limits. During the installation of containment trays and associated fixtures and fittings, appropriate hand tools such as spanners, screwdrivers, and levels must be used. Power tools, if required, must be battery-operated to minimise trailing cables and reduce trip hazards. For electrical heating controls, only insulated tools should be used to prevent electrical shock. All electrical equipment must be PAT tested and in compliance with current regulations. Power flushing of central heating systems requires the use of specialised power flushing pumps. Operators must ensure that all connections are secure to prevent leaks and that the system is monitored throughout the process. Finally, all personnel must wear appropriate Personal Protective Equipment (PPE) when operating tools and equipment, including safety goggles, gloves, and hearing protection where necessary. Regular tool box talks shall be conducted to reinforce safe working practises and address any concerns related to tool and equipment use. All gas and heating works shall commence only after a comprehensive assessment of existing services has been conducted. Prior to any intervention, all gas supplies must be identified, labelled, and isolated to prevent accidental discharge or leaks. This includes the use of appropriate lock-off devices and signage to indicate isolation status. For tasks involving gas purging and connection or break into existing gas mains, it is imperative that only qualified Gas Safe registered engineers perform these operations. The isolation of gas services must be verified by a competent person before any work begins. In the case of electrical heating controls, ensure that all electrical circuits are de-energised and locked off in accordance with the Electrical Safety Regulations. Verification of isolation should be documented and confirmed by a qualified electrician. During the installation of new pipework or upgrades to existing systems, ensure that all relevant service drawings are consulted to avoid interference with other utilities. Any discrepancies must be reported immediately to the project manager. Upon completion of works, all services must be reinstated in a controlled manner, ensuring that all connections are secure and leak-free. A thorough inspection and testing of the system should be conducted prior to re-energising any gas or electrical services. Finally, ensure that all personnel involved in the works are briefed on the specific isolation procedures and emergency protocols related to gas and heating systems. All personnel involved in gas and heating works must adhere to the following procedures when handling hazardous substances: Identification and Assessment: Prior to commencing work, a comprehensive assessment of all hazardous substances, including natural gas and any associated chemicals, must be conducted. This includes reviewing Safety Data Sheets (SDS) for each substance. Storage and Handling: All hazardous substances must be stored in accordance with the manufacturer’s guidelines and relevant legislation. Gas cylinders should be secured upright in a well-ventilated area, away from sources of ignition. Use of Personal Protective Equipment (PPE): Appropriate PPE, such as flame-resistant clothing, gloves, and eye protection, must be worn when handling hazardous substances. Respiratory protection should be used if there is a risk of inhaling harmful vapours. Ventilation: Ensure adequate ventilation in areas where gas purging and other activities involving hazardous substances are performed to prevent the accumulation of flammable gases. Spill and Leak Procedures: In the event of a spill or leak, immediately evacuate the area and follow emergency procedures. Use appropriate spill kits to contain and clean up any hazardous substances safely. Disposal: Dispose of all hazardous waste in accordance with local regulations. Ensure that waste containers are clearly labelled and that waste is transported by licenced carriers. Training: All operatives must receive training on the safe handling of hazardous substances specific to gas and heating works, including emergency response procedures. Monitoring: Continuous monitoring for gas leaks using appropriate detection equipment is mandatory during all phases of the project to ensure safety. By adhering to these procedures, the risks associated with hazardous substances in gas and heating works can be effectively managed. All deliveries of materials and equipment for the gas and heating works shall be scheduled to minimise disruption and ensure safety on site. Delivery vehicles must be coordinated with the site manager to ensure they arrive during designated times, avoiding peak hours to reduce congestion and potential hazards. Upon arrival, delivery drivers must report to the site office for induction and instructions. Materials, including copper pipework, containment trays, and gas boilers, shall be offloaded using appropriate mechanical aids such as forklifts or pallet trucks to prevent manual handling injuries. All personnel involved in unloading must wear suitable personal protective equipment (PPE), including gloves and safety boots. Storage of materials must be in designated areas, ensuring that gas-related components are stored separately from other materials to prevent contamination or damage. Copper pipework and fittings should be stored in a dry, secure location to prevent corrosion and theft. When handling materials on site, workers must adhere to manual handling guidelines, using team lifts or mechanical aids where necessary. Special care must be taken with press fit pipework and fittings to avoid damage that could compromise system integrity. For the installation of gas boilers and heating systems, ensure that all components are transported carefully to their installation points, using trolleys or hoists as required. The movement of heavy items such as boilers should be planned in advance, with clear pathways and sufficient manpower. All waste materials generated from packaging or offcuts must be collected and disposed of in accordance with the site’s waste management procedures, ensuring that the work area remains tidy and free from obstructions. All personnel involved in gas and heating works must adhere to the following Personal Protective Equipment (PPE) procedures to ensure safety and compliance with relevant regulations: Flame-Resistant Clothing: Personnel must wear flame-resistant clothing to protect against potential fire hazards during gas purging and connection tasks. Safety Footwear: Steel-toe capped boots are mandatory to protect against heavy objects and potential punctures when handling pipework and equipment. Eye Protection: Safety goggles or face shields must be worn during mechanical bending of copper pipework and when using hand-held models to prevent eye injuries from flying debris or metal shavings. Gloves: Heat-resistant gloves are required when handling hot surfaces, particularly during domestic gas boiler upgrades and replacements, as well as during the installation of heating systems. Hearing Protection: Ear defenders or earplugs should be used when operating power tools or machinery that exceed safe noise levels, especially during the installation of press fit pipework and fittings. Respiratory Protection: When power flushing central heating systems, appropriate respiratory protection must be worn to guard against inhalation of chemical fumes or dust particles. High-Visibility Clothing: High-visibility vests or jackets are essential for all personnel working on-site to ensure they are easily seen by others, particularly during deliveries and material handling. All PPE must be inspected prior to use to ensure it is in good condition and fit for purpose. Any damaged or defective equipment must be reported immediately and replaced. Compliance with these procedures is mandatory, and failure to adhere may result in disciplinary action. In the event of an emergency during gas and heating works, the following procedures must be strictly adhered to: Immediate Evacuation: Upon detection of a gas leak or any other hazardous situation, all personnel must immediately cease work and evacuate the area. Use designated escape routes and muster at the pre-determined assembly point. Gas Leak Protocol: If a gas leak is suspected, do not operate electrical switches or equipment that could ignite the gas. Ensure that all gas valves are closed if it is safe to do so. Emergency Services Notification: Contact emergency services by dialling 999, providing clear details of the incident, including the nature of the emergency, location, and any known hazards. Gas Engineer Contact: Notify the responsible Gas Safe registered engineer immediately to assess and manage the situation. Only qualified personnel should attempt to rectify gas-related issues. First Aid: Administer first aid to any injured persons if it is safe to do so. Ensure that first aiders are aware of potential gas exposure symptoms, such as dizziness or nausea. Fire Safety: In case of fire, activate the nearest fire alarm and use appropriate fire extinguishers only if trained and it is safe to do so. Evacuate immediately if the fire cannot be controlled. Communication: Maintain clear communication with all team members and emergency services throughout the incident. Ensure that all personnel are accounted for at the assembly point. Post-Incident Review: Once the situation is under control, conduct a thorough review to identify causes and implement measures to prevent recurrence. Document findings and update risk assessments accordingly. Adherence to these procedures is crucial to ensure the safety of all personnel involved in gas and heating works. All gas and heating works shall be conducted with the utmost regard for the safety of the public and occupiers. Access to work areas will be strictly controlled to prevent unauthorised entry. Appropriate signage and barriers will be erected to delineate work zones, ensuring that only authorised personnel are present. Gas purging operations will be scheduled during times of minimal occupancy to reduce exposure risks. Occupiers will be informed in advance of any potential disruptions or hazards associated with these activities. During mechanical bending of copper pipework and other pipework, care will be taken to minimise noise and vibration, thereby reducing disturbance to nearby occupiers. All equipment will be maintained in good working order to prevent accidental release of gas or other hazardous substances. For tasks involving gas connection or break into existing gas mains, a detailed risk assessment will be conducted to identify potential hazards to the public. Emergency procedures will be established, and all personnel will be briefed on these protocols prior to commencement. When conducting domestic gas boiler and system upgrades and replacements, occupiers will be advised to vacate the immediate area to avoid exposure to fumes or dust. Adequate ventilation will be ensured throughout the process. Installation of electrical heating controls will be carried out with due consideration for electrical safety, ensuring that all circuits are isolated before work begins. Occupiers will be notified of any temporary loss of power. Finally, test and commission activities will be performed with precision to ensure that all systems are safe and operational before being handed over. Any residual risks will be communicated clearly to the occupiers, along with instructions for safe operation. All personnel involved in gas and heating works must be vigilant for the presence of asbestos-containing materials (ACMs) during the execution of tasks such as gas purging, installation of pipework, and domestic gas boiler upgrades. Prior to commencement, a thorough asbestos survey must be conducted by a competent person to identify any ACMs within the work area. If ACMs are identified, the following procedures must be adhered to: During gas connection or break into existing gas mains, particular attention must be paid to any insulation or lagging materials that may contain asbestos. In the event of accidental disturbance, implement emergency procedures, including evacuation of the area and sealing off to prevent further contamination. Training and Awareness: All operatives must receive asbestos awareness training prior to undertaking any gas and heating works. This training should cover identification of ACMs, emergency procedures, and safe working practises. Documentation: Maintain comprehensive records of all asbestos-related activities, including surveys, risk assessments, removal works, and air monitoring results. These records must be readily available for inspection. By adhering to these procedures, the risk of asbestos exposure during gas and heating works can be effectively managed, ensuring the safety of all personnel involved. The monitoring of gas and heating works shall be conducted with utmost diligence to ensure compliance with safety standards and project specifications. Daily inspections will be carried out by the site supervisor to verify that all gas and heating installations are performed according to the approved method statement and risk assessments. Gas detection equipment must be utilised to continuously monitor for any potential leaks during gas purging, connection, or break-in activities. The equipment should be calibrated and tested prior to use, with records maintained for audit purposes. Pressure testing of pipework and fittings will be conducted at specified intervals to ensure integrity and prevent leaks. Results of these tests must be documented and reviewed by the project manager. Regular audits will be performed by the health and safety advisor to ensure adherence to safety protocols, particularly during high-risk activities such as gas connection or break-in to existing gas mains. Any non-compliance identified must be addressed immediately, with corrective actions documented. Toolbox talks will be held weekly to reinforce safety procedures and address any issues arising from the monitoring activities. Attendance and topics discussed shall be recorded. All monitoring activities must be documented in the site logbook, with any incidents or deviations from the method statement reported promptly to the project manager for further action. All waste generated from the gas and heating works shall be managed in accordance with the Waste Management Plan. Segregation of waste is paramount; therefore, separate containers will be provided for different types of waste, including metal offcuts, insulation materials, and packaging. Metal offcuts from copper and other pipework shall be collected in designated skips for recycling. It is essential that these materials are kept free from contamination to ensure they can be effectively recycled. Insulation materials and any associated debris must be bagged and sealed to prevent the release of fibres or dust. These bags shall be disposed of in accordance with hazardous waste regulations if deemed necessary. Packaging waste, such as cardboard and plastic from new equipment and fittings, shall be flattened and placed in recycling bins. Efforts should be made to minimise packaging waste by coordinating with suppliers to reduce excess packaging. Old boilers and heating systems being replaced must be carefully dismantled and components separated for recycling or disposal. Any hazardous components, such as those containing asbestos or refrigerants, must be handled by qualified personnel and disposed of following specific hazardous waste procedures. Gas purging residues must be captured and disposed of safely, ensuring no release into the environment. Appropriate containers will be used to collect any liquid or gaseous waste resulting from purging activities. Regular inspections will be conducted to ensure compliance with waste management procedures, and records of waste disposal will be maintained for audit purposes. All personnel involved in the works will receive training on the specific waste management procedures relevant to their tasks. All personnel involved in the gas and heating works shall adhere to the following project-specific environmental procedures: Waste Management: All waste materials, including old pipework, boilers, and fittings, must be segregated and disposed of in accordance with local regulations. Particular attention should be given to the disposal of hazardous materials such as asbestos-containing components, which must be handled by licenced professionals. Spill Prevention: During the installation and connection of gas systems, measures must be in place to prevent any gas leaks or spills. This includes the use of appropriate sealing techniques and regular inspection of connections. Any detected leaks must be reported immediately and rectified using approved methods. Noise Control: Mechanical bending and installation activities should be scheduled to minimise noise impact on nearby residents and businesses. Use of noise-dampening equipment and adherence to working hours will help mitigate disturbances. Dust Suppression: Activities such as pipe cutting and installation may generate dust. Dust suppression techniques, such as wet cutting or localised extraction, should be employed to minimise airborne particles. Energy Efficiency: The installation of new heating systems and controls should prioritise energy efficiency. This includes selecting high-efficiency boilers and ensuring that all systems are properly commissioned to operate at optimal performance levels. Water Management: During power flushing of central heating systems, ensure that water usage is monitored and controlled to prevent wastage. Any discharge must comply with environmental regulations to prevent contamination of local watercourses. Material Selection: Where possible, select materials that have a lower environmental impact, such as recyclable copper pipework and fittings. This consideration should extend to all associated fixtures and fittings used in the project. Transportation: Plan deliveries to minimise vehicle movements and reduce emissions. Encourage the use of low-emission vehicles for transportation of materials and personnel to the site. By adhering to these procedures, the project will minimise its environmental footprint while ensuring compliance with relevant legislation and standards. The project team shall ensure that all gas and heating works are conducted with minimal disruption to near neighbours. Communication is paramount; therefore, prior to commencement, a notification letter detailing the scope and duration of works shall be distributed to all adjacent properties. Noise control measures will be implemented, particularly during mechanical bending and installation activities. All operatives shall utilise equipment fitted with noise-reducing features where possible, and work will be restricted to agreed hours to prevent disturbance. Dust and debris from installation and pipework activities shall be controlled through the use of dust sheets and regular cleaning. All waste materials will be promptly removed from the site to prevent accumulation. For gas purging and connection activities, odour control is critical. The project team shall ensure that any release of gas is managed in a manner that prevents odour nuisance, employing appropriate ventilation and ensuring all connections are secure. In the event of any complaints from neighbours, these shall be logged and addressed promptly by the site manager, who will liaise directly with the affected parties to resolve any issues swiftly. Traffic management plans will be in place to ensure that deliveries and site access do not obstruct local traffic or cause inconvenience to residents. All vehicles will adhere to designated routes and parking areas. By adhering to these procedures, the project team aims to maintain a positive relationship with near neighbours and minimise any potential nuisance arising from the gas and heating works. All personnel involved in gas and heating works must adhere to the following occupational health procedures to ensure their safety and well-being: Exposure to Gas and Fumes: Manual Handling: Use of Tools and Equipment: Noise and Vibration: Thermal Comfort: Chemical Exposure: Electrical Safety: By adhering to these procedures, the risk of occupational health issues can be significantly reduced, ensuring a safer working environment for all involved in the gas and heating works. All amendments to the method statement for gas and heating works must be documented and authorised prior to implementation. Any changes to the procedures, particularly those involving gas purging, connection or break into existing gas mains, and domestic gas boiler upgrades, require immediate notification to the project manager. Authorisation Process:
Identify the Need for Amendment: Any team member who identifies a requirement for change must report it to the site supervisor. This includes changes due to unforeseen site conditions or updates in safety regulations. Documentation: The proposed amendment must be documented in writing, detailing the specific changes and the rationale behind them. This document should include any potential impacts on safety, timelines, and resources. Review and Approval: The documented amendment must be reviewed by the project manager and the health and safety advisor. Particular attention should be given to ensuring compliance with gas safety regulations and maintaining the integrity of existing gas systems. Authorisation: Once reviewed, the amendment must be authorised by the project manager. For significant changes affecting gas safety, additional authorisation from a qualified gas engineer may be required. Communication: All authorised amendments must be communicated to the entire project team, including subcontractors involved in gas and heating works. This ensures that everyone is aware of the new procedures and any additional safety measures. Implementation: Only after authorisation and communication can the amended procedures be implemented on site. Record Keeping: A record of all amendments and authorisations must be maintained as part of the project documentation. This ensures traceability and accountability for all changes made during the project lifecycle. Note: Any unauthorised changes to procedures, especially those involving gas systems, are strictly prohibited and will result in disciplinary action. Natural gas is utilised as a fuel source for heating systems and domestic appliances, providing energy for boilers and other heating equipment. Inhalation : Low (1) Who might be harmed: Construction workers | Gas engineers | Maintenance personnel Type of harm: Asphyxia | Death | Respiratory damage / Asthma / COPD Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Carbon monoxide is not intended for use; it is a hazardous by-product of incomplete combustion in gas appliances and must be carefully monitored to prevent exposure. Inhalation : Low (1) Who might be harmed: Construction workers | Site supervisors | Maintenance personnel Type of harm: Asphyxia | Death | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Solder fumes are an unintended by-product generated during the soldering process when joining metal components, such as copper pipes, in gas and heating works. Inhalation : Low (1) Who might be harmed: Gas and heating engineers | Plumbers | Apprentices and trainees Type of harm: Asphyxia | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Eye Contact : Low (1) Who might be harmed: Gas and heating engineers | Plumbers | Apprentices and trainees Type of harm: Eye Damage Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Skin Contact : Low (1) Who might be harmed: Gas and heating engineers | Plumbers | Apprentices and trainees Type of harm: Dermatitis Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Flux residue is a by-product of the soldering process, used to facilitate the flow of solder by preventing oxidation on metal surfaces during gas and heating works. Inhalation : Low (1) Who might be harmed: Gas and heating engineers | Site labourers | Nearby tradespeople Type of harm: Asphyxia | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Eye Contact : Low (1) Who might be harmed: Gas and heating engineers | Plumbers | Apprentices or trainees Type of harm: Eye Damage Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Skin Contact : Low (1) Who might be harmed: Gas and heating engineers | Plumbers | Apprentices and trainees Type of harm: Dermatitis Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Cleaning solvents are utilised for the removal of grease, oil, and other contaminants from pipework and fittings to ensure secure connections and optimal system performance. Inhalation : Low (1) Who might be harmed: Construction workers handling cleaning solvents | Nearby site personnel Type of harm: Asphyxia | Death | Respiratory damage / Asthma / COPD | Smoke Inhalation Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Eye Contact : Low (1) Who might be harmed: Construction workers | Maintenance personnel Type of harm: Eye Damage Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Skin Contact : Low (1) Who might be harmed: Construction workers handling cleaning solvents | Maintenance personnel | Subcontractors involved in cleaning tasks Type of harm: Dermatitis Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
Site Specific Hazards
Procedures
Personnel and competence
Site inductions and training
Access and egress arrangements
Welfare
Special permits
Tools and equipment
Services and isolations
Hazardous substances
Deliveries and materials handling
PPE
Emergency procedures
Safety of public and occupiers
Asbestos
Monitoring
Waste management
Environmental considerations
Near neighbours and nuisance
Occupational health
Amendments and authorisation
Activities
Preparation and Setup
Gas Purging Procedures
Mechanical Bending of Copper Pipework
Mechanical Bending of Pipework or Conduit
Handheld Bending of Pipework or Conduit
Installation of Containment Tray
Installation of Pipework
Gas Connection or Break-in to Existing Gas Main
Domestic Gas Boiler and System Upgrades and Replacement
Installation of Press Fit Pipework and Fittings
Installation of Heating System
Installation of Associated Fixtures and Fittings
Electrical Heating Controls Installation
Power Flushing of Central Heating System
Testing and Commissioning
Cleaning Up and Finishing
Hazardous Substances
Natural Gas
Carbon Monoxide
Solder Fumes
Flux Residue
Cleaning Solvents
Induction Record
Company name:
Project title:
Location:
Contract No:
Subject:
Method Statement : Gas and Heating Works
Tutor:
Date:
Signature:
Name
Comments
Signature
Date