Risk Assessment and Method Statement Template for Masonry Blockwork and Brickwork
This document should not be used until it has been thoroughly reviewed by a competent person.
| Company name: | |
| Project title: | |
| Location: | |
| Contract No: | |
| Author: | |
| Reviewed by: | |
| Date: | |
| Signature: |
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
Method Statement : Masonry Blockwork and Brickwork
Explanation
Masonry blockwork and brickwork involve the construction of structures using blocks or bricks, which are bonded together with mortar to form walls, partitions, and other architectural elements. The process requires precise setting out of door and window openings to ensure structural integrity and aesthetic alignment. Access to elevated work areas is facilitated through the use of trestles or scaffolding, ensuring safe and efficient operations. The task includes laying a mortar bed, placing bricks or blocks, filling gaps with mortar, and removing excess material to achieve a clean finish. Materials are delivered to work platforms either manually or via telehandler to a designated loading bay, ensuring a steady supply of resources for continuous workflow. The aim of the job is to construct durable, stable, and visually appealing structures that meet design specifications and safety standards.
Responsibilities
- Site Manager: Ensure all safety protocols and procedures are implemented and adhered to on site.
- Supervisor: Oversee the masonry work, ensuring compliance with health and safety regulations.
- Bricklayer: Execute the laying of bricks and blocks safely, following proper techniques and using personal protective equipment.
- Labourer: Assist in the delivery and handling of materials, ensuring safe manual handling practises.
- Scaffold Erector: Assemble and inspect scaffolding to ensure it is safe for use by workers.
- Telehandler Operator: Safely operate the telehandler to transport materials to designated areas.
- Health and Safety Officer: Conduct regular inspections and risk assessments to identify and mitigate potential hazards.
- First Aider: Provide immediate medical assistance in case of injuries or accidents on site.
Equipment
- Brick trowel
- Pointing trowel
- Spirit level
- Tape measure
- Brick hammer
- Bolster chisel
- Line and pins
- Jointing tool
- Mortar board
- Wheelbarrow
- Shovel
- Bucket
- Masonry saw
- Angle grinder
- Mixing drill
- Safety helmet
- Safety goggles
- Dust mask or respirator
- Hearing protection
- High-visibility vest
- Safety gloves
- Steel-toe boots
- Knee pads
Operation
- Conduct a risk assessment to identify potential hazards and implement control measures.
- Ensure all personnel have received appropriate training and are competent in masonry tasks.
- Verify that personal protective equipment (PPE) such as hard hats, gloves, safety boots, and dust masks are available and in good condition.
- Inspect tools and equipment for any defects or damage, ensuring they are fit for use.
- Confirm that scaffolding or trestles are correctly erected, stable, and inspected by a competent person.
- Establish clear access routes and ensure they are free from obstructions and debris.
- Ensure that materials are stored safely and securely, with consideration for manual handling techniques.
- Verify that telehandlers or other lifting equipment are operated by qualified personnel and have been inspected.
- Set out the work area, marking door and window openings accurately according to design specifications.
- Prepare the mortar mix according to specifications, ensuring it is of the correct consistency and strength for the task.
- Spread a layer of mortar on the foundation or previous course using a trowel, ensuring an even and consistent thickness.
- Carefully place each block or brick onto the mortar bed, aligning it with the marked layout. Use a spirit level to ensure each unit is level and plumb.
- Fill gaps between blocks or bricks with mortar, using a trowel to compact and smooth the joints. Ensure all joints are fully filled to prevent structural weaknesses.
- Remove any excess mortar from the surface of the blocks or bricks using a trowel or brush, maintaining a clean and tidy work area.
- Continuously check alignment, level, and plumb of the structure as work progresses, making adjustments as necessary.
- Safely transport materials to the work area by hand or using a telehandler to a designated loading bay. Ensure materials are stored securely to prevent falls or collapses.
- Secure all tools and materials at the end of each workday, ensuring the site is left in a safe condition.
- Conduct a final inspection to confirm all safety measures are in place before leaving the site.
Risk Assessment : Masonry Blockwork and Brickwork
Manual Handling : Low (1)
Who might be harmed: Bricklayers | Labourers | Apprentices
Type of harm: Back / Spinal Injury | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Muscular Injury
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers | Labourers | Apprentices
Type of harm:
Back / Spinal Injury | Muscular Injury
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction Workers | Site Supervisors | Delivery Personnel | Subcontractors
Type of harm:
Back / Spinal Injury | Broken Bones | Death | Head Injury | Multiple / Various Injury | Muscular Injury
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers and Masons | Labourers | Site Supervisors | Nearby Workers
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Respiratory damage / Asthma / COPD
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers | Labourers | Apprentices and Trainees
Type of harm:
Cuts and Abrasions | Eye Damage
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction Workers | Site Supervisors | Delivery Personnel | Adjacent Workers from Other Trades
Type of harm:
Amputation | Back / Spinal Injury | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Death | Head Injury | Multiple / Various Injury
Initial Risk: Major (3) x Frequent (5) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction Workers | Scaffolders | Site Supervisors
Type of harm:
Broken Bones | Death | Head Injury | Multiple / Various Injury
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction Workers | Site Supervisors | Nearby Tradespeople
Type of harm:
Permanent Hearing Damage
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers | Labourers | Machine Operators
Type of harm:
HAVS / Vibration White Finger
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction Workers | Site Supervisors | Subcontractors
Type of harm:
Burns | Death | Smoke Inhalation
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers and blocklayers | Labourers | Site supervisors | Nearby workers on site
Type of harm:
Asbestosis / Lung Cancer / Mesothelioma | Respiratory damage / Asthma / COPD
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers | Labourers
Type of harm:
Eye Damage
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers and masons | Labourers handling materials | Site supervisors and managers | Nearby workers on site
Type of harm:
Respiratory damage / Asthma / COPD
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers and masons | Labourers handling cement | Site supervisors and managers
Type of harm:
Eye Damage
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers | Labourers
Type of harm:
Burns | Dermatitis
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers and masons | Labourers handling mortar | Site supervisors and foremen | Nearby construction workers
Type of harm:
Respiratory damage / Asthma / COPD
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers | Labourers
Type of harm:
Eye Damage
Initial Risk: Severe (4) x Probable (4) = Medium (16)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Bricklayers | Labourers
Type of harm:
Burns | Dermatitis
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Masonry blockwork and brickwork involve the construction of structures using blocks or bricks, which are bonded together with mortar to form walls, partitions, and other architectural elements. The process requires precise setting out of door and window openings to ensure structural integrity and aesthetic alignment. Access to elevated work areas is facilitated through the use of trestles or scaffolding, ensuring safe and efficient operations. The task includes laying a mortar bed, placing bricks or blocks, filling gaps with mortar, and removing excess material to achieve a clean finish. Materials are delivered to work platforms either manually or via telehandler to a designated loading bay, ensuring a steady supply of resources for continuous workflow. The aim of the job is to construct durable, stable, and visually appealing structures that meet design specifications and safety standards. The construction of blockwork or brickwork structures presents several hazards that must be carefully managed to ensure the safety of all personnel involved. Manual handling of heavy blocks and bricks poses a significant risk of musculoskeletal injuries, necessitating proper lifting techniques and the use of mechanical aids where possible. The use of trestles or scaffolding introduces the potential for falls from height, requiring secure and stable access equipment. Dust generated during cutting or grinding can lead to respiratory issues, making appropriate respiratory protective equipment essential. The risk of slips, trips, and falls is heightened by uneven surfaces and debris, necessitating good housekeeping practises. Additionally, the handling of sharp tools and materials can result in cuts and abrasions, while noise from machinery and tools may cause hearing damage if not adequately controlled. The use of telehandlers for material delivery introduces struck-by hazards, requiring careful coordination and communication. Fire hazards from hot work activities must also be considered, with appropriate fire prevention measures in place. This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
Musculoskeletal Disorders : Low (1)
Slips, Trips, and Falls : Low (1)
Dust and Fumes : Low (1)
Cuts and Abrasions : Low (1)
Struck-by Injuries : Low (1)
Working at Height : Low (1)
Noise Exposure : Low (1)
Hand-Arm Vibration Syndrome : Low (1)
Fire Hazards : Low (1)
COSHH Assessment : Masonry Blockwork and Brickwork
Silica dust
Silica dust is not an intended substance for use; rather, it is a hazardous by-product generated during the cutting, grinding, or drilling of materials such as bricks, blocks, and concrete.
Inhalation : Low (1)
Eye Contact : Low (1)
Cement dust
Cement dust is generated during the mixing and handling of cement, which is used as a binding agent in mortar for laying bricks and blocks.
Inhalation : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Mortar additives
Mortar additives are used to enhance the workability, strength, and durability of mortar mixtures in masonry construction.
Inhalation : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Toolbox Talk : Masonry Blockwork and Brickwork
Introduction
Hazards
Masonry Blockwork and Brickwork : Rules
Masonry Blockwork and Brickwork : Warnings
Induction Record
Company name:
Project title:
Location:
Contract No:
Subject:
Risk Assessment and Method Statement : Masonry Blockwork and Brickwork
Tutor:
Date:
Signature:
Name Comments Signature Date