Risk Assessment and Method Statement Template for Sealant / Silicone Application Activities
This document should not be used until it has been thoroughly reviewed by a competent person.
| Company name: | |
| Project title: | |
| Location: | |
| Contract No: | |
| Author: | |
| Reviewed by: | |
| Date: | |
| Signature: |
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
RAMS : Sealant / Silicone Application Activities
Site Specific Instructions
Preparation and Planning
- Ensure all necessary personal protective equipment (PPE) is available, including gloves, safety goggles, and appropriate respiratory protection if required.
- Verify that the work area is well-ventilated, particularly for internal applications, to prevent inhalation of fumes.
- Inspect the surfaces to be sealed, ensuring they are clean, dry, and free from dust or debris.
Application of Sealant (Internal)
- Position all tools and materials within easy reach to minimise unnecessary movement.
- Apply masking tape to adjacent surfaces to protect them from excess sealant.
- Use a caulking gun to apply the sealant evenly along the joint or gap, maintaining a steady hand to ensure a consistent bead.
- Smooth the sealant with a suitable tool or finger, ensuring a neat finish and proper adhesion.
Application of Sealant (Balconies)
- Conduct a risk assessment for working at height if applicable, ensuring all necessary fall protection measures are in place.
- Confirm that the balcony surface is stable and free from hazards such as loose tiles or debris.
- Follow the same application process as for internal areas, taking care to account for external factors such as wind or rain that may affect the application.
Post-Application
- Remove any masking tape carefully before the sealant cures to avoid damaging the finish.
- Inspect the applied sealant for any gaps or imperfections and rectify as necessary.
- Clean all tools and dispose of any waste materials in accordance with site waste management procedures.
Associated Hazards:
Who might be harmed:
Construction workers | Site supervisors | Other trades on site
Type of harm:
Back / Spinal Injury | Broken Bones | Cuts and Abrasions | Death | Head Injury | Muscular Injury | Multiple / Various Injury
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | Maintenance personnel
Type of harm:
Back / Spinal Injury | Broken Bones | Crush / Entrapment | Cuts and Abrasions | Muscular Injury
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | Site supervisors | Nearby tradespeople
Type of harm:
Dermatitis | Eye Damage | Respiratory damage / Asthma / COPD
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | Site supervisors
Type of harm:
Broken Bones | Death | Head Injury | Multiple / Various Injury
Initial Risk: Catastrophic (5) x Occasional (3) = Medium (15)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | Maintenance personnel
Type of harm:
Dermatitis
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | Site supervisors
Type of harm:
Eye Damage
Initial Risk: Major (3) x Occasional (3) = Medium (9)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers | Site supervisors | Nearby tradespeople
Type of harm:
Respiratory damage / Asthma / COPD | Illness
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
All personnel involved in the sealant and silicone application activities must possess the necessary skills and experience to perform the tasks safely and effectively. Only trained and competent operatives shall be permitted to apply sealants, ensuring adherence to manufacturer guidelines and industry standards. Prior to commencing work, operatives must undergo a site-specific induction that highlights the unique risks associated with sealant application, including potential exposure to hazardous substances. This induction will also cover the correct use of personal protective equipment (PPE) and emergency procedures. Operatives must be familiar with the Material Safety Data Sheets (MSDS) for all sealants used, understanding the health risks and safe handling practises. Regular toolbox talks will be conducted to reinforce safe working practises and update personnel on any changes in procedures or materials. Supervisors are responsible for verifying the competence of each operative, ensuring they hold relevant qualifications or have demonstrable experience in sealant application. Continuous on-site supervision is required to monitor compliance with safety protocols and provide immediate guidance if necessary. In the event of any personnel changes, new operatives must be assessed for competence and receive a comprehensive briefing on the specific requirements of the project before being allowed to participate in sealant application activities. All personnel involved in the sealant and silicone application activities must undergo a comprehensive site induction prior to commencing work. This induction will cover the specific risks and safety measures associated with the application of sealants, both internally and on balconies. Key Points: Training Requirements: All operatives must have received training in the safe handling and application of sealants, including the use of any specialised tools or equipment. Evidence of such training must be provided and verified by the site supervisor. Hazard Awareness: The induction will include detailed information on the potential hazards associated with sealant application, such as exposure to hazardous substances, working at height on balconies, and manual handling risks. Safe Work Practises: Operatives will be instructed on the correct procedures for applying sealants, including surface preparation, application techniques, and post-application checks to ensure quality and safety standards are met. Personal Protective Equipment (PPE): The induction will specify the required PPE for sealant application tasks, which may include gloves, eye protection, and respiratory protection, depending on the specific materials used. Emergency Procedures: Specific emergency procedures relevant to sealant application activities will be outlined, including spill response and first aid measures for exposure to sealants. Attendance at the site induction is mandatory, and records of attendance will be maintained. Regular refresher sessions will be conducted to ensure ongoing compliance and awareness of any updates to procedures or safety requirements. Access to the work areas for sealant and silicone application shall be strictly controlled to ensure safety and efficiency. Internal access will be facilitated through designated entry points within the building, ensuring that all personnel are aware of the routes to be used. These routes must be kept clear of obstructions at all times to allow for the safe transport of materials and equipment. For balcony applications, access will be provided via secure scaffolding or mobile elevated work platforms (MEWPs), as appropriate. All access equipment must be inspected and certified safe for use prior to commencement of work. Personnel must be trained and competent in the use of such equipment, with harnesses and fall arrest systems employed where necessary. Egress from both internal and balcony work areas must be clearly marked and unobstructed, allowing for quick evacuation in case of emergency. Emergency exits must be identified during site induction, and all workers must be familiar with these routes. Key points: All personnel involved in the sealant and silicone application activities shall have access to adequate welfare facilities throughout the duration of the project. Welfare provisions must include clean and accessible washing facilities, with running water, soap, and towels, to ensure that operatives can effectively remove any sealant or silicone residues from their skin. Rest areas must be provided, allowing workers to take breaks in a comfortable environment away from the work area, reducing the risk of fatigue and ensuring they are alert when handling sealants. These areas should be equipped with seating and protection from adverse weather conditions, particularly for those working on balconies. Toilet facilities must be readily available and maintained in a hygienic condition. Given the nature of the materials used, it is imperative that these facilities are located at a reasonable distance from the work area to prevent contamination. Eating and drinking areas should be separate from the work zones to prevent ingestion of hazardous substances. Workers must be instructed to wash their hands thoroughly before consuming food or beverages. First aid provisions must be readily accessible, with trained first aiders on site who are familiar with the potential health risks associated with sealant and silicone exposure. This includes having appropriate first aid kits that contain materials suitable for treating skin contact with sealants. Regular welfare inspections shall be conducted to ensure all facilities remain in good condition and are adequately stocked. Any deficiencies must be reported immediately and rectified without delay to maintain a safe and healthy working environment. All personnel involved in the sealant and silicone application activities must ensure compliance with the special permit requirements prior to commencing work. Permits to Work are mandatory for any activities involving the application of sealants, particularly in areas where there is a risk of exposure to hazardous substances or confined spaces. Internal Application: For internal sealant application, a permit is required if the work is conducted in areas with restricted ventilation or where the use of volatile organic compounds (VOCs) is involved. The permit must confirm that adequate ventilation measures are in place and that air quality monitoring has been conducted to ensure safe working conditions. Balcony Application: When applying sealant on balconies, a permit is necessary to address potential fall hazards. The permit must verify that appropriate fall protection systems, such as guardrails or harnesses, are installed and inspected. Additionally, the permit should confirm that weather conditions have been assessed to prevent work during adverse conditions that could compromise safety. All permits must be reviewed and authorised by the site manager or designated health and safety officer. The permits should be displayed prominently at the worksite and must be renewed daily or as specified by the project’s health and safety plan. Compliance with these procedures is essential to ensure the safety of all operatives and adherence to regulatory requirements. All tools and equipment utilised for sealant and silicone application activities must be inspected prior to use to ensure they are in good working condition. Only trained personnel are authorised to operate the equipment. Caulking guns are to be used for the application of sealant. These must be checked for any signs of damage or wear, particularly focusing on the trigger mechanism and nozzle. Any defective caulking guns must be removed from service immediately. Cutting tools, such as utility knives, used for trimming excess sealant, must have retractable blades and be stored safely when not in use. Blades should be replaced regularly to maintain efficiency and safety. Ladders or step stools may be required for accessing higher areas, particularly on balconies. These must be stable, with non-slip feet, and positioned on a firm, level surface. Users must ensure three points of contact at all times. Personal Protective Equipment (PPE), including gloves and safety glasses, must be worn during application to protect against potential contact with sealant materials. All tools and equipment should be cleaned and stored appropriately after use to prevent contamination and ensure readiness for future tasks. All personnel involved in the sealant and silicone application activities must ensure that all electrical services in the vicinity of the work area are isolated prior to commencement. This is crucial to prevent any accidental contact with live circuits, especially when working in internal areas and on balconies where electrical outlets may be present. Before starting the application process, a thorough inspection of the work area must be conducted to identify any hidden services such as plumbing or electrical conduits. If any services are identified, they must be clearly marked and communicated to all team members. For balcony applications, particular attention must be given to external lighting and power supplies. These should be isolated at the main distribution board, and a lock-out/tag-out system should be implemented to ensure they remain de-energised throughout the duration of the work. In instances where isolation is not feasible, appropriate protective measures such as insulated barriers or coverings must be employed to safeguard against accidental contact with live services. All isolations must be documented, and a permit-to-work system should be in place to ensure that no unauthorised re-energisation occurs during the sealant application process. The responsible supervisor must verify and sign off on all isolations before work commences. Upon completion of the sealant application, all services must be reinstated in a controlled manner, ensuring that all safety checks are conducted prior to re-energisation. All personnel involved in the sealant and silicone application activities must be fully aware of the potential hazards associated with the use of these substances. Material Safety Data Sheets (MSDS) for all sealants and silicones to be used on site must be reviewed prior to commencement of work. These documents will provide critical information on handling, storage, and emergency measures. Storage: Sealants and silicones must be stored in a designated area, away from direct sunlight and sources of heat, to prevent degradation or accidental ignition. Containers should be kept sealed when not in use to avoid evaporation and contamination. Handling: Personnel must wear appropriate Personal Protective Equipment (PPE), including gloves and eye protection, to prevent skin contact and eye irritation. Ensure adequate ventilation in enclosed spaces to mitigate inhalation risks. Application: During application, care must be taken to avoid spillage. Any spills should be cleaned immediately using appropriate absorbent materials, and waste should be disposed of in accordance with local regulations. Disposal: Waste sealant and silicone, as well as contaminated materials, must be disposed of in designated hazardous waste containers. Regular checks should be conducted to ensure compliance with waste management protocols. Emergency Procedures: In the event of accidental exposure or spillage, follow the emergency procedures outlined in the MSDS. This includes immediate washing of affected areas with water and seeking medical attention if necessary. Emergency contact numbers should be readily accessible on site. By adhering to these procedures, risks associated with hazardous substances during sealant and silicone application activities can be effectively managed. All deliveries of sealant and silicone materials shall be scheduled to minimise disruption and ensure efficient handling. Deliveries must be coordinated with the site manager to avoid peak times and ensure that access routes are clear. Upon arrival, delivery vehicles shall be directed to the designated unloading area by a competent person. It is imperative that all personnel involved in the unloading process wear appropriate personal protective equipment (PPE), including gloves and safety footwear, to prevent injuries. Materials must be inspected upon delivery for any signs of damage or leakage. Any compromised containers should be reported immediately to the site manager and handled according to the site’s hazardous substances procedure. Sealant and silicone materials shall be stored in a secure, dry location, away from direct sunlight and sources of heat, to maintain their integrity. Storage areas must be clearly marked and organised to prevent accidental spillage or contamination. When handling sealant and silicone containers, manual handling techniques must be employed to prevent strain injuries. If the weight of the materials exceeds safe manual handling limits, mechanical aids such as trolleys or hoists should be utilised. All personnel involved in the handling of these materials must be briefed on the specific risks associated with sealant and silicone products, including potential skin irritation and inhalation hazards. Safety data sheets (SDS) for all products must be readily accessible on site for reference. All personnel involved in the sealant and silicone application activities must adhere to the following Personal Protective Equipment (PPE) procedures: Safety Gloves: It is imperative that operatives wear chemical-resistant gloves at all times during the application of sealants to prevent skin contact with potentially hazardous substances. Safety Goggles: Eye protection is mandatory to shield against accidental splashes of sealant, particularly when working in confined or overhead spaces. Respiratory Protection: When applying sealant in poorly ventilated areas, such as internal spaces, operatives must utilise appropriate respiratory protection to avoid inhalation of fumes. A half-mask respirator with organic vapour filters is recommended. Protective Clothing: Long-sleeved shirts and trousers should be worn to minimise skin exposure. Disposable coveralls may be used for additional protection, especially in environments where spillage is likely. Footwear: Sturdy, slip-resistant safety boots must be worn to ensure stability and protection from slips, trips, and falls, particularly on balcony surfaces which may be uneven or wet. All PPE must be inspected prior to use to ensure it is in good condition and fit for purpose. Any damaged or defective equipment must be replaced immediately. Compliance with these procedures will be monitored regularly to ensure the safety and well-being of all operatives. In the event of an emergency during sealant or silicone application activities, the following procedures must be adhered to: Immediate Response: Upon identifying an emergency, such as a chemical spill or fire, all personnel must cease work immediately and alert others in the vicinity. The designated emergency alarm should be activated without delay. Evacuation: Personnel must evacuate the area promptly, following the pre-determined evacuation routes. It is imperative to avoid using lifts and to proceed to the nearest safe exit. Assembly Point: All workers must report to the designated assembly point, ensuring they are accounted for by the appointed fire marshal or site supervisor. First Aid: In case of exposure to sealant or silicone substances, affected individuals should seek immediate first aid assistance. Eye wash stations and safety showers should be used if necessary, and medical attention sought without delay. Containment of Spills: If safe to do so, trained personnel may attempt to contain any spills using appropriate spill kits. It is crucial to prevent the spread of hazardous substances to minimise environmental impact. Communication: The site manager must be informed of the situation as soon as possible. They will liaise with emergency services and provide them with relevant information regarding the nature of the materials involved. Documentation: A detailed report of the incident must be completed once the situation is under control. This report should include the sequence of events, actions taken, and any recommendations for future prevention. Review and Debrief: Following the incident, a debriefing session should be conducted with all involved personnel to review the response and identify any areas for improvement in emergency procedures related to sealant or silicone application activities. The safety of the public and occupiers during sealant and silicone application activities is of paramount importance. Access to work areas will be strictly controlled to prevent unauthorised entry. Barriers and signage will be erected around the work zones, particularly in areas such as balconies, to clearly demarcate the boundaries and inform individuals of ongoing works. Work schedules will be coordinated to minimise disruption and potential hazards to occupiers, ensuring that activities are conducted during times of low occupancy where possible. Communication with residents will be maintained to inform them of the nature and duration of the works, as well as any specific safety measures they should observe. Ventilation will be ensured in internal areas to mitigate any potential exposure to fumes from sealant materials. Windows and doors adjacent to work areas will be kept closed during application to prevent fumes from entering occupied spaces. Noise levels will be monitored and kept within acceptable limits to avoid disturbance. Dust sheets and protective coverings will be used to safeguard surfaces and prevent contamination of living spaces. In the event of an emergency, clear evacuation routes will be maintained at all times, and workers will be briefed on emergency procedures specific to the site layout. First aid facilities will be readily accessible, and all personnel will be aware of their location. By adhering to these procedures, the safety and well-being of the public and occupiers will be effectively safeguarded throughout the sealant and silicone application process. All personnel involved in the sealant and silicone application activities must be vigilant for any materials suspected to contain asbestos, particularly when working in older buildings or structures. Prior to commencing work, a thorough review of the asbestos register and any relevant surveys must be conducted to identify potential asbestos-containing materials (ACMs) in the vicinity of the work area. If ACMs are identified or suspected: During the application of sealant on balconies or internal areas, care must be taken to avoid disturbing any materials that may contain asbestos. Personnel must be trained to recognise potential ACMs and understand the importance of not disturbing such materials. In the event of accidental disturbance: Regular monitoring and inspections should be conducted to ensure compliance with these procedures, and any changes in site conditions must be communicated promptly to all relevant personnel. The monitoring of sealant and silicone application activities shall be conducted with a focus on ensuring compliance with health and safety standards, as well as maintaining the quality of work. Daily inspections will be carried out by the site supervisor to verify that all operatives are adhering to the specified method statement and risk assessments. Visual checks will be performed to ensure that the sealant is applied evenly and without defects. Any inconsistencies or issues identified must be rectified immediately. The supervisor will also ensure that the correct type of sealant is used for each specific area, particularly distinguishing between internal applications and those on balconies. Environmental conditions such as temperature and humidity will be monitored, as these can affect the curing process of the sealant. The supervisor will ensure that application only occurs within the manufacturer’s recommended parameters. Personal Protective Equipment (PPE) usage will be observed to confirm that all operatives are wearing the necessary gear, including gloves and eye protection, to prevent exposure to potentially harmful substances. Regular tool and equipment checks will be conducted to ensure they are in good working order and suitable for the task. Any defective tools must be reported and replaced immediately. Finally, any incidents or near misses related to the sealant application must be documented and reviewed to prevent recurrence. This information will be used to update procedures and training as necessary. All waste generated from the sealant and silicone application activities shall be managed in accordance with the following procedures: Segregation and Collection: Waste materials, including empty sealant cartridges, used applicators, and any off-cuts or excess sealant, must be segregated at the point of generation. Designated waste containers, clearly labelled for sealant waste, shall be provided on-site to facilitate proper segregation. Storage: All waste containers must be stored in a secure area to prevent unauthorised access and potential environmental contamination. Containers should be checked regularly to ensure they are not overfilled and are in good condition. Disposal: Waste shall be disposed of by a licenced waste carrier in compliance with relevant waste management regulations. Documentation of waste transfer notes must be maintained on-site for audit purposes. Spill Management: In the event of a spill, immediate action must be taken to contain and clean up the spill using appropriate spill kits. All spill residues must be treated as hazardous waste and disposed of accordingly. Minimisation: Efforts should be made to minimise waste by accurately estimating the quantity of sealant required for each task and ensuring efficient application techniques are employed to reduce excess material. Training: All personnel involved in the application of sealants must receive training on the waste management procedures specific to this activity, ensuring compliance and environmental protection. Monitoring and Review: Regular inspections shall be conducted to ensure adherence to these procedures, and any non-compliance shall be addressed promptly. Feedback from these inspections will inform continuous improvement of waste management practises. The application of sealant and silicone, particularly on balconies and internal areas, necessitates careful consideration of environmental impacts. All personnel involved in these activities must adhere to the following procedures to minimise environmental harm: Use of Low-VOC Products: Only sealants and silicones with low volatile organic compound (VOC) content shall be utilised to reduce air pollution and potential health risks. Spill Prevention and Control: Ensure that all containers are securely sealed when not in use. In the event of a spill, immediately contain and clean up using appropriate absorbent materials. Dispose of waste in accordance with local regulations. Waste Management: All waste materials, including empty containers and used applicators, must be collected and disposed of in designated waste bins. Regular checks should be conducted to ensure no waste is left on site. Protection of Watercourses: When working on balconies, ensure that no sealant or silicone enters drainage systems. Use protective barriers or covers to prevent contamination of watercourses. Noise Control: Limit the use of power tools to designated hours to minimise noise pollution, particularly in residential areas. Dust Suppression: Although minimal dust is expected from sealant application, any preparatory work that generates dust must be controlled using dust suppression techniques. Training and Awareness: All operatives must receive training on environmental procedures specific to sealant application. This includes understanding the importance of using environmentally friendly products and proper waste disposal methods. By adhering to these procedures, the project aims to mitigate any adverse environmental impacts associated with sealant and silicone application activities. The application of sealant, particularly on balconies, may generate noise and odours that could potentially disturb near neighbours. To mitigate these nuisances, the following procedures shall be implemented: Noise Control: The use of powered tools for sealant application shall be minimised. Manual application methods will be prioritised to reduce noise levels. Work will be scheduled during standard working hours to avoid disturbance during early mornings, evenings, and weekends. Odour Management: Only low-odour sealants will be utilised to minimise the impact on neighbours. Adequate ventilation will be ensured during internal applications to disperse any odours quickly. Communication: Prior to commencement of works, a notice will be distributed to neighbouring properties informing them of the nature and duration of the sealant application activities. Contact details for the site manager will be provided for any concerns or queries. Monitoring: Regular checks will be conducted to ensure compliance with noise and odour control measures. Any complaints received from neighbours will be logged and addressed promptly. Site Cleanliness: All materials and equipment will be stored neatly and securely to prevent any visual nuisance. Waste generated from the sealant application will be disposed of promptly and in accordance with site waste management procedures. The application of sealant and silicone involves exposure to potentially hazardous substances. Personnel must adhere to the following procedures to mitigate occupational health risks: Material Safety Data Sheets (MSDS): Prior to commencing work, operatives must review the MSDS for each sealant product to understand the specific health hazards and recommended control measures. Ventilation: Ensure adequate ventilation in enclosed spaces to prevent the accumulation of fumes. Where natural ventilation is insufficient, mechanical ventilation must be employed. Personal Protective Equipment (PPE): Operatives are required to wear appropriate PPE, including nitrile gloves, safety goggles, and respiratory protection if specified by the MSDS. Skin Contact: Avoid direct skin contact with sealants. In the event of accidental contact, affected areas should be washed immediately with soap and water. Fume Inhalation: Minimise inhalation of fumes by maintaining a safe distance from the application area and using extraction systems where necessary. Hygiene Practises: Personnel must refrain from eating, drinking, or smoking in the vicinity of sealant application areas. Hands should be thoroughly washed before breaks and at the end of shifts. Training: All operatives must receive training on the safe handling and application of sealants, including recognition of symptoms of overexposure and appropriate first aid measures. Health Surveillance: Regular health surveillance should be conducted for operatives frequently exposed to sealants, focusing on respiratory and dermatological health. By adhering to these procedures, the risk of occupational health issues associated with sealant and silicone application can be effectively managed. All amendments to the method statement for sealant and silicone application activities must be documented and authorised prior to implementation. Any proposed changes to the procedures, materials, or personnel involved in the application of sealant, whether internal or on balconies, must be communicated to the project manager in writing. The project manager will review the proposed amendments to ensure they comply with health and safety regulations and do not compromise the integrity of the work. Upon approval, the project manager will issue a formal authorisation, which must be signed and dated. All personnel involved in the sealant application must be informed of any amendments before commencing work. This includes a briefing on any new risks or changes in procedure. The site supervisor is responsible for ensuring that all team members have acknowledged and understood the amendments. Records of all amendments and authorisations must be maintained on-site for the duration of the project. These records should be readily accessible for inspection by health and safety officers or other relevant authorities.Site Specific Hazards
Slips, trips, and falls : Low (1)
Manual handling injuries : Low (1)
Exposure to hazardous substances : Low (1)
Working at height : Low (1)
Contact dermatitis : Low (1)
Eye injuries : Low (1)
Inhalation of fumes : Low (1)
Procedures
Personnel and competence
Site inductions and training
Access and egress arrangements
Welfare
Special permits
Tools and equipment
Services and isolations
Hazardous substances
Deliveries and materials handling
PPE
Emergency procedures
Safety of public and occupiers
Asbestos
Monitoring
Waste management
Environmental considerations
Near neighbours and nuisance
Occupational health
Amendments and authorisation
Activities
Preparation and Setup
Surface Cleaning and Inspection
Masking and Protection of Adjacent Areas
Selection and Preparation of Sealant Material
Application of Sealant (Internal)
Application of Sealant (Balconies)
Use of Application Tools and Equipment
Smoothing and Finishing of Sealant Joints
Removal of Masking Materials
Inspection and Quality Assurance
Cleaning of Tools and Equipment
Site Clean-up and Waste Disposal
Hazardous Substances
Silicone sealant
Silicone sealant is intended for use in providing a flexible, waterproof seal in joints and gaps, particularly in areas subject to movement or moisture exposure.Inhalation : Low (1)
Who might be harmed: Construction workers applying the sealant | Nearby tradespeople
Type of harm: Respiratory damage / Asthma / COPD
Initial Risk: Major (3) x Probable (4) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers applying the sealant | Nearby tradespeople working in close proximity
Type of harm:
Eye Damage
Initial Risk: Catastrophic (5) x Probable (4) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers applying the sealant
Type of harm:
Dermatitis
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers applying sealant | Nearby tradespeople
Type of harm:
Asphyxia | Death | Respiratory damage / Asthma / COPD | Smoke Inhalation
Initial Risk: Severe (4) x Frequent (5) = High (20)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers applying sealant | Site supervisors overseeing the work
Type of harm:
Eye Damage
Initial Risk: Catastrophic (5) x Frequent (5) = High (25)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
Who might be harmed:
Construction workers applying sealant
Type of harm:
Dermatitis
Initial Risk: Severe (4) x Occasional (3) = Medium (12)
Controls
Residual Risk: Minor (1) x Improbable (1) = Low (1)
This document has been provided as a template. By completing the section above, you take full responsibility for the use of this document.
Eye Contact : Low (1)
Skin Contact : Low (1)
Solvent-based cleaners
Solvent-based cleaners are intended for the removal of contaminants and preparation of surfaces prior to the application of sealant.
Inhalation : Low (1)
Eye Contact : Low (1)
Skin Contact : Low (1)
Induction Record
Company name:
Project title:
Location:
Contract No:
Subject:
Method Statement : Sealant / Silicone Application Activities
Tutor:
Date:
Signature:
Name Comments Signature Date